Tender Value
₹60 L
EMD Value
₹1.2 L
Closing Date
21 Sept 2026, 4:00 pm
EXECUTIVE ENGINEER WATER WORKS DIVISION SRINAGAR
SRINAGAR
PLEASE REFER TO BOQ
2026_PHE_324235_1
33/WWD/Sgr/Civil of 2026-27
Open Tender
Civil Works
Percentage
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER WATER WORKS DIVISION SRINAGAR
₹1.2 L
10 Sept 2026
10 Sept 2026
22 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.In All kinds of Soils | 127.5 | cum | 187.3 | ₹23,880.75 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: In All kinds of Soils | 66.98 | cum | 479.3 | ₹32,103.51 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 60.23 | cum | 218.4 | ₹13,154.23 |
| 4 | Demolishing cement concrete/ R.C.C manually/by mechanical means including disposal of material within 50meters lead as per direction of Eng.- in charge:1:3:6 or richer mix (i/c equivalent design mix) | 17.7 | cum | 1,725.2 | ₹30,536.04 |
| 5 | Desilting of zero effluent Pre Settling chamber Clarifloculator by manual means including use of tools etc as required .complete job . | 414 | cum | 200 | ₹82,800 |
| 6 | Supply and packing of boulder - filling hand packed and Graded to minimize void space including second class sand as filler- all complete.(Incl. carriage), actual qty as per execution and subsequent measurement. | 192.3 | cum | 1,500 | ₹2,88,450 |
| 7 | Providing/ laying of stone soling hand packed in trenches incld carriage | 6.3 | cum | 1,000 | ₹6,300 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 69.92 | cum | 6,591.25 | ₹4,60,860.2 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.38 | cum | 7,104.35 | ₹24,012.7 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.04 | cum | 9,821.85 | ₹49,502.12 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_1093391.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .