Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC 5 57 CALDWELL COLONY 1ST STREET TUTICORIN 628 008 | TUTICORIN | TAMIL NADU | 628008 | L1 | Accepted-AOC Tender Accepted | |
| 2 | L2₹1.6 L+₹7,580 (5.08%)Rejected-AOC 1 19 12 KATHAR MEERAN NAGAR THERMAL NAGAR TUTICORIN 628 006 | TUTICORIN | TAMIL NADU | 628006 | L2 | Rejected-AOC L2 Bidder |
Tender Value
₹1.8 L
EMD Value
₹1,800
Closing Date
16 Jun 2022, 2:00 pmClosed
SE/ES/TTPS
Superintending Engineer-Electrical Systems- Tuticorin Thermal Power Station-Tuticorin
EM III Annual overhauling maintenance works in Generator 24 KV isolated busducts 6.6 KV busducts Generator Transformers R Y B phases Unit Auxiliary Transformers A and B during Unit IV Annual overhaul for the year 2022 2023 or 2023 2024
2022_EB_234555_1
SE/ES /TTPS/89/2022-23
Open Tender
Electrical Works
Item Rate
15 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹1,800
Yes
17 Nov 2022
31 May 2022
17 Jun 2022
31 May 2022
16 Jun 2022
31 May 2022
Charges for carrying out disconnection and reconnection of copper flexible links at Generator phase terminal busing end
Charges for carrying out disconnection and reconnection of copper flexible links at Generator Neutral terminal busing end
Annual maintenance works in 24KV Phase and Neutral side busduct: Opening of all manholes in 24 kv busduct, Cleaning of phase and neutral side busduct, Cleaning and checking of 24 kv bus and support insulators from generator bottom to generator transformer and neutral grounding cubicle. Replacing the defective insulators if necessary, Tightness checking of all bus joints. Cleaning neutral grounding transformer & neutral grounding reactor and cubicles, checking of IR values.
Charges for carrying out annual maintenance works in Excitation Transformer Disconnection of flexible links at HV & LV side, cleaning the transformer, meggering and assisting for testing by MRT and restoration of links after completion of works
Charges for carrying out annual maintenance works in Lightning Arrester Voltage Transformer (LAVT) cubicle
Charges for maintenance works in HV Condenser Bushings of 3*84MVA single phaseGenerator Transformers and 216 KV LAS: Disconnection of HV jumper connections in Generator Transformers R, Y and B phases, support insulators, 216 kv lightning arrestors and neutral grounding CT, cleaning of HV condenser bushings, support insulators, neutral bushings, 216 kv LAS, connecting leads for MRT testing, restoring of all jumper connections and tightness checking
Charges for maintenance works in 230 KV strung bus of 3*84MVA single phase GeneratorTransformer R, Y and B phases: Transportation of ladder from switch yard II, Tightness checking at the joints of jumpers from Generator Transformers, Support insulator and LAS to strung bus, checkingthe conditions of aluminium clamps and replacing if needed.
Charges for maintenance works in 3*84MVA single phase GeneratorTransformer R,Y and B Phases: Opening of LV turret covers in Generator transformers R,Y and B phases, disconection of flexible links in 24 kv busduct to GT LV side, cleaning the transformer, meggering, toppingup of oil if needed and assisting for testing of bucholz relay, surge relay and PRV, restoration of LV side links after completion of works
Charges for maintenance works in 6.6 KV Bus duct : Opening of all manholes in 6.6 kv busduct, Cleaning and checking of 6.6 KV Bus and support insulators from UAT to switchgear panel, checking the condition of all supporting insulators, measuring IR values of the bus after tightness checking of all bus joints, Restoring of all the manhole doors after completion of works
Charges for maintenance works in Earth Resistors and Neutral Grounding Transformers of UAT A & B: Opening of top cover in the earth resistors, inspection and cleaning with air and brushes, Measuring the resistance value and tightness checking of the connections, Cleaning the neutral grounding transformer, topping up of oil if required, replacing the silicagel in the breather, Meggering the IR value
Charges for maintenance works in Unit Auxiliary Transformers: Opening of rubber bellows in all the phases from the busduct, disconnection of felxible links in HV and LV side, cleaning the transformer, topping up of oil if required, meggaring and assist to MRT testing, bucholz and PRV testing, releasing of OTI and WTI for recalibration and refixing, restoration of HV and LV links after completion of works.
Charges for cleaning of all Generator Transformer R, Y & B phases and its radiators, UATs and its radiators with soda karam and water after completion of overhauling works.
Opening of all earth pit in Transformer Yard, cleaning the earth electrode & pit, checking the joints and earthing rod if necessary, Closing the cover after completion of work.
KANDASAMY ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .