Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 LAccepted-AOC 4 13A PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹1.3 L Quoted ₹1.1 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ANNAI ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for drawl of new Air diffuser with volume control damper from Central Stores to respective area of Air Washer System discharge duct of unit I to IV turbine floor, battery charger room, cable gallery room and Switch gear room stage I & II and devolution of worn out Air diffuser to Central Stores (Lorry will be supplied by TANGEDCO).
{The above work is inline with loading and Unloading of new cooling coils from central stores to Air Handling Unit's of Unit IV & V AC Plant room and devolution of the worn out cooling coils as scraps to store} | 1 | Opn. | 4,893 ₹4,893 |
| 2.00 | Charges for dismantling the existing damaged air grill diffusers and re-fixing the new Air diffuser with volume control damper and proper matching with existing flanges in Air Washer System discharge duct of unit I to IV turbine floor, battery charger room, cable gallery room and Switch gear room stage I & II (New Air diffuser with volume control damper will be supplied by TANGEDCO) | 172 | Nos | 575 ₹98,900 |
| 3.00 | Charges for consumables and T & Ps | 1 | LS | 2,955 ₹2,955 |
Tender Value
Refer Docs
EMD Value
₹1,200
Closing Date
16 Aug 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant AC Plant Air Washer System Renewal of existing damaged Air grill Discharge diffuser with volume control dampers in air ducts at various location of Air washer system discharge duct of unit I to IV turbine floor battery charger
2024_EB_469207_1
CE / MTPS-I / SE / M-I / MP /OT.136 / 2024-25
Open Tender
Power/Energy Projects/Products
40 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹1,200
Yes
20 May 2026
2 Aug 2024
17 Aug 2024
2 Aug 2024
16 Aug 2024
2 Aug 2024
Amount
Charges for drawl of new Air diffuser with volume control damper from Central Stores to respective area of Air Washer System discharge duct of unit I to IV turbine floor, battery charger room, cable gallery room and Switch gear room stage I & II and devolution of worn out Air diffuser to Central Stores (Lorry will be supplied by TANGEDCO). {The above work is inline with loading and Unloading of new cooling coils from central stores to Air Handling Unit's of Unit IV & V AC Plant room and devolution of the worn out cooling coils as scraps to store}
Charges for dismantling the existing damaged air grill diffusers and re-fixing the new Air diffuser with volume control damper and proper matching with existing flanges in Air Washer System discharge duct of unit I to IV turbine floor, battery charger room, cable gallery room and Switch gear room stage I & II (New Air diffuser with volume control damper will be supplied by TANGEDCO)
Charges for consumables and T & Ps
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_557509.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid