Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹39.1 CrAccepted-AOC | ₹39.1 Cr Quoted ₹39.2 Cr | 1 | Accepted-AOC lowest rates |
| 2 | 2₹48.1 CrRejected-AOC | ₹48.1 Cr | 2 | Rejected-AOC higher rates than the L 1 rates. |
| 3 | 3₹54.2 CrRejected-AOC | ₹54.2 Cr | 3 | Rejected-AOC higher rates than the L 1 rates. |
| 4 | 4₹54.3 CrRejected-AOC | ₹54.3 Cr | 4 | Rejected-AOC higher rates than the L 1 rates. |
| 5 | 5₹82.6 CrRejected-AOC 119 A 1 BAGHAJATIN REGENT ESTATE SOUTH 24 PARGANAS KOLKATA WEST BENGAL 700092 | KOLKATA | WEST BENGAL | 700092 | ₹82.6 Cr | 5 | Rejected-AOC higher rates than the L 1 rates. |
Tender Value
Refer Docs
EMD Value
₹25 L
Closing Date
9 Jun 2023, 3:00 pmClosed
XEN CHP
Rajiv Gandhi Thermal Power Plant, Khedar, Hisar.
Annual Running Contract for Operation and Maintenance of 2400 TPH Automated Coal Handling Plant at 2 x 600 MW RGTPP, HPGCL, Khedar, Hisar
2023_HBC_280640_1
02/RGTPP/CHP/F-347/2023-24
Open Tender
Power/Energy Projects/Products
1095 days
RGTPP Hisar
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Yes
₹25 L
Yes
6 Nov 2023
10 May 2023
12 Jun 2023
10 May 2023
9 Jun 2023
10 May 2023
Amount
Rates for Part A
Operation & Maintenance of Automated Coal Handling Plant involving Wagon Tippler, Apron Feeders, Dribble feeders, Conveying Systems, Transfer Chutes, Skirt Boards, Grizzly Feeders, Roller Screens, Coal Crushers, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors etc. The work also includes all types of maintenance such as Mechanical / Electrical / C&I (PLC) of all CHP equipments. Operation and Maintenance of Dust Extraction system, Dust Suppression System, Coal Sampler & Analyzer system, Ventilation system, Water sprinkling System, Pre wetting system, AC system, Sump Pumps, Compressors (De-watering Pump), Dewatering of tunnels and trenches including railway demurrage charges. (As per detailed scope of work attached as Annexure-VI).
Operation & Maintenance of Automated Coal Handling Plant involving Wagon Tippler, Apron Feeders, Dribble feeders, Conveying Systems, Transfer Chutes, Skirt Boards, Grizzly Feeders, Roller Screens, Coal Crushers, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors etc. The work also includes all types of maintenance such as Mechanical / Electrical / C&I (PLC) of all CHP equipments. Operation and Maintenance of Dust Extraction system, Dust Suppression System, Coal Sampler & Analyzer system, Ventilation system, Water sprinkling System, Pre wetting system, AC system, Sump Pumps, Compressors (De-watering Pump), Dewatering of tunnels and trenches including railway demurrage charges. (As per detailed scope of work attached as Annexure-VI).
Operation & Maintenance of Automated Coal Handling Plant involving Wagon Tippler, Apron Feeders, Dribble feeders, Conveying Systems, Transfer Chutes, Skirt Boards, Grizzly Feeders, Roller Screens, Coal Crushers, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors etc. The work also includes all types of maintenance such as Mechanical / Electrical / C&I (PLC) of all CHP equipments. Operation and Maintenance of Dust Extraction system, Dust Suppression System, Coal Sampler & Analyzer system, Ventilation system, Water sprinkling System, Pre wetting system, AC system, Sump Pumps, Compressors (De-watering Pump), Dewatering of tunnels and trenches including railway demurrage charges. (As per detailed scope of work attached as Annexure-VI).
Operation of equipment for feeding coal to the bunkers of Unit-I
Operation of equipment for feeding coal to the bunkers of Unit-I
Operation of equipment for feeding coal to the bunkers of Unit-I
Operation of equipment for feeding coal to the bunkers of Unit-II
Operation of equipment for feeding coal to the bunkers of Unit-II
Operation of equipment for feeding coal to the bunkers of Unit-II
Cleaning and House Keeping of entire Coal Handling Plant including Control Rooms, Electrical Rooms, Buildings, open cable trenches, Wagon Tipplers, Apron Feeders, Dribble feeders, Transfer Chutes, Skirt Boards, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors and Coal Bunkers etc. Deployment of Stone Pickers for picking of stones, and other foreign material from running conveyors, removal of wild grass etc including Horticulture & Beautification activities of complete CHP, Cleaning of Road, Trenches, Drains in CHP area etc. (As per detailed scope of work attached as Annexure-VI).
Cleaning and House Keeping of entire Coal Handling Plant including Control Rooms, Electrical Rooms, Buildings, open cable trenches, Wagon Tipplers, Apron Feeders, Dribble feeders, Transfer Chutes, Skirt Boards, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors and Coal Bunkers etc. Deployment of Stone Pickers for picking of stones, and other foreign material from running conveyors, removal of wild grass etc including Horticulture & Beautification activities of complete CHP, Cleaning of Road, Trenches, Drains in CHP area etc. (As per detailed scope of work attached as Annexure-VI).
Cleaning and House Keeping of entire Coal Handling Plant including Control Rooms, Electrical Rooms, Buildings, open cable trenches, Wagon Tipplers, Apron Feeders, Dribble feeders, Transfer Chutes, Skirt Boards, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors and Coal Bunkers etc. Deployment of Stone Pickers for picking of stones, and other foreign material from running conveyors, removal of wild grass etc including Horticulture & Beautification activities of complete CHP, Cleaning of Road, Trenches, Drains in CHP area etc. (As per detailed scope of work attached as Annexure-VI).
Operation & Maintenance of Heavy Machinery such as Diesel Locomotives, Bulldozers, Loaders, Cranes, Dumpers and Excavators etc. (As per detailed scope of work attached as Annexure-IX).
Operation & Maintenance of Heavy Machinery such as Diesel Locomotives, Bulldozers, Loaders, Cranes, Dumpers and Excavators etc. (As per detailed scope of work attached as Annexure-IX).
Operation & Maintenance of Heavy Machinery such as Diesel Locomotives, Bulldozers, Loaders, Cranes, Dumpers and Excavators etc. (As per detailed scope of work attached as Annexure-IX).
Upkeep/Maintenance of Marshalling yard (As per detailed scope of work attached as Annexure-X).
Upkeep/Maintenance of Marshalling yard (As per detailed scope of work attached as Annexure-X).
Upkeep/Maintenance of Marshalling yard (As per detailed scope of work attached as Annexure-X).
Charges per MT for Collection and preparation of coal samples from Indian coal rakes at RGTPP. (As per detailed scope of work attached as Annexure-XI). However, firm will be paid monthly charges on the basis of actual quantity of Indian coal received in that month.
Charges per MT for Collection and preparation of coal samples from Indian coal rakes at RGTPP. (As per detailed scope of work attached as Annexure-XI). However, firm will be paid monthly charges on the basis of actual quantity of Indian coal received in that month.
Charges per MT for Collection and preparation of coal samples from Indian coal rakes at RGTPP. (As per detailed scope of work attached as Annexure-XI). However, firm will be paid monthly charges on the basis of actual quantity of Indian coal received in that month.
Charges per rake for Videography of complete sampling and analysis of imported coal (As per detailed scope of work attached as Annexure-XII). However, firm will be paid monthly charges on the basis of actual number of imported rakes received in that month.
Charges per rake for Videography of complete sampling and analysis of imported coal (As per detailed scope of work attached as Annexure-XII). However, firm will be paid monthly charges on the basis of actual number of imported rakes received in that month.
Charges per rake for Videography of complete sampling and analysis of imported coal (As per detailed scope of work attached as Annexure-XII). However, firm will be paid monthly charges on the basis of actual number of imported rakes received in that month.
Description of Work / Item(s)
Amount
Rates for Part B
Diesel charges per coal rake . It will include taxes, handling charges and storage charges etc. (Firm has to enter the rate for diesel charges per rake and value shown in total amount tab will be of for full year with estimated 1215 rakes per year (No GST will be paid extra). However, firm will be paid monthly charges on the basis of actual nmber of rakes received in that month.
Diesel charges per coal rake . It will include taxes, handling charges and storage charges etc. (Firm has to enter the rate for diesel charges per rake and value shown in total amount tab will be of for full year with estimated 1215 rakes per year (No GST will be paid extra). However, firm will be paid monthly charges on the basis of actual nmber of rakes received in that month.
Diesel charges per coal rake . It will include taxes, handling charges and storage charges etc. (Firm has to enter the rate for diesel charges per rake and value shown in total amount tab will be of for full year with estimated 1215 rakes per year (No GST will be paid extra). However, firm will be paid monthly charges on the basis of actual nmber of rakes received in that month.
K K POWER CONSTRUCTION
Veenus Engineering
STAR OANDM GROUP
Lokenath Construction Private Limited
PHOENIX SOLUTIONS
STAR OANDM GROUP
K K POWER CONSTRUCTION
Lokenath Construction Private Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid