| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC 3701 3701 NEAR SAINI HOSPITAL UKLANA ROAD BHUNA 125111 | FATEHABAD | HARYANA | 125111 | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.5 L+₹4,233.73 (0.29%)Rejected-Finance HN 423 VPO GAJJUWALA 2025R20252 | L2 | Rejected-Finance L2 | |
| 3 | L3₹15.3 L+₹79,170.82 (5.46%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹15.8 L+₹1.3 L (9.15%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical SATI MATA MANDIR WARD NO 2 NAHAR COLONY CHEEKA SATI MATA MANDIR WARD NO 2 NAHAR COLONY CHEEKA 136034 | CHEEKA | KAITHAL | HARYANA | 136034 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹21.2 L
EMD Value
₹42,337
Closing Date
17 Mar 2026, 5:00 pmClosed
Narinder Pawar
Municipal Committee Bhuna
Development and Rejuvenation of Bagla Pond (Part-2) Bhuna
2026_HRY_506880_1
2026F1EDC0FD 7C4E 40D9 9D8A 23267A5FA2FD275ULB
Open Tender
Civil Works
Works
120 days
Bhuna
2 documents required · 2 mandatory
₹1,000
₹42,337
Yes
10 Apr 2026
7 Mar 2026
18 Mar 2026
7 Mar 2026
17 Mar 2026
7 Mar 2026
7 Mar 2026 - 9 Mar 2026
[17.22.1]Water Bound Macadam Gr I 1. Water Bound Macadam Grading I (without screenings for low volume roads (undesignated) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate]
[17.5.3]Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate]
[17.69.3]Interlocking Concrete Block Pavement 3. Providing and Laying 60 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 35 over the bed of 25 mm thick fine sand complete in all respect. [Through Rate]
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [1km]
[3.1.3]By Mechanical Transport including loading, unloading and stacking 3. Manure or sludge [1km]
[34.29.1]GI barbed wire fencing 1. G.I Barbed Wire Fencing 1.2 Metre High Providing and fixing 1.2 metres high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40 mm x 6 mm placed every 3 metres centre to centre founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 807 [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[4.31.1]Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. 1. All kinds of soil [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
[7.70]Extra for bailing / pumping out standing water of pond caused by springs, sub soil water, canal or river seepage and broken water mains or drains except rain water collected in the trenches or foundations before laying brick work. [Through Rate]
stage.html
html • 0.06 MB
techsummary_585632.pdf
BOQ Comparative Chart
xlsx
finsummary_585632.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_585632.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .