Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L1₹9.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 3 | L1₹9.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 4 | L1₹9.8 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 5 | L1₹9.8 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹11.6 L
EMD Value
₹57,757
Closing Date
20 Apr 2026, 3:00 pmClosed
CHIEF ENGG NAGAR NIGAM MEERUT
NNM
Construction of drain and CC road from Chhote Kumar to Amash Tempo and nearby lanes in Ward 88 Shyamnagar
2026_NNMEE_1136394_8
61/SNV-17TENDER/2026
Open Tender
Civil Works
Fixed-rate
60 days
MEERUT
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,360
MUNICIPAL COMMISSIONER NAGAR NIGAM
₹57,757
5 May 2026
13 Apr 2026
20 Apr 2026
13 Apr 2026
20 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work filling including 12 k.m. lead | - | Cum | - | - |
| 2 | Concrete with 4 cm. gauge Brick Ballast fine sand of 1.25 F.M. and cement in proportion are 12:6:1 in foundation and under floors, including supply of all materials, labour. T & P etc. Required for proper completion the work. | - | Cum | - | - |
| 3 | M-150 brick work in 1:4 one cement and four course sand mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work. | - | Cum | - | - |
| 4 | Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | - | Cum | - | - |
| 5 | 12 mm thick plaster 1:4 with Cement and four course sand including supply all material and labour, T & etc. | - | Sqm | - | - |
| 6 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Slab excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. | - | Cum | - | - |
| 7 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. | - | Qtl | - | - |
| 8 | Supply and stacking 53mm to 22.5mm size stone ballast. | - | Cum | - | - |
| 9 | Laying spreading and consolidation but upto 10cm. (loose) thick coat. but excluding roller charges. | - | Cum | - | - |
| 10 | Construction of un-reinforced, without dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints as per norms, applying debonding strips primer, sealant, near approaches to bridge/ culvert and construction, joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including Cost of Polythene Sheet and Dowel bar and also including complete shifting of matrials & Concrete etc.(M-30) but when thikness of CC is less then 20 cm. (without dowel Bar) | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2122344.xls
BOQ • 0.25 MB
NNMT1.pdf
Tender Documents • 3.36 MB
6-17.pdf
Additional Documents • 2.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .