| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | ₹12.0 L | L1 | Accepted-AOC Less Quoted |
| 2 | L2₹12.6 LRejected-AOC | ₹12.6 L | L2 | Rejected-AOC Above Quoted |
| Sl No | Description | Qty | Unit | MRP Infratech Private Limited L1 | S.ANBU L2 |
|---|---|---|---|---|---|
| 1.00Name of Work: Maintenance of Road Thimmasamuthiram Thangal Road Km 0/0-0/680 in Kancheepuram Panchayat Union of Kancheepuram District for the Year 2025 -26 Under SCPAR / 2025-26 Estimate Amount . 12.20 Lakhs | |||||
| 2.00 | Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete | 950.4 | Sqm | 6 ₹5,702.4 | 7 ₹6,652.8 |
| 3.00 | Earth work exavation in all classes of soils such as Sandy Soil, etc. and depositing on berms with all leads and lifts and all other incidential charges. etc., complete for berms.Asper SS20A | 118.8 | Cum | 140 ₹16,632 | 145 ₹17,226 |
| 4.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | 0.82 | Cum | 4,615 ₹3,784.3 | 4,620 ₹3,788.4 |
| 5.00 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503. | 2,517 | Sqm | 33 ₹83,061 | 34 ₹85,578 |
| 6.00 | Providing and laying bituminoua concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, | 62.11 | Cum | 11,181 ₹6,94,451.91 | 12,000 ₹7,45,320 |
| 7.00 | Filling gravel for shoulders and berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete | 81.6 | Cum | 545 ₹44,472 | 549 ₹44,798.4 |
| 8.00 | Supplying and Erection centering charges including cost and conveyance and all labour charges etc, | 6 | Sqm | 548 ₹3,288 | 550 ₹3,300 |
| 9.00 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | 22.5 | Cum | 7,159 ₹1,61,077.5 | 7,165 ₹1,61,212.5 |
| 10.00 | Provision for Bitumenious Pad exposition joint. | 4.5 | Sqm | 224 ₹1,008 | 225 ₹1,012.5 |
Tender Value
₹12.2 L
EMD Value
₹12,200
Closing Date
1 Dec 2025, 3:00 pmClosed
The Block Development Officer BP Kancheepuram
The Block Development Office Kancheepuram Union
Renewal of Thimmasamuthiram Thangal Road Km 0/0-0/680 in Kancheepuram Panchayat Union of Kancheepuram District for the Year 2025 -26 Under RRM / 2025-26 Est Amt.12.20 Lakhs
2025_RDTN_626048_1
RC No.E-3690506/2025/A15 Dt.21.11.2025
Open Tender
Civil Works - Roads
90 days
Kancheepuram Union
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,200
13 May 2026
24 Nov 2025
1 Dec 2025
24 Nov 2025
1 Dec 2025
24 Nov 2025
Amount
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Earth work exavation in all classes of soils such as Sandy Soil, etc. and depositing on berms with all leads and lifts and all other incidential charges. etc., complete for berms.Asper SS20A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying bituminoua concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler,
Filling gravel for shoulders and berms including cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
Supplying and Erection centering charges including cost and conveyance and all labour charges etc,
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Provision for Bitumenious Pad exposition joint.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.ANBU (BID ID -1524345)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_748650.xls
BOQ • 0.28 MB
Schedule.pdf
Tender Documents • 1.16 MB
Download all tender documents and submit your bid