| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | -0.81% | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹1.5 L (0.60%)Admitted-Finance 00 HAIDARPUR JAMALPUR ROAD SADAR JAUNPUR UTTAR PRADESH 222001 | JAUNPUR | UTTAR PRADESH | 222001 | -0.21% | ₹2.5 Cr+₹1.5 L (0.60%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 Cr+₹1.8 L (0.75%)Admitted-Finance 313 315 SOMDUTT CHAMBER 11 9 BIKAJI CAMA PLACE NEW DELHI 110066 | NEW DELHI | DELHI | 110066 | -0.07% | ₹2.5 Cr+₹1.8 L (0.75%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Reject |
Tender Value
₹2.5 Cr
EMD Value
₹4.9 L
Closing Date
18 May 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
MVDA, MATHURA
WORK NO. 11 RADHAKUND ROAD KE SAUNDRIKARAN KA KARYA
2026_UPMVD_1143109_21
06/MVDA/2026-27 (2B)
Open Tender
Civil Works
Lump-sum
360 days
MATHURA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Secretary
₹4.9 L
15 Jun 2026
29 Apr 2026
19 May 2026
29 Apr 2026
18 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.SI No- 12.1 | 68 | cum | 81 | ₹5,508 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 2023 (Civil), Item No. 4.1.8 | 39 | cum | 4,960 | ₹1,93,440 |
| 3 | Supply and fixing of Coloured cement concrete saucer drain size 325X100X1000 MM grade M-25 including supply of all material/labour/ T&P etc.required for proper completion of work as directed by engineer - in -charge. complete in all respect. Pre Sanction Rate | 1,100 | Rmt | 650 | ₹7,15,000 |
| 4 | Providing & Fixing PVC pipe conforming to IS make working pressure 6kg/sqcm including testing labour T&P and all complete fittings 110 mm diameter
PWD SOR 2023-24, Item No. 30/ch.23 | 720 | Rmt | 450 | ₹3,24,000 |
| 5 | Providing and fixing to the inlet mouth of rain water pipe cast iron grating 15 cm diameter and weighing not less than 440 grams. DSR 2023 (Civil), Item No. 12.44 | 120 | Nos | 39 | ₹4,680 |
| 6 | Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1 m x1 m x 400 micron, finished with 12 mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat cement, rounding the edges and making and finishing the outlet complete. DSR 2023 (Civil), Item No. 12.22 | 120 | Nos | 217 | ₹26,040 |
| 7 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.SI No- 12.1 PWD SOR-2025-26, Ch.6, Item No.1 | 45 | Cum | 81 | ₹3,645 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR-2023, Item No. 4.1.8 | 23 | Cum | 4,960 | ₹1,14,080 |
| 9 | Reinforced Cement Concrete (M-25) in Sub-structure complete as per Drawing and Technical Specifications Clause 1500,1600 & 1700
including cost of shuttering work PWD SOR-2025-26 Ch.6, Item No. 14 | 34 | Cum | 7,460 | ₹2,53,640 |
| 10 | Reinforced Cement Concrete (M-25) in Super-structure complete as per Drawing and Technical Specifications Clause 1500,1600 & 1700
including cost of shuttering work PWD SOR-2025-26 Ch.6, Item No. 17 | 95 | Cum | 8,090 | ₹7,68,550 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.81 MB
TD06.pdf
Tender Documents • 0.78 MB
BOQ_2136103.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .