| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹9.9 CrAccepted-AOC | ₹9.9 Cr Quoted ₹9.1 Cr | l1 | Accepted-AOC aoc |
| 2 | l2₹9.4 Cr+₹21.5 L (2.36%)Rejected-Finance | ₹9.4 Cr+₹21.5 L (2.36%) | l2 | Rejected-Finance above |
| 3 | l3₹9.4 Cr+₹27.1 L (2.97%)Rejected-Finance | ₹9.4 Cr+₹27.1 L (2.97%) | l3 | Rejected-Finance above |
| 4 | Not Admitted-Fee/PreQual/Technical 0 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹12.9 Cr
EMD Value
₹25.8 L
Closing Date
9 Jan 2025, 12:00 pmClosed
SE, Ayo/Ambd Circle, PWD, Ayodhya
SE, Ayo/Ambd Circle, PWD, Ayodhya
Widening and Strengthening of Khajurahat Milkipur Amaniganj Rudauli Raujagaon MDR 184E
2024_CEUFZ_987462_2
8286/54(I)Com(CD-4)-Ayo/Ambd Circle Dt 06.12.2024
Open Tender
Civil Works
Item Rate
360 days
SE, Ayo/Ambd Circle, PWD
Widening and Strengthening of Khajurahat Milkipur Amaniganj Rudauli Raujagaon MDR 184E
2 documents required · 2 mandatory
₹2,714
₹25.8 L
Yes
SE, Ayo/Ambd Circle, PWD, Ayodhya
11 Jun 2025
30 Dec 2024
9 Jan 2025
30 Dec 2024
9 Jan 2025
30 Dec 2024
31 Dec 2024
Amount
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(1% OPC Cement + 3.5% Emulsion)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm using mechanical means.below BC
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00% as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25% as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50% as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75% as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00% as per circular No-3689 C-OPRMC/Mool/23-24 Dt 17.02.2024
M/s Alok Infra Projects (BID ID -4833495)
M/S LUCKY TRADERS (BID ID -4832757)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .