| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | L1 | Accepted-AOC Lowest rate | |
| 2 | L2₹6.8 L+₹14,048.08 (2.11%)Rejected-Finance | L2 | Rejected-Finance Highest rate |
| Sl No | Description | Qty | Unit | Parthasarathy L1 | C Selvakumar L2 |
|---|---|---|---|---|---|
| 1.00Construction of an Multipurpose hall | |||||
| 2.00 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil ) | 7.91 | Cum | 263.6 ₹2,085.08 Lowest | 280 ₹2,214.8 |
| 3.00 | Collection and supply of sand and filling in to the basment including cost and conveyance to the site and all labour charges for filling as per std specification | 2 | Cum | 1,666.1 ₹3,332.2 Lowest | 1,670 ₹3,340 |
| 4.00 | CEMENT CONCRETE 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 9.52 | Cum | 5,346.8 ₹50,901.54 Lowest | 5,350 ₹50,932 |
| 5.00 | REINFORCED CEMENT CONCRETE 1:1.5:3 mix using 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps etc., complete complying with standard specification and as directed by the departmental officers. Column footing - Foundation basement | 10.2 | Cum | 9,119.6 ₹93,019.92 Lowest | 9,125 ₹93,075 |
| 6.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications. | 15.29 | Cum | 6,142.3 ₹93,915.77 Lowest | 6,147 ₹93,987.63 |
| 7.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing | 1,500 | Kg | 91.7 ₹1,37,550 Lowest | 95 ₹1,42,500 |
| 8.00Supplying and erecting centering shuttering including necessary supports for etc., complete. | |||||
| 8.01 | columns | 19.15 | Sqm | 547.4 ₹10,482.71 Lowest | 600 ₹11,490 |
| 8.02 | Centering area for RCC Sunshade,Lintel,Beamsnand Roof Slab | 54.75 | Sqm | 1,095 ₹59,951.25 Lowest | 1,100 ₹60,225 |
Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
15 Oct 2025, 5:00 pmClosed
BDO (B.Pt), Radhapuram
Block Development Office, Radhapuram
Constuction of Multipurpose Hall at Mittatharkulam in KottaikarunkulamV.Pt
2025_RDTN_610078_1
General Fund - A2/2690/2025
Open Tender
Civil Works
Item Rate
Block Development Office, Radhapuram
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹8,500
16 Oct 2025
29 Sept 2025
15 Oct 2025
29 Sept 2025
15 Oct 2025
29 Sept 2025
Amount
Construction of an Multipurpose hall
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil )
Collection and supply of sand and filling in to the basment including cost and conveyance to the site and all labour charges for filling as per std specification
CEMENT CONCRETE 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
REINFORCED CEMENT CONCRETE 1:1.5:3 mix using 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps etc., complete complying with standard specification and as directed by the departmental officers. Column footing - Foundation basement
Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing
Supplying and erecting centering shuttering including necessary supports for etc., complete.
columns
Centering area for RCC Sunshade,Lintel,Beamsnand Roof Slab
Paving the floor with best quality stain free Nano Polish Vertified Tiles of size 600x600x8mm of approved colour,shade and quality laid in cement mortar 1:3 20mm thick in all floor and top pointed with the white cement mixed same colour pigment etc .complete
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying and applying of two coats of putty of 3mm thick over exposed RCC surface of celing including finishing the joints smooty with grinding machine and the surface shall be throughly cleaned out of dust and scrubbing.
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc,.
Supplying of steel doors, windows, ventilators etc., with best approved best quality etc., complete complying with standard specifications and as directed by the departmental officers.
Doors D1(1.1x2.10)m
Window W(1.20x1.30)m
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Labour Charges for Fixing the Doors inculding all Charges etc..
Labour Charges for Fixing the Steel Window inculding all Charges etc..
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board including all cost and conveyance and all labour charges etc .comp.
CEMENT CONCRETE 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
C Selvakumar (BID ID -1487883)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_728971.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .