BLOCK DEVELOPMENT OFFICER(V.PT)
PANCHAYAT UNION OFFICE, AVUDAYARKOVIL
Construction Of 10000 Lrts OHT at Arasanagaripattinam in Ponnamangalam Panchayat
2024_RDTN_471009_1
NABARD RIDF XXX 2024-25 PONNAMANGALAM -ARASANAGARIPATTINAM
Open Tender
Civil Works
Item Rate
180 days
AVUDAYARKOVIL
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,100
9 Aug 2024
8 Aug 2024
9 Aug 2024
8 Aug 2024
9 Aug 2024
8 Aug 2024
Amount
Construction Of 10000 Lrts OHT @ Arasanagaripattinam in Ponnamangalam Panchayat
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
i) a.For first depth of 2 M
ii) Second depth of 1 M
Filling with M.sand including cost and conveyance of all materials to site and all labour charges etc complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to work site and all labour charges for mixing,laying and curing etc complete
R.C.C. 1:11/2:3 mix using 20mm ISS HBG metal including cost and conveyance to work site and all labour charges for mixing,laying and curing etc complete
A) Below GL
B) 0m to 1.50m Below GL
C) Above GL (0 to 4.50m)
D) Above GL (4.50 to 7.32m)
E) Above GL (7.32 to 10.98m)
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
A) PLAIN SURFACE
a) Below GL ( 0 to 3.30m )
b) Above GL ( 0 to 3.30m )
c) Above GL ( 5.30 to 6.30m )
d) Above GL ( 6.30 to 7.30m )
B) CURVED SURFACE
a) Above GL ( 5.30 to 6.30m )
b) Above GL ( 6.30 to 7.30m )
C) SQUARE SURFACE
a) Below GL ( 0 to 3.30m )
b) Above GL ( 0 to 3.30m)
c) Above GL ( 3.30 to 4.30m)
d) Above GL (4.30 to 5.30m)
e) Above GL (5.30 to 6.30m)
f) Above GL (6.30 to 7.30m)
Cost and supply of steel with fabrication including cost of steel and binding wire complete with standard specification etc.,complete
Fabrication, supply, delivery and fixing of outside MS Ladder wide 45cm made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm centre to centre welded, joned etc providing with suitable side supports, clamps, and locking arrangements provided access to roof top of 10,000 lit OHT of suitable inclined length, including bottom anchorage and transportion.
Providing and fixing of RCC inner acess ladder in RCC 1:1.5:3 mix using 20mm metal including cost and conveyance of all material to work site and all labour charges etc. completed and Vertical post of 10cm x 15 cm and step slab of 25mm x 25mm etc. completed
Ventilator made up of 45 stem with 65mm GI pipe and arms made out of 65mm GI Tee ,elbow with 20cm and 65mm pipe nipple and firmly welded
Providing Manhole cover of size 0.60x0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixied along edes
Provision for pipe connection arrangement for inlet, outlet, scour and over flow etc. including cost of pipes specials , value,labour charges for lifting, aligning, cutting, therading fixing and painting of GI Pipes with two coats of approved quality enamel paint etc. completed
65mm dia GI pipes for inlet conection
65mm dia GI pipes for overflow & rainwater harvesting pipe
50mm dia GI pipes or scour pipe
65mm dia GI pipe delivery pipe
65mm dia PVC Thraded coupler
65mm dia GI Tee
65mm dia GI Bend
65mm dia GI Coupler
65mm dia GI Union
65mm dia GI Elbow
50mm dia GI Union
65x50mm dia GI Reducer
75x63mm dia PVC Reducer
65mm dia GM Gate valve
50mm dia GM Gate valve
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Refilling the basement with excavated earth other than Sand complying the Standard specification
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches for laying of pipes etc
Supply and delivery of following PVC Pipes
Conveyance of the following rigd PVC pipes, lowering to trenches and laying to proper grade and alignment etc Complete as per TWAD Schedule of rate 11d ii
Refilling with excavated earth including all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VM. KALIDHAS (BID ID -1105474)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .