Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance | ₹10.0 L | L1 | Admitted-Finance |
| 2 | L2₹10.5 LAdmitted-Finance | ₹10.5 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SHUKLA TRADERS L1 | M/S ANSHIKA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00The proposed Line relocation at Parisadiya Schools involves the safe transportation, loading, and unloading of related equipment from the electrical store center to the work site. | |||||
| 1.01 | PCC POLE 8.5 MTR | 224 | NOS. | 350 ₹78,400 | 355 ₹79,520 |
| 1.02 | LT ABC CABLE(1*16+1*25) SQ MM | 580 | MTR | 10 ₹5,800 | 12 ₹6,960 |
| 1.03 | LT ABC CABLE(3*50+1*35+1*16)SQ. MM. | 83 | MTR | 10 ₹830 | 12 ₹996 |
| 1.04 | LT ABC CABLE(1*16) SQ MM | 13 | MTR | 10 ₹130 | 12 ₹156 |
| 1.05 | LT ABC (3*95+1*70+1*16)SQ MM | 1,061 | MTR | 10 ₹10,610 | 12 ₹12,732 |
| 1.06 | LT XLPE CABLE AT 3.5*70 SQ. MM | 11 | MTR | 10 ₹110 | 12 ₹132 |
| 1.07 | LT ABC CABLE(3*50+1*16)SQ MM | 134 | MTR | 10 ₹1,340 | 12 ₹1,608 |
| 1.08 | ACSR WEASEL CONDUCTOR | 11.79 | KM | 1,450 ₹17,096.95 | 1,500 ₹17,686.50 |
| 1.09 | GI WIRE 7/10 SWG(3.15MM) 06KG/STAY | 222 | KG | 10 ₹2,220 | 12 ₹2,664 |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
23 Feb 2026, 4:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER ELECTRICITY DISTRIBUTION CIRCLE I MOHADDIPUR, GORAKHPUR
For the work of Line Shifting of Schools to be carried out under the deposit scheme in the financial year 2025-26 under Electricity Distribution Division, Chauri Chaura, Gorakhpur
2026_PVVNV_1107154_2
37/EDC-I(G)/2025-26
Open Tender
Electrical Works
30 days
GORAKHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC I GORAKHPUR
₹11,000
5 Mar 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
The proposed Line relocation at Parisadiya Schools involves the safe transportation, loading, and unloading of related equipment from the electrical store center to the work site.
PCC POLE 8.5 MTR
LT ABC CABLE(1*16+1*25) SQ MM
LT ABC CABLE(3*50+1*35+1*16)SQ. MM.
LT ABC CABLE(1*16) SQ MM
LT ABC (3*95+1*70+1*16)SQ MM
LT XLPE CABLE AT 3.5*70 SQ. MM
LT ABC CABLE(3*50+1*16)SQ MM
ACSR WEASEL CONDUCTOR
GI WIRE 7/10 SWG(3.15MM) 06KG/STAY
GI WIRE 6 SWG
GI WIRE 8 SWG
LT PVC 10 SQ. SINGLE CORE CABLE
OTHER LINE MATERIALS
SUPPLY OF FOLLOWING MATERIALS
I HOOK WITH CLAMP
I HOOK (FOR DEAD END CLAMP)
I-HOOK
I HOOK NUT WITH BOLT
TOP CHANEL CLAMP
NUT & BOLT
DEAD END CLAMP
DEAD END CLAMP WITH I HOOK
PIERCING CONNECTOR
LT PIERCING CONNECTOR 120SQ. MM
DROPPER ANGLE CLAMP
11 KV V TYPE CROSS ARM CLAMP
F- BRACKET WITH NUT BOLTS
CLAMP FOR DROPPER & TOP, TEE OFF CHANNEL
CLAMPS FOR TOP, T-OFF WITH BOLTS & NUTS
CLAMP FOR T-OFF CHANNEL
CLAMPS FOR 11 KV V TYPE CROSS ARM WITH BOLTS AND NUTS
STONE PAD
CLAMP FOR GUARDING CHANNEL
GUARDING ANGLE WITH CLAMP
LT CLAMP
CYCLE INSULATOR
SUSPENSION CLAMP WITH NUTS AND BOLT
SUSPENSION CLAMP WITH I HOOK
SUSPENSION CLAMP
CLAMP FOR T/F(75*8MM)
DISTRIBUTION BOX WITH CLAMP
EARTHING CLAMP
STAY INSULATOR
F CLAMP
STAY CLAMP
HOLDING CLAMPS FOR TOP CHANNEL TPMO & FUSE SET ETC WITH BOLTS & NUTS
DANGER PLATE WITH CLAMP AND NUT & BOLT
NUT BOLT AND WASHER ALL SIZES
CLAMPS FOR T-OFF WITH BOLTS & NUTS
DANGER BOARD BARBED WIRE INCLUDING JUMPER
LT POLE CLAMP FOR CABLE
SHAKLE INSULATOR
HOLDING CLAMP
Reuse of Old line conductor from work sites at 22 Work Site.
ERECTION WORK OF SINGLE 8.5 MTR PCC POLE WITH ALL FITTING AS PER ESTIMATE
ERECTION WORK OF DOUBLE POLE STRUCTURE (8.5 MTR PCC POLE) WITH ALL FITTING AS PER ESTIMATE.
GROUTING OF POLE
CONCRETING OF STAY
EARTHING OF POLE
Erection of HT line 3-phase 3-wire conductors, mounting on insulators, sagging and tightening, and binding at each pole.
Spreading the aerial bundled conductor, mounting it on insulators, sagging and tightening it, and binding it at each pole.
Mounting of an 11/0.04 kV transformer along with all associated fittings at the LT electrical substation. (A) 10 KVA Single Pole
(B) 25 KVA Double Pole
(C) 63 KVA Double Pole
Earthing of Transformer
Refitting of Crass Arm
DISMANTLING AND REMOVING OF HT/LT LINE
DISMANTLING OF TRANSFORMER
CONCRETING OF POLES (0.268 CU. M. EACH)
DISMENTALING OF POLE
TRASFORMER SHIFTING 10KVA/63KVA T/F
Reuse of Old line items like Disk/Pin Insulator, LT clamp, Crass Arm and T-off Clamp
GUARDING SET INSTALLATION
DISMENTALING AND ERRECTION POLE & CONDUCTOR
GST extra on above rate
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
TenderForm37.rar
Tender Documents • 0.12 MB
BOQ_2075488.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid