| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAdmitted-Finance | ₹5.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.5 Cr+₹1.1 Cr (20.5%)Admitted-Finance 1104 QUANTUM TOWER RAM BAUG LANE MALAD WEST MUMBAI MAHARASHTRA 400064 UDYAM MH 18 0008080 | MUMBAI SUBURBAN | MAHARASHTRA | 400064 | ₹6.5 Cr+₹1.1 Cr (20.5%) | L2 | Admitted-Finance |
| 3 | L3₹6.8 Cr+₹1.4 Cr (25.6%)Admitted-Finance 00 DUDHEBHAVI KAVTHEMAHANKAL SANGLI SANGLI MAHARASHTRA 416403 | SANGLI | MAHARASHTRA | 416403 | ₹6.8 Cr+₹1.4 Cr (25.6%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Mahendra Realtors & Infrastructure Limited L2 | CEMBOND CONSTRUCTIONS PRIVATE LIMITED L1 | Shivkrupa Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge
(a) From 0.00 to 1.50 m depth from Average Ground Level | 50 | CuM | 350 ₹17,500 | 776 ₹38,800 | 250 ₹12,500 Lowest |
| 2.00 | Supplying and injecting with approved quality chemical emulsion at the rates and concentrations as per IS 6313-2001 Part II for post Anti-termite treatment to existing buildings as per manufacturers specifications and as directed by the Engineer-in-Charge. Work to be executed by approved agency and specified guarantee for 7 (Seven) years shall be furnished by the tenderer. Payment will be cleared only after submission of guarantee. | 1,500 | SqM | 75 ₹1,12,500 Lowest | 213.4 ₹3,20,100 | 140 ₹2,10,000 |
| 3.00 | Providing and laying in position cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels | 10 | CuM | 6,500 ₹65,000 Lowest | 6,830.99 ₹68,309.9 | 7,000 ₹70,000 |
| 4.00 | Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications up to Plinth Level. | 10 | CuM | 9,500 ₹95,000 | 11,640 ₹1,16,400 | 8,000 ₹80,000 Lowest |
| 5.00 | Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications in super structure up to 20.00 metre height.
Note for items of item no. 3, 4 & 5- i)In view of limit on water-cement ratio for durability requirements, concrete admixtures (Naphthalene / Melamine based superplasticizers) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for these items shall be inclusive of the cost of admixtures, trial mixes, testing (at site & at approved labs), etc. complete.
ii) All projections, fins etc. in the concrete surface formed at the joints in the formwork should be ground & flush and finished at no extra cost.
iii) Minimum cement content shall be as per latest revised relevant IS code. | 120 | CuM | 14,500 ₹17,40,000 | 10,185 ₹12,22,200 Lowest | 10,500 ₹12,60,000 |
| 6.00 | Extra for RCC Using Ready Mix Concrete from outside project area including transporting and pumping from approved batching plants . | 130 | CuM | 600 ₹78,000 Lowest | 970 ₹1,26,100 | 1,200 ₹1,56,000 |
| 7.00 | Providing Reinforcement Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules, cutting, bending, transporting, fixing, tieing in position with PVC coated with 1.6 mm dia soft drawn annealed G.I binding wire, all labour charges, cost of cover blocks in specified grade of concrete etc. complete including cost of binding wire, complete as per specifications and drawings. - Note: Using TMT bars of specified grades for all dia bars. TMT bars to be supplied by the contractor confirming to IS:1786. | 12 | MT | 92,000 ₹11,04,000 Lowest | 92,150 ₹11,05,800 | 1,05,000 ₹12,60,000 |
| 8.00 | Providing Structural steel work in M.S Plain Plates and chequrred Plates for Embedded Parts, Trench Covers, Connection plates etc.including cutting, hoisting, fixing in position and applying a priming coat of approved zinc chromate steel primer etc.including cost of structural steel Plates, welding all labour charges etc. complete as per drawings and specifications.
Using materials of approved equivalent quality/ product meeting technical parameters. All test reports to be provided along with the supply of the materials
Note:
1) Structural steel required for the work shall not be supplied by the Department and the contractor has to procure the same.
2) Welding weights, connections, bolts and nuts shall not be measured for payment, but the cost of which shall be deemed to have been included in the rate.
3) All holes will be made by drilling only. Gas cutting of holes will not be permitted. | 0.5 | MT | 1,30,000 ₹65,000 | 1,30,950 ₹65,475 | 1,15,000 ₹57,500 Lowest |
| 9.00 | Providing Structural steel work using angles, channels, joists and other sections, welded and / or bolted in built up sections for trusses , structural steel floors, frame works, monorails and other structures including supplying, cutting, welding, fabricating, hoisting, fixing in position, applying a priming coat of approved steel primer etc. complete all as per specifications, drawings and as directed by the Engineer in charge.
Up to and including 300 mm Joists, 350 mm channels, and below sections Using materials of approved equivalent quality/ product meeting technical parameters, confirming to IS 2062. All test reports to be provided along with the supply of the materials.
Note: 1) Structural steel required for the work shall not be supplied by the Department and the contractor has to procure the same.
2) Welding weights, connections, bolts and nuts shall not be measured for payment, but the cost of which shall be deemed to have been included in the rate.
3) All holes will be made by drilling only. Gas cutting of holes will not be permitted. | 3 | MT | 1,30,000 ₹3,90,000 | 1,30,950 ₹3,92,850 | 1,15,000 ₹3,45,000 Lowest |
| 10.00 | Providing, centering, shuttering Form work using PVC film faced plywood to get a neat form finish surface for all types of structures including necessary strutting, proping, staging, supports etc and deshuttering the same after the specified time all as per drawings, specifications and as directed by the Engineer-in-charge at all levels
(a)For Sub Structure | 50 | SqM | 550 ₹27,500 | 1,358 ₹67,900 | 400 ₹20,000 Lowest |
Tender Value
₹7.2 Cr
EMD Value
₹17.0 L
Closing Date
11 Feb 2026, 3:00 pmClosed
Chief Engineer, CED
CED, BARC, Trombay, Mumbai- 400085
Structural repair, Painting, Waterproofing and miscellaneous works at Old Training School building and other buildings at South site BARC, Trombay, Mumbai
2026_BARC_892176_1
BARC/CED/ET/75/2025-2026 Dated 31/12/2025
Open Tender
Civil Works
Item Rate
455 days
BARC, Trombay, Mumbai.
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹17.0 L
CED, BARC, Trombay, Mumbai- 400085
25 Aug 2026
1 Jan 2026
16 Feb 2026
1 Jan 2026
11 Feb 2026
21 Jan 2026
1 Jan 2026 - 9 Jan 2026
13 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge
(a) From 0.00 to 1.50 m depth from Average Ground Level | 50 | CuM | - | - |
| 2 | Supplying and injecting with approved quality chemical emulsion at the rates and concentrations as per IS 6313-2001 Part II for post Anti-termite treatment to existing buildings as per manufacturers specifications and as directed by the Engineer-in-Charge. Work to be executed by approved agency and specified guarantee for 7 (Seven) years shall be furnished by the tenderer. Payment will be cleared only after submission of guarantee. | 1,500 | SqM | - | - |
| 3 | Providing and laying in position cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels | 10 | CuM | - | - |
| 4 | Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications up to Plinth Level. | 10 | CuM | - | - |
| 5 | Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications in super structure up to 20.00 metre height.
Note for items of item no. 3, 4 & 5- i)In view of limit on water-cement ratio for durability requirements, concrete admixtures (Naphthalene / Melamine based superplasticizers) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for these items shall be inclusive of the cost of admixtures, trial mixes, testing (at site & at approved labs), etc. complete.
ii) All projections, fins etc. in the concrete surface formed at the joints in the formwork should be ground & flush and finished at no extra cost.
iii) Minimum cement content shall be as per latest revised relevant IS code. | 120 | CuM | - | - |
| 6 | Extra for RCC Using Ready Mix Concrete from outside project area including transporting and pumping from approved batching plants . | 130 | CuM | - | - |
| 7 | Providing Reinforcement Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules, cutting, bending, transporting, fixing, tieing in position with PVC coated with 1.6 mm dia soft drawn annealed G.I binding wire, all labour charges, cost of cover blocks in specified grade of concrete etc. complete including cost of binding wire, complete as per specifications and drawings. - Note: Using TMT bars of specified grades for all dia bars. TMT bars to be supplied by the contractor confirming to IS:1786. | 12 | MT | - | - |
| 8 | Providing Structural steel work in M.S Plain Plates and chequrred Plates for Embedded Parts, Trench Covers, Connection plates etc.including cutting, hoisting, fixing in position and applying a priming coat of approved zinc chromate steel primer etc.including cost of structural steel Plates, welding all labour charges etc. complete as per drawings and specifications.
Using materials of approved equivalent quality/ product meeting technical parameters. All test reports to be provided along with the supply of the materials
Note:
1) Structural steel required for the work shall not be supplied by the Department and the contractor has to procure the same.
2) Welding weights, connections, bolts and nuts shall not be measured for payment, but the cost of which shall be deemed to have been included in the rate.
3) All holes will be made by drilling only. Gas cutting of holes will not be permitted. | 0.5 | MT | - | - |
| 9 | Providing Structural steel work using angles, channels, joists and other sections, welded and / or bolted in built up sections for trusses , structural steel floors, frame works, monorails and other structures including supplying, cutting, welding, fabricating, hoisting, fixing in position, applying a priming coat of approved steel primer etc. complete all as per specifications, drawings and as directed by the Engineer in charge.
Up to and including 300 mm Joists, 350 mm channels, and below sections Using materials of approved equivalent quality/ product meeting technical parameters, confirming to IS 2062. All test reports to be provided along with the supply of the materials.
Note: 1) Structural steel required for the work shall not be supplied by the Department and the contractor has to procure the same.
2) Welding weights, connections, bolts and nuts shall not be measured for payment, but the cost of which shall be deemed to have been included in the rate.
3) All holes will be made by drilling only. Gas cutting of holes will not be permitted. | 3 | MT | - | - |
| 10 | Providing, centering, shuttering Form work using PVC film faced plywood to get a neat form finish surface for all types of structures including necessary strutting, proping, staging, supports etc and deshuttering the same after the specified time all as per drawings, specifications and as directed by the Engineer-in-charge at all levels
(a)For Sub Structure | 50 | SqM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.98 MB
Tendernotice_2.pdf
PDF • 2.07 MB
ProformaOfScheduleET75.pdf
Tender Documents • 1.32 MB
ScheduleAET75.pdf
Tender Documents • 0.34 MB
LetterofTransmittalET75.pdf
Tender Documents • 0.06 MB
TechnicalSpecsCarbonwrapping.pdf
Tender Documents • 0.49 MB
FormAtoHTechbidET75.xls
Tender Documents • 0.13 MB
BOQ_937761.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .