Tender Value
₹44.6 L
EMD Value
₹89,153
Closing Date
3 Aug 2026, 4:00 pm
Executive Engineer(CP)
NDMC Zonal Office Tilak Lane, Tilak Marg New Delhi-110001
Name of work SR of Roads in NDMC area. Sub Head Upgradation of footpath at Bangla Sahib Lane under Hanuman Road Service Centre.
2026_NDMC_295769_1
23/EE(CP)2026-27
Open Tender
Civil Works
Percentage
90 days
CP Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹89,153
23 Jul 2026
23 Jul 2026
3 Aug 2026
23 Jul 2026
3 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 25 mm to 40 mm | 1,460.5 | Square Metre | 114.73 | ₹1,67,563.17 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) | 13 | Cubic Metre | 1,521.96 | ₹19,785.48 |
| 3 | Earth work in surface excavation not exceeding 15 cm depth but exceeding 1.5 m in width as well as 10 sq m on plan including disposal of excavated earth lead up to 50 m lift up to 1.5 m. Disposal soil to be leaved and neatly dressed . All kind of soil | 51 | Square Metre | 65.72 | ₹3,351.72 |
| 4 | Dismantling stone slab, CC/RCC slab/ DQ Stone flooring laid in cement mortar including removal of mortar, stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 75 | Square Metre | 161.63 | ₹12,122.25 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 20 mm nominal size derived from natural sources). | 71 | Cubic Metre | 5,688.35 | ₹4,03,872.85 |
| 6 | Providing & laying in footpath and pavement etc. factory made precast cement concrete slab of size 400mmx400mmx60mm of mix M-35 grade manufactured through fully automatic hydraulically presssed machine and finished smooth as per shape, size and pattern over a base of 12mm thick average cement mortar 1:5(1cement:5coarse sand) and having joints not exceeding 10mm thick filled with cement mortar 1:5(1cement:5coarse sand) and neatly finished etc complete as per the direction and instructions of Engineer in charge. (Nothing extra shall be paid to be contractor for laying slabs in approved pattern in using precast slabs of required shapes at end of footpath & Precast C.C. slab shall be approved by Engineer-in-charge). | 1,206 | Square Metre | 645.6 | ₹7,78,593.6 |
| 7 | Relaying D.Q stone flooring of size 100x100mm and 70mm to 80mm thick laid over 20mm (avg.) thick base of cement mortar 1:4(1cement :4 coarse sand) of approved design/shape and jointed and pointed with cement mortar 1:4 (1cement :4 coarse sand) etc. complete s per direction of Engineer-in-charge. | 45 | Square Metre | 728.56 | ₹32,785.2 |
| 8 | Providing and fixing D.Q stone flooring of size 100x100mm and 70mm to 80mm thick laid over 20mm (avg.) thick base of cement mortar 1:4(1cement :4 coarse sand) of approved design/shape and jointed and pointed with cement mortar 1:4 (1cement :4 coarse sand) etc. complete s per direction of Engineer-in-charge. | 30 | Square Metre | 1,558.24 | ₹46,747.2 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 7 | Cubic Metre | 7,974.71 | ₹55,822.97 |
| 10 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature jointed with cement mortar 1;3 ( 1 cement ; 3 coarse sand ) including making joints with or wihtout grooves ( thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge ( length of finished kerb edging shall be measured for payment). (Precast C.C Kerb stone shall be approved by Engineer-in-charge). | 42.5 | Cubic Metre | 10,241.15 | ₹4,35,248.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
nit.pdf
Tender Documents • 1.55 MB
BOQ_393545.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].