| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹2.5 Craccepted-aoc | ₹2.5 Cr | accepted-aoc |
Tender Value
₹2.3 Cr
EMD Value
₹3.5 L
Closing Date
15 Jan 2026, 9:30 pmClosed
Rural Development and Panchayat Raj Department
EXECUTIVE ENGINEER PRE DIVISION KOPPAL
Construction of Rajoor-Tondihal road in Kukanoor Taluk of Koppal District.
RDPR/2025-26/RD/WORK_INDENT20899
RDPR/2025-26/RD/WORK_INDENT20899
Open
Roads
Two Tender Document System(Two Cover)
RDPR Division Office Koppal
7 documents required · 7 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
To qualify for award of this contract, Each tenderer in his/her name should have in the last five year i.e, 2020- 2021 to 2024-25 Satisfactorily completed, as a prime contractor, at least one Single similar Nature of work (ROAD WORK) of value not less than Rs.117.45 Lakhs
The Tenderer shall obtain the work done certificate in the prescribed form from the competent authority not below the rank of Executive Engineer (District Level Officer) and scan the Original Certificate and attach the scanned file to the Bid.The Original Certificate / Certificates shall be produced whenever required
To qualify for award of this contract, each Tenderer in its name should have in the last five years Executed in any one year, the following minimum quantities of work in last five years.1.Earth Work/Embankment/Subgrade 9403.00 Cum 2) GSB 6083.00 Cum 3) WMM/WBM 117.00 Cum 4)PCC/RCC/CC PAVEMENT 342.00 Cum 6)TMT 11.82 Tonne
PWD REGISTRATION COPY
Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as: Assessed available tender capacity ( A N 1.5 - B
The bidder must submit last 5 years Profit and loss account obtained from Chartered Accountant (CA) Only
Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.469.80 Lakhs during the last five financial years (2020-21 to 2024-25)
Liquid assets and /or availability of credit facilities of no less than Rs.78.30 Lakhs(Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc) as per the format issued by theGovernment CircularDated:22.08.2022
₹5,000
₹3.5 L
15 Jan 2026
26 Dec 2025
16 Jan 2026
2 Jan 2026
2 Jan 2026
Construction of Rajoor-Tondihal road in Kukanoor Taluk of Koppal District.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Granular Sub-base - Grading III - Construction of Granular Sub-Base by Mix in Place Method by providing well graded Gravel, spreading in uniform layers with motor grader on prepared...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - Ordinary kilometer ston...
Direction and Place Identification Signs upto 0.9 m2 Size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 made of high intensity...
Providing and fixing board displaying information, such as Name of work, Tender cost, Name of Contractor, Work completion and liability period etc, having rectangular shape of 1.2...
Construction of 1000mm Two vent pipe culverts
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Painting on concrete surface - Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and apply...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Appendix I - Additionalities for Formwork, Centering & Scaffolding Culverts 8%
Construction of 1000mm one vent pipe culverts
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Painting on concrete surface - Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and apply...
Appendix I - Additionalities for Formwork, Centering & Scaffolding Culverts 8%
Construction of 15m Low Level Causeway at Ch.0.640km
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-base - Grading III - Construction of Granular Sub-Base by Mix in Place Method by providing well graded Gravel, spreading in uniform layers with motor grader on prepared...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
OTHER ITEMS - (CC Pavement, PMGSY Boards & Innovative Technology) - Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base,...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Appendix I - Additionalities for Formwork, Centering & Scaffolding Culverts 8%
Construction of 10m Low Level Causeway at Ch.1.580 km
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-base - Grading III - Construction of Granular Sub-Base by Mix in Place Method by providing well graded Gravel, spreading in uniform layers with motor grader on prepared...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
OTHER ITEMS - (CC Pavement, PMGSY Boards & Innovative Technology) - Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base,...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Appendix I - Additionalities for Formwork, Centering & Scaffolding Culverts 8%
Construction of 120m Low Level Causeway from Ch.1.730 km to Ch1.850km
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-base - Grading III - Construction of Granular Sub-Base by Mix in Place Method by providing well graded Gravel, spreading in uniform layers with motor grader on prepared...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
OTHER ITEMS - (CC Pavement, PMGSY Boards & Innovative Technology) - Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base,...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Appendix I - Additionalities for Formwork, Centering & Scaffolding Culverts 8%
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
20899 KW DOCUMENTS.docx
Tender Document • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .