Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical NEAR LAXMI WOOLLEN MILL SARVODAYA BASTI BIKANER BIKANER BIKANER BIKANER RAJASTHAN 334004 | BIKANER | RAJASTHAN | 334004 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹39.8 L
EMD Value
₹79,600
Closing Date
18 Aug 2026, 11:00 amClosed
EXECUTIVE ENGINEER BDA BIKANER
BDA CAMPUS BIKANER
E-BID-15-2026-27 WORK NO 01
2026_UITBK_587822_1
E-BID-15-2026-27
Open Tender
Civil Works
Percentage
90 days
BDA BIKANER
E-BID-15-2026-27 WORK NO 01
2 documents required · 2 mandatory
₹1,000
SECRETARY BDA BIKANER
₹79,600
Yes
18 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. | 189.75 | Cum | 538 | ₹1,02,085.5 |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m,including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter.
All kinds of soils | 60 | Cum | 178 | ₹10,680 |
| 3 | Carriage of Earth sand line Murom with all leads. 5 km | - | Cum | 125 | - |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 55 | CUM | 3,302 | ₹1,81,610 |
| 5 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 18 | Cum | 2,838 | ₹51,084 |
| 6 | Brick work with clay flyash F.P.S. brick (IS 13757- 1993 ) of class designation 75 in superstructure above plinth level upto floor five level in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 190 | Cum | 4,832 | ₹9,18,080 |
| 7 | Add extra for Square or Rectangular Pillars in Superstructre brick work up to five storey Upto 45 cm length and two corners are free | 73 | Cum | 163 | ₹11,899 |
| 8 | Making grooves as per design in plaster 10mm to 20mm wide. | 3,300 | Rm | 7 | ₹23,100 |
| 9 | Providing & fixing precast cement concrete coping 1 : 2: 4 mix 50mm thick complete as per specification : | 167 | Sqm | 367 | ₹61,289 |
| 10 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish : 20mm thick. | 2,221 | Sqm | 190 | ₹4,21,990 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1043887.xls
BOQ • 0.39 MB
SC01.pdf
Tender Documents • 2.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .