| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-AOC ROOM NO 997 GALI NO 3 PART NO 3 GANESH MURTHY NAGAR CUFFE PARADE COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹42.6 L+₹8.2 L (23.9%)Rejected-Finance FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹45.5 L+₹11.1 L (32.4%)Rejected-Finance OFFICE NO 2 GROUND FLOOR CO OP HSG SOCIETY SBS ROAD COLABA MARKET MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹57.6 L+₹23.2 L (67.3%)Rejected-Finance NOT AVAILABLE | FARIDABAD | HARYANA | 121004 | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹58.9 L+₹24.5 L (71.3%)Rejected-Finance A 14 USHA SADAN NEAR POST OFFICE COLABA MUMBAI 05 | MUMBAI | MUMBAI | MAHARASHTRA | 400005 | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
8 Feb 2023, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIRS TO DAMAGED MS GRILL RCC PARAPET RAILING STAIR RAILING COMMON AREA FLOORING CRUMPLE JOINTS AND CONNECTED WORK AT NEW RS COLABA UNDER AGE B R II UNDER GE NW NAVY NAGAR COLABA MUMBAI
2023_MES_573007_1
8125/CWE (NW) Mumbai/ E8
Open Tender
Civil Works
Item Rate
180 days
GE (NW) Navy Nagar
Class C
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Navy Nagar
₹1.2 L
Yes
14 Mar 2023
4 Jan 2023
10 Feb 2023
4 Jan 2023
8 Feb 2023
25 Jan 2023
4 Jan 2023 - 23 Jan 2023
Amount
Dismantling of wrought iron or mild steel work of any description and any position etc complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for fabrication of framed work as MS grills with ends of bars shouldered and or riveted or forged into spikes, framed guard bars barred iron doors, ladders framed balusters, walk ways, railings, framework of water tanks and similar work conform to Fe 290 Gde-E-165 & fixed in position complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for Preparation of new or previously untreated surfaces of steel or steel based materials of any description not other wise described, over 10cm width or girth and applying one coat of red oxide primer and two coat of synthetic enamel paint, complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Chipping, removing carefully old broken concrete work by low impact hammer, breaker without damaging the structure & cleaning and disposal of debris out side the premises etc complete all as specified and directed by Engineer In Charge. (Hard concrete should not be removed by force.)
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for clean existing reinforcement with wire/ rotary wire brush, making the surfaces free from loose material dirt etc complete and applying two coats of alkaline rust converting primer FEOVERT of Krishna Conchem of Roff rust cleaner of Piddilite or Dr Fixit Rust removal or shalirust of STP Ltd. on the rebars, including cleaning the reinforcement, wire brushing to remove loose rust spalls, wash the rebars with clean water within 3 min and wipe it dry complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for applying two coats of anticorrosive Treatment to Reinforcement by application of two coats of anti-rust protective coating in the form of Acrylic Polymer with a minimum solid content to 40% solid mixed with cement in 1:1.5 proportion ( 1 part polymer and 1.5 part cement) on rebars after cleaning of rust scales with time interval of minimum 4 hours between each coat by brush as per manufacturers instruction complete all as specified and directed by Engineer In Charge. Anti-rust protective shall be procured from one of manufacturer given below. (Make :- Fosroc/Sika/BASF/Krishna Conchem or as approved by GE) Note :- Measurement on the basis of area of concrete exposed.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for carry out application of ‘Bi-polar migratory corrosion inhibitor' EPCO-KP-100 on concrete surface. This inhibitor has migratory kind of property which permits the material to migrate to a virtual extent of 100 mm, through pores of concrete, inhibiting the corrosion and de-passivating the Electro-chemical reaction. It has property to attack anode as well as cathode, which is purely alkaline in nature (pH-9.5), so it has no carcinogen activity with concrete complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for providing and applying structural grade EPIBOND-21-LP prior to application of any type of mortar plaster conforming to ASTM-C-882-91 (Arizona Slant Shear Test) to ensure bond between old concrete and new concrete complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for building up the profile of structural members by using latex B2 modified air cured mortar system in damaged areas (1Cement-3 part graded cleaned pre-packed river sand 10% latex mortar by weight of cement- 0.5 w/c ratio) upto 20 mm to 40 mm thickness including leveling profiling and removing and cleaning existing vegetation growth in structural and Non- structural items complete all as specified and directed by Engineer In Charge. (Make :- Fosroc/Sika/BASF/Krishna Conchem or as approved by GE)
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Dismantling, Removing, Carefully Concrete work by low impact Hammer, Breakar without damaging the structure & cleaning and disposal of malba outside the premises etc complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for providing and applying jacketing around columns, beams, slabs, chajjas etc with Micro concrete (molith-MC) M40 including all lifts, shuttering, drilling holes and fixing shear anchor as per specification complete all as specified and directed by Engineer In Charge. Grade of Micro-concrete to be M-40 at 28 days and same shall be procured from one of manufacturer given below. (Make : Fosroc/Sika/BASF/Krisha conchem/Dr Fixit Pidilite or as approved by GE). Note : Reinforcement shall be measured and paid separately Rates including jacketing, formwork and micro concrete
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for providing and Casting in position a mix of (M30 Grade) made clean sharp aggregates 10 mm down along with addition of Non shrink admixure including transporting, mixing, laying, curing, etc complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for providing and fixing additional steel bar or stirrups of diameter in various structural elements like columns, beams and foundations including drilling, bending and fixing the bars with epoxy putty etc complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for providing form work of single length to pour the concrete /micro-concrete using waterproofing film coated ply wood complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Taking down plaster (Chipping off ) removing ,carefully Loose plaster by low impact Hammer without damaging the structure and cleaning and disposal of debris out side the premises complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour Rendering 15mm thick in CM 1:6 on fair faces of brick work /concrete surface finished even and smooth complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour Rendering 5 mm thick in CM 1:3 on ceiling finished even and smooth complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for 20 mm thick plastering in two coats 15 mm thick backing coat in CM 1:6 and 5 mm thick setting coat in CM 1:4 mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement and including scaffolding, safety net etc complete all as specified and directed by Engineer In Charge. (Note :- WPC shall be measured and paid separately)
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply only integral water proofing compound complete all as specified and directed by Engineer In Charge.
Material and labour for preparation of newly plastered surfaces of walls and applying three coats of white wash complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
All as per item 20 above but on ceiling.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour preparing newly plastered surfaces of walls and applying two coats of Acrylic based exterior paint exterior grade (100% Acrylic) over a coat of primer & bio wash on wall complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for Preparation of old painted surfaces of wood or wood based materials of any description not other wise described, over 10cm width or girth and applying one coat of synthetic enamel paint, complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for Preparation of old painted surfaces of steel or steel based materials of any description not other wise described, over 10cm width or girth and applying one coat of synthetic enamel paint over a coat of antirush paint/red oxide primer, complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for complete removal of existing treatment, preparing old surfaces and apply one coat of alkali-resistant priming paint and two coats of distemper oil emulsion white or tinted over and incl 1mm thick wall care putty on walls complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for preparation of old walls surface and applying two coats of Acrylic based exterior paint exterior grade (100% Acrylic) over a coat of primer complete as per manufactures Instructions and complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour for preparation of old surface and applying one coat of primer & two coats of chemical waterproofing treatment (601 raincoat of Pidilite or equivalent) on plastered surfaces wall, Chajja, terrace & Parapet wall such as Flexcoat, Beckcoat Exshield etc or equivalent including filling of cracks in walls/concrete with "Crack- X" of Pidilite or equivalent complete as per manufactures Instructions complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Dismantling of stone slabs, bedded and pointed in any mortar of any description or thickness in floors, approns etc. including removal of debries out of defence land complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour machine cut cudappah stone 20-25 mm thick over base, laid and jonted with grey cement slurry mixed with pigment to match the shade of the stone including rubbing, polishing and necessary hole for gas pipe complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour machine cut granite (of any type) slab 18 to 20mm thick as in like kitchen platform etc, bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of granite stone over 10 mm thick in CM 1:6 including grinding, polishing and making necessary hole for gas pipe complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour machine cut Kota stone (greenish colour, mirror polished) slab flooring 18 to 20 mm thick over cement screed bed laid and jointed with grey cement slurry mixed with pigment to match the shade of slab incl rubbing and mirror polishing, over & incl 20mm thick screed bed in CM 1:6 complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Ditto all as per item No 31 above but as in skirting over & incl backing layer of 10mm thick in CM 1:4 complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour Dismantling floor, hearth, or wall tiling incl cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Material and labour non skid coloured ceramic tiles 300 x 300 x 6 to 7mm in floors set and jonted in epoxy mortar and pointed in coloured / white cement to match the colour of tiles and including 15mm thick cement mortar screedbed in CM 1:6 complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for glazed ceramic coloured tiles 300 x 450 x 7mm thick as in dado (vertical surfaces) set and jointed with neat cement slurry and pointed with white cement, including 10mm thick rendering in CM 1:4 as backing coat complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour anodised aluminium sheeting 22 gauge thick fixed in repairs as in crumple section complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Hacking out broken glass panes of any description from wooden frames fixed with beads not exceeding 0.5 sqm each panes complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing sheet glass 3mm thick ordinary quality fixed with wooden beads in Sqm n. exc 0.50 Sqm in each panes complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Taking down CI soil/waste/vent/rain water pipes including all fittings like shoes bends swan necks etc of any dia complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI soil/waste/vent pipe in any length with ears 100 mm bore (sand cast) in any length with cement joints fixed to walls with clamp complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
ditto - as in item 40. above but except pipe.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI bends (any radius) for soil/waste pipes 100 mm bore diminishing pieces or tapers on walls complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI branch pieces single 'Y', 'T' (equal or unequal) ordinary or inverted (spigot or socket type) with parallel branches for 100mm bore pipe with ovel access door complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI soil/waste/vent pipe in any length with ears 75mm bore (sand cast) in any length with cement joints fixed to walls with clamp complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
ditto- as in item 44 above but except pipe.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI bends (any radius) for soil/waste pipes 75mm bore diminishing pieces or tapers on walls complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing CI branch piececs single 'Y'.'T' (equal or unequal) ordinary or inverted (spigot or socked type) with parallel branches for 75mm bore pipe complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing in repairs for Salt-glazed stoneware gully traps, square or round mouthed 150x100mm fixed including jointing to pipe complete all as specified and directed by Engineer In Charge.
Supply and fixing 75mm Cast iron vent cowls with cement joints with pipe complete all as specified and directed by Engineer In Charge. Note :- Work to be carried out up to 16th floor.
Supply and fixing 100mm Cast iron vent cowls with cement joints with pipe complete all as specified and directed by Engineer In Charge. Note :- Work to be carried out up to 16th floor.
Taking down PVC rain water pipes including all fittings like shoes bends swan necks etc of any dia complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing PVC (SWR) pipes 160mm bore single socketed in any length with rubber ring joints fixed to wall with clamps complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing PVC (SWR) bends (any radius) for rain water pipes 160 mm bore diminishing pieces or tapers on walls complete all as specified and directed by Engineer In Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing 1 mm thick PVC covers to MS railings of stair case hand rail of existing shape complete all as specified and directed by Engineer in Charge. Make as approved by GE
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 16th floor.
Supply and fixing in repair vitreous china squatting pan 'Orissa pattern' long pan of size 580x 440mm with integral foot rests white with 'P' or 'S' with cement joint,front or back inlet incl connection to trap and to flushing pipe,anti-syphonage pipe and making good the floor to match the existingcomplete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repairs for 10 ltrs capacity PVC Valveless, syphonic action type, flushing cistern, low level, white, with inlet, ball valve, float and handle including brackets flushing cistern and flushing pipe of suitable length, and PVC connection 450mm long complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Demolition of lime concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour cement concrete 1:5:10 E2 type with with 40mm graded stone coarse aggregate in sunken floor complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Treatment of sunken floor slab comprises of the following specifications and all as specified (i) Material and labour for cleaning of the sunken /lowered portion of the RCC slab surface (including vertical total depth plus skirting height) of floors by wire brush, chiesel out any mortar sticking to the surface and brooming / washing completely. 40 mm avg thk pcc 1:2:4 type B-0 using 12.5 mm graded aggregate as in padding concrete to achieve proper slope including 50 mm dia 350 mm long medium grade GI pipe spouts with wire guage on inside mouth to be fixed (ii) Rendering of uneven surfaces with 6 mm thick CM 1:4 mixed with and incl integral WPC @3% of weight of cement consumed. fill it with water and check dampness and seepage. where dampness and seepage noticed nozzles shall be fixed and grouting carried out (iii) All junctions points of side walls where CI/GI pipes are passing through shall be sealed with epoxy putty
(iv) After drying putty wash the slab and sides of sunken portion with water and make it clean and clear (v) Material and labour for applying two coat of polymer modified cementious water proofing coating as per manufactures instructions to bottom and vertical sides up to finished flooor level +100 mm height. The thickness of two layer shall be 1 mm. When the second layer is still sticky , coarse sand spry shall be carried out or vertical and bottom surface of the sunken portion all as specified and directed.
(vi) Plaster the bottom and sides up to bottom of the skirting with minimum 20 mm thk CM 1:4 mixed with and incl integral WPC 3 % of cement consumes as per manufacures specification including rounding of corners and junctions sloping towards spout Note:Test the water proofed area (ponding test) by filling water for atleast 72 hours and tested for leakage seepage and to the entire satisfaction of GE . Test shall be done in presence of reps of PMG and record for each sunken slab shall be maintained. the treatment shall be carried out by authorised applicators of chemicals.
(vii) All pipes laid in sunken portion shall be covered with 50 mm thk PCC 1:3:6 all around after painting with anticorrossive black japan paint. (viii) Height up to and including 14th floor.
Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Brushing neat cement slurry with 3.0kg of cement per sq. metre complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick size not less than 395mmx395mm, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including bedding layer of mortar 15mm thick in CM 1:6 for laying floor finishes complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Non - skid Ceramic tiles 7 to 8 mm thick size not less than 395mmx395mm as in skirting etc set and jointed in neat cement slurry and pointed in white or coloured cement to match with colour of tiles over and incliding 10mm thick CM (1:4) as in backing coat complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Removing demolished material exc 5 Km but n.exc 15 Km and depositing where directed complete all as specified and directed by Engineer In Charge. Note: Work shall be carried out upto G+14 storey building. Rate including scaffolding and safety net cloth at places.
RAMESH ENTERPRISES
M/s. MAYUR ENTERPRISES
ASHOK CONSTRUCTION
S S ENTERPRISES
SHREE JAGDISH FURNITURE CO.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .