| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 LAccepted-AOC | L1 | Accepted-AOC Lowly quoted rate than estimate rate | |
| 2 | L2₹38.2 L+₹42,637.13 (1.13%)Rejected-Finance | L2 | Rejected-Finance Highly Quoted Rate Than Estimate Rate |
Tender Value
₹50.9 L
EMD Value
₹50,910
Closing Date
30 May 2023, 3:00 pmClosed
Block development officer
Block development officer, Ammapettai
Package No 02 - Renovation of 25 Nos of School Buildings, School Toilets and School Kitchen Sheds in Ammapet Block under SIDS - 2022-23
2023_RDTN_318255_2
Rc.No.3636/2022/A2 Dated.22.05.2023
Open Tender
Civil Works
Item Rate
180 days
Union office Ammapettai
As per Tender document
9 documents required · 9 mandatory
₹0
₹50,910
Yes
18 Jul 2023
22 May 2023
30 May 2023
22 May 2023
30 May 2023
22 May 2023
Amount
Part 01: Renovation of PUE School in Neithalur at Annappanpettai Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Painting with two coats old iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Electrification Charges
Supply and fixing of Tube Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Providing Plinth Protection
Earth work Excavation and depositing on bank with initial lead and lift in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for foundation
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5 mix usihg country bricks of ncluding cost and conveyance and all other labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing cupboard arrangements for students
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing Rainwater Harvesting
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good river sand including cost, Conveyance of all labour charges etc.,
Suplying and filling with 40 mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and filling with 20mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and erecting the 900 mm dia RCC Rings
Supplying and fixing of 900 mm cover slab
Cost and supply of 110 mm dia PVC Rain water down fall pipe including cost & Conveyance & Labour Charges etc complete.,
Cost and supply of 110mm dia PVC Elbow including cost & conveyance etc.,
Display Board
Part 02: Renovation of PUE School North Facing RCC Building Annappanpettai at Annappanpettai Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Blackboard painting work for one coats painting including cost and conveyence of all material etc complete
Painting with two coats old iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Electrification Charges
Supply and fixing of Tube Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for students
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing Rainwater Harvesting
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good river sand including cost, Conveyance of all labour charges etc.,
Suplying and filling with 40 mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and filling with 20mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and erecting the 900 mm dia RCC Rings
Supplying and fixing of 900 mm cover slab
Cost and supply of 110 mm dia PVC Rain water down fall pipe including cost & Conveyance & Labour Charges etc complete.,
Cost and supply of 110mm dia PVC Elbow including cost & conveyance etc.,
Display Board
Part 03: Renovation of PUE School in Kattukurichi at Annappanpettai Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dismantling the flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Blackboard painting work for one coats painting including cost and conveyence of all material etc complete
Painting with two coats old iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Electrification Charges
Supply and fixing of Tube Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Providing Plinth Protection
Earth work Excavation and depositing on bank with initial lead and lift in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for foundation
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5 mix usihg country bricks of ncluding cost and conveyance and all other labour charges etc., completed
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing cupboard arrangements for students
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing Rainwater Harvesting
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good river sand including cost, Conveyance of all labour charges etc.,
Suplying and filling with 40 mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and filling with 20mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and erecting the 900 mm dia RCC Rings
Supplying and fixing of 900 mm cover slab
Cost and supply of 110 mm dia PVC Rain water down fall pipe including cost & Conveyance & Labour Charges etc complete.,
Cost and supply of 110mm dia PVC Elbow including cost & conveyance etc.,
Display Board
Part 04: Renovation of PUE SSA School East Facing RCC Building at Annappanpettai Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Supply and fixing of New pressed tiles mortar 1:3 to full depth of tiles, using crude oil 10% by weight of cement including cost and conveyance of all materials to site and all labou charges etc complete for 10 sqm
Plastering with cement mortar 1:3 mix to 10mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Blackboard painting work for one coats painting including cost and conveyence of all material etc complete
Painting with two coats old iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Electrification Charges
Supply and fixing of LED Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing cupboard arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing Rainwater Harvesting
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good river sand including cost, Conveyance of all labour charges etc.,
Suplying and filling with 40 mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and filling with 20mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and erecting the 900 mm dia RCC Rings
Supplying and fixing of 900 mm cover slab
Cost and supply of 110 mm dia PVC Rain water down fall pipe including cost & Conveyance & Labour Charges etc complete.,
Cost and supply of 110mm dia PVC Elbow including cost & conveyance etc.,
Display Board
Part 05: Renovation of PUE School in Ponthiyakulam at Annappanpettai Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dismantling the flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Blackboard painting work for one coats painting including cost and conveyence of all material etc complete
Painting with two coats old wood of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Electrification Charges
Supply and fixing of LED Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing cupboard arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing Rainwater Harvesting
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good river sand including cost, Conveyance of all labour charges etc.,
Suplying and filling with 40 mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and filling with 20mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and erecting the 900 mm dia RCC Rings
Supplying and fixing of 900 mm cover slab
Cost and supply of 110 mm dia PVC Rain water down fall pipe including cost & Conveyance & Labour Charges etc complete.,
Cost and supply of 110mm dia PVC Elbow including cost & conveyance etc.,
Display Board
Part 06: Renovation of PUE School East Facing RCC Building in Perumakkanallur Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dismantling the flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
C.C. 1:4:8 mix yusing 40mmHBG metal including cost & conveyance & Labour charges etc., complete
Blackboard painting work for one coats painting including cost and conveyence of all material etc complete
Painting with two coats old iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Electrification Charges
Supply and fixing of LED Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing cupboard arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing Rainwater Harvesting
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good river sand including cost, Conveyance of all labour charges etc.,
Suplying and filling with 40 mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and filling with 20mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and erecting the 900 mm dia RCC Rings
Supplying and fixing of 900 mm cover slab
Cost and supply of 110 mm dia PVC Rain water down fall pipe including cost & Conveyance & Labour Charges etc complete.,
Cost and supply of 110mm dia PVC Elbow including cost & conveyance etc.,
Display Board
Part 07: Renovation of PUE School Mangalore Tiles Building at Perumakkanallur Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dismantling the flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Removing and adjusting mangalore roofing tiles (Labour only) - 10 Sqm
Supplying and fixing of Poly Urethane Foam Panel ( PUF Panel - Roofing)
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Blackboard painting work for one coats painting including cost and conveyence of all material etc complete
Painting with two coats old iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Painting with two coats old wood of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Electrification Charges
Supply and fixing of LED Light
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Supply and fixing of 15 Amps plug point
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Display Board
Part 08: Renovation of PUE School East Facing RCC Building at Suraikayur Panchayat
Dismantling ṭhe pressed tiles including cost & conveyance, labour charges etc..,
Dismantling and chīppīng of concrete in full depth in cement mortarwith 40mm metal etc.,
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Painting the wall two coats with approved weather proof Emulsion paint over one coat cement plastered wall surface etc., completecomplying with standarad specification.
Blackboard painting work for one coats painting including cost and conveyence of all material etc complete
Painting with two coats old iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Painting with two coats new iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Supplying and fixing new steel doors and windows including welding and all labour charges etc., complete.
Repairs to steel doors and windows including welding and fixing cost & conveyance etc., complete as per standarad specifications.
Electrification Charges
Supply and fixing of LED Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing cupboard arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing Rainwater Harvesting
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good river sand including cost, Conveyance of all labour charges etc.,
Suplying and filling with 40 mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and filling with 20mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and erecting the 900 mm dia RCC Rings
Supplying and fixing of 900 mm cover slab
Cost and supply of 110 mm dia PVC Rain water down fall pipe including cost & Conveyance & Labour Charges etc complete.,
Cost and supply of 110mm dia PVC Elbow including cost & conveyance etc.,
Display Board
Part 09: Renovation of PUE School South Facing Mangalore Tiles Building at Thirukarukavur Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dismantling the flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Dismantling the tiles roof in full depth in cement mortarwith 40mm metal etc.,
Supplying and fixing of Poly Urethane Foam Panel ( PUF Panel - Roofing)
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Painting the wall two coats with approved weather proof Emulsion paint over one coat cement plastered wall surface etc., completecomplying with standarad specification.
Painting with two coats old wood of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Repairs to steel doors and windows including welding and fixing cost & conveyance etc., complete as per standarad specifications.
Electrification Charges
Supply and fixing of LED Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing cupboard arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Display Board
Part 10: Renovation of PUE School East Facing North Side Building at Thirukarukavur Panchayat
Dismantling ṭhe pressed tiles including cost & conveyance, labour charges etc..,
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Painting the wall two coats with approved weather proof Emulsion paint over one coat cement plastered wall surface etc., completecomplying with standarad specification.
Blackboard painting work for one coats painting including cost and conveyence of all material etc complete
Painting with two coats old iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Repairs to steel doors and windows including welding and fixing cost & conveyance etc., complete as per standarad specifications.
Electrification Charges
Supply and fixing of LED Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing cupboard arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing Rainwater Harvesting
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good river sand including cost, Conveyance of all labour charges etc.,
Suplying and filling with 40 mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and filling with 20mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and erecting the 900 mm dia RCC Rings
Supplying and fixing of 900 mm cover slab
Cost and supply of 110 mm dia PVC Rain water down fall pipe including cost & Conveyance & Labour Charges etc complete.,
Cost and supply of 110mm dia PVC Elbow including cost & conveyance etc.,
Display Board
Part 11: Renovation of PUE School East Facing South Side Building at Thirukarukavur Panchayat
Dismantling ṭhe pressed tiles including cost & conveyance, labour charges etc..,
Chipping of flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Supplying and erecting centering shuttering including necessary supports for plane roof slabs, staircase steps, bed blocks, critical pier etc.,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost & conveyance of all materials to site and all
Supplying and fabrication of steel incluiding cost and conveyance of sgteel to site and all labour charges for straightening, cutting to length
Plastering with cement mortar 1:3 mix to 10mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Painting the wall two coats with approved weather proof Emulsion paint over one coat cement plastered wall surface etc., completecomplying with standarad specification.
Blackboard painting work for one coats painting including cost and conveyence of all material etc complete
Painting with two coats old iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Repairs to steel doors and windows including welding and fixing cost & conveyance etc., complete as per standarad specifications.
Electrification Charges
Supply and fixing of LED Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
WT bulk head fitting for 11W CFL (SD 84)
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing cupboard arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing Rainwater Harvesting
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good river sand including cost, Conveyance of all labour charges etc.,
Suplying and filling with 40 mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and filling with 20mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and erecting the 900 mm dia RCC Rings
Supplying and fixing of 900 mm cover slab
Cost and supply of 110 mm dia PVC Rain water down fall pipe including cost & Conveyance & Labour Charges etc complete.,
Cost and supply of 110mm dia PVC Elbow including cost & conveyance etc.,
Display Board
Part 12: Renovation of PUE School West Facing RCC Building at Thirukarukavur Panchayat
Dismantling ṭhe pressed tiles including cost & conveyance, labour charges etc..,
Chipping of flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Earth work Excavation in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for foundation SS20A
Sand filling with good river sand including cost and conveyance of all materials and all labour cahrges etc., complete.
CC 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour cahrges etc., complete.
Brick work in CM 1:5 including cost & conveyance of all materials & labour charges etc.,
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Painting the wall two coats with approved weather proof Emulsion paint over one coat cement plastered wall surface etc., completecomplying with standarad specification.
Blackboard painting work for one coats painting including cost and conveyence of all material etc complete
Painting with two coats old iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Repairs to steel doors and windows including welding and fixing cost & conveyance etc., complete as per standarad specifications.
Electrification Charges
Supply and fixing of LED Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing cupboard arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing Rainwater Harvesting
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good river sand including cost, Conveyance of all labour charges etc.,
Suplying and filling with 40 mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and filling with 20mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and erecting the 900 mm dia RCC Rings
Supplying and fixing of 900 mm cover slab
Cost and supply of 110 mm dia PVC Rain water down fall pipe including cost & Conveyance & Labour Charges etc complete.,
Cost and supply of 110mm dia PVC Elbow including cost & conveyance etc.,
Display Board
Part 13: Renovation of PUE School West Facing Mangalore Tiles Building at Thirukarukavur Panchayat
Clean removal of plastered surface from walls including cost & conveyance, labour charges etc..,
Chipping of flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Best mangalore ceiling tiles including cost and conveyance of all materials to site and all labour charges for mixing laying, curing etc., complete.
Plastering with cement mortar 1:3 mix to 10mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Painting the wall two coats with approved weather proof Emulsion paint over one coat cement plastered wall surface etc., completecomplying with standarad specification.
Blackboard painting work for one coats painting including cost and conveyence of all material etc complete
Painting with two coats old iron of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Painting with two coats old wood of good enemal paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Repairs to doors and windows including welding and fixing cost & conveyance etc., complete as per standarad specifications.
Electrification Charges
Supply and fixing of LED Light
Supply and fixing of 15 Amps plug point
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Providing chappal Rack Arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Providing cupboard arrangements for teachers
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Supply & Fixing of 35mm thk.single leaf high density interior grade marine plywood shutters pasted both sides 1.5mm thk.laminate approved design with 35x12mm T.W.lipping on all edges with necessary adhesives and CP screws complying with standard specification.The cost is inclusive of 1 no cylindrical Lock,handel,tower bolt ,approved equivalent make SS ball bearing hinges of quivalent make of aproved make,2 no floor mounted SS door stoper ect.complete as per drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5mm thk Laminate Basic Cost:810/M2 .
Providing cupboard arrangements
Brick work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed
Flooring with cuddapah slabs 50mm thick over a bed of concrete 100mm
Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed
Distember two coats with best approvde including cost of materils and all labour charges etc., completed
Display Board
Part 14: Renovation of PUE School Kitchen Shed at Thirukarukavur Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dismantling the flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Dismantling the pressed tiles including cost & conveyance, labour charges etc..,
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:3 mix to 10mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with one course of pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
White washing with single coats including cost & conveyance of all materials and labour charges etc.,
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Painting with two coats old iron paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Repairs to steel doors and windows including welding and fixing cost & conveyance etc., complete as per standarad specifications.
Electrification Charges
Supply and fixing of LED Light
Supply and fixing of 1200mm (48") AC ceiling fan complete with stepped electronic 300W regulator with 1 meter down rod on the existing clamp (SD 110)
Service wire (SD 66)
WT bulk head fitting for 11W CFL (SD 84)
Providing Rainwater Harvesting
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good river sand including cost, Conveyance of all labour charges etc.,
Suplying and filling with 40 mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and filling with 20mm metal including cost and conveyance of all materials to site including watering and compacting etc complete.
Suplying and erecting the 900 mm dia RCC Rings
Supplying and fixing of 900 mm cover slab
Cost and supply of 110 mm dia PVC Rain water down fall pipe including cost & Conveyance & Labour Charges etc complete.,
Cost and supply of 110mm dia PVC Elbow including cost & conveyance etc.,
Part 15: Renovation of PUE School Kitchen Shed in Annappanpettai Panchayat
Dismantling the flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
White washing with single coats including cost & conveyance of all materials and labour charges etc.,
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Painting with two coats old iron of good enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Supplying and fixing new steel doors and window including welding and all labour charges etc., complete.
Provision for name board
Part 16: Renovation of PUE School Kitchen Shed in Ponthiyakulam at Annappanpettai Panchayat
Dismantling the flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
White washing with single coats including cost & conveyance of all materials and labour charges etc.,
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Painting with two coats old iron of good enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Part 17: Renovation of PUE School Kitchen Shed at Perumakkanallur Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:3 mix to 10 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
White washing with single coats including cost & conveyance of all materials and labour charges etc.,
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Painting with two coats old iron of good enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Provision for name board
Part 18: Renovation of PUE School Girls Toilet in Thirukarukavur Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Earth work Excavation and depositing on bank with initial lead and lift in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for foundation as per SS20A
Sand filling with good river sand including cost & conveyance of all materials and all labour charges etc completed.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost & conveyance of all materials and all labour charges etc completed.
Brick work in CM 1:5 mix usihg country bricks including cost and conveyance and all other labour charges etc., completed
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:5 mix to 12mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
White washing with single coats including cost & conveyance of all materials and labour charges etc.,
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Repairs to steel door for toilet and urinal ares including welding charges etc., complete.
Toilet door (0.85x2.10)
Toilet door (0.85x1.50)
Painting with two coats old steel door enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Provision for name board
Part 19: Renovation of PUE School Toilet in Kattukurichi at Annappanpettai Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dismantling the flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Floor finishing with ceramic tiles of size 20cmx20cm ncluding cost & conveyance, labour charges etc..,
Dadooing of walls with colour glazed tiles of size 150x150x6 mm of best quality laid in cm 1:2 10mm thick & pointing with white cement using 0.4 kg/cm2
Plastering with cement mortar 1:5 mix to 12 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
White washing with single coats including cost & conveyance of all materials and labour charges etc.,
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Supply & fixing of indian water closet 580x440cm of size
Painting with two coats old iron of good enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Painting with two coats new iron of good enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Supplying and fixing new steel doors and window including welding and all labour charges etc., complete.
Provision for name board
Part 20: Renovation of PUE School Girls Toilet at Annappanpettai Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dismantling the flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Paving the flooring with special type of Pre - polished concrete anti - skid step tiles of 20mm thick (20mm thick) in CM 1:3, 20mm thick
Plastering with cement mortar 1:5 mix to 12 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
White washing with single coats including cost & conveyance of all materials and labour charges etc.,
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Painting with two coats old iron of good enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Provision for name board
Part 21: Renovation of PUE School Boys Toilet at Annappanpettai Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dismantling the flooring concrete in full depth in cement mortarwith 40mm metal etc.,
Paving the flooring with special type of Pre - polished concrete anti - skid step tiles of 20mm thick (20mm thick) in CM 1:3, 20mm thick
Plastering with cement mortar 1:5 mix to 12 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
White washing with single coats including cost & conveyance of all materials and labour charges etc.,
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Painting with two coats old iron of good enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Provision for name board
Part 22: Renovation of PUE School Toilet in Neithalur at Annappanpettai Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Floor finishing with ceramic tiles of size 20cmx20cm ncluding cost & conveyance, labour charges etc..,
Plastering with cement mortar 1:3 mix to 10 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Plastering with cement mortar 1:5 mix to 12 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
White washing with single coats including cost & conveyance of all materials and labour charges etc.,
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Painting with two coats old iron of good enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Earth work Excavation and depositing on bank with initial lead and lift in all classes of soil except hard rock requiring blasting including all labour charges etc.,complete for foundation as per SS20B
Providing soakpit rings (2 x 3) = 6 nos
Providing soakpit rings (2 x 3) = 6 nos
Provision for supplying and fixing P.V.C rainwater down fall pipe of 110mm dia
Provision for name board
Part 23: Renovation of PUE School Toilet & Urinal I in Ponthiyakulam at Annappanpettai Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dadooing of walls with colour glazed tiles of size 150x150x6 mm of best quality laid in cm 1:2 10mm thick & pointing with white cement using 0.4 kg/cm2
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:5 mix to 12 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Painting with two coats old iron of good enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Provision for name board
Part 24: Renovation of PUE School Toilet & Urinal II in Ponthiyakulam at Annappanpettai Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dadooing of walls with colour glazed tiles of size 150x150x6 mm of best quality laid in cm 1:2 10mm thick & pointing with white cement using 0.4 kg/cm2
Paving the flooring with special type of Pre - polished concrete anti - skid step tiles of 20mm thick (20mm thick) in CM 1:3, 20mm thick
Plastering with cement mortar 1:5 mix to 12 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
White washing with single coats including cost & conveyance of all materials and labour charges etc.,
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Painting with two coats old iron of good enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Provision for name board
Part 25: Renovation of PUE School Boys Toilet in Thirukarukavur Panchayat
Dismantling the damaged cement plastering including cost & conveyance, labour charges etc..,
Dismantling the damaged flooring and wall tiles including cost & conveyance labour charges etc.,
Providing granolithic floor finish ISS metal to 25mm thick including cost and conveyance of all materilas to site and all labour charges for mixing, laying, curing etc., complete.
Floor finishing with ceramic tiles of size 20cmx20cm ncluding cost & conveyance, labour charges etc..,
Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:5 mix to 12 mm thick incluting all cost and conveyance of all materials to site and all labour charges etc complete for 10 sqm
White washing with single coats including cost & conveyance of all materials and labour charges etc.,
Distembering two coats with best approved colour with Priming Coat over the new plastered surface including cost and conveyance of all materials to site andall other labour charges etc complete.For INNER WALL and Ceiling
Exterior Emulsion paint with two coats of including cost & conveyance & labour charges etc., complete.
Repairs to steel doors for toilet and urinal area including welding charges etc., complete
Painting with two coats old iron of good enamel paint including cost & conveyance of all materials and all labour charges for etc, Complete.,.
Provision for name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RATHINAM TAMILSELVAN
Bidder Name
SANGANITHI CONSTRUCTIONS
RATHINAM TAMILSELVAN
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .