Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.3 LAdmitted-Fee/PreQual/Technical/Finance | -6.33% | ₹42.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹44.4 L+₹2.1 L (4.86%)Admitted-Fee/PreQual/Technical/Finance | -1.78% | ₹44.4 L+₹2.1 L (4.86%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹45.2 L+₹2.9 L (6.76%)Admitted-Fee/PreQual/Technical/Finance 12 VILLAGE SOMBRONA P O NOWGAM KUTHAR VILLAGE SOMBRONA ANANTHNAG JAMMU KASHMIR 192201 UDYAM JK 01 0016545 | ANANTNAG | JAMMU AND KASHMIR | 192201 | +0.00% | ₹45.2 L+₹2.9 L (6.76%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹53.3 L
EMD Value
₹1.1 L
Closing Date
17 Aug 2026, 6:00 pmClosed
Er.Mohd Ashraf Khan
Nadoora Dooru
Construction of Maharaja Road at Arampora (Under District Sector)
2026_PWDJK_319130_1
NiT NO 25DOORU/1693-97 Dt 03-08-2026
Open Tender
Civil Works
Percentage
730 days
dooru
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
Account bearing No. 0470010200000099
₹1.1 L
Yes
22 Aug 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
17 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Prerparation Of Sub Grade | - | - | - | - |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 109 | Cum | 164.2 | ₹17,897.8 |
| 3 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | 2,007.5 | Sqm | 134.14 | ₹2,69,286.05 |
| 4 | Engagement of jcb for clearance of site including removal of accumilated malba, debris from the berms and othr unhygenic material all comlete as per he directions of incharge engineer at site ( to be paid as per actual subject to the maximum of 16 hours) | 16 | Hours | 1,016.95 | ₹16,271.2 |
| 5 | Providing and laying of RBM/ Nallah Muck | - | - | - | - |
| 6 | Supply, filling of RBM/ nallah muck/GSB including ramming, watering and consoldating with 8-10 Tonne road roller with carriage of material upto site of work all complete as per the directions | 675.4 | Cum | 677.97 | ₹4,57,900.94 |
| 7 | P/L of WBM GII | - | - | - | - |
| 8 | Providing and Laying of WBM base course with specified stone aggregate of size 63-45mm , stone screening 13.2 mm and binding material including , sorting, spreading to template,m watering and consolidation with P.R.R of (8-10 Tonne) capacity all complete including carriage of material from approved source upto site of workas per the directions of incharge engineer at site (compacted quantity to be measured) | 136.9 | Cum | 2,542.37 | ₹3,48,050.45 |
| 9 | RCC Spun Pipes | - | - | - | - |
| 10 | Providing & Laying of RCC pipes in trenches in proper position including excavation of trenches refilling of excavated materials got from excavation. Providing of cushion over pipes incld all carriages of pipes, loading ,unloading and stacking etc complete 18'' mm dia | 32 | Rft | 911.76 | ₹29,176.32 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_1055710.xls
BOQ • 0.30 MB
CorDate25.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .