Loading…
Loading…
Tender Value
₹3320.9 Cr
EMD Value
₹33.2 Cr
Closing Date
4 Aug 2026, 11:00 am
Ashvini Kumar Rai
NHAI HQ
Construction of new 4-lane Access Controlled Coastal Highway from Rameshwar to Konark (km.0 to km. 79.400) on Hybrid Annuity Mode in the State of Odisha (Package-I).
2025_NHAI_256694_1
NHAI/OD/ Coastal Highway/Pkg-1
Open Tender
Civil Works
Works
910 days
NHAI HQ
Please refer Tender documents.
9 documents required · 9 mandatory
₹3.4 L
NHAI HQ
₹33.2 Cr
4 Aug 2026
25 Nov 2025
5 Aug 2026
25 Nov 2025
4 Aug 2026
25 Nov 2025
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
123.rar
Tender Documents • 5.40 MB
Corrigendum-X.pdf
PDF • 2.03 MB
Annexure-1 .pdf
PDF • 0.44 MB
Corrigendum-X.pdf
PDF • 2.03 MB
GAD_Approved GAD of ROB_Approved ROB CH.4+136.759.pdf
PDF • 24.52 MB
GAD_Approved GAD of ROB_Approved ROB CH.51+688.04.pdf
PDF • 24.22 MB
GAD_COASTAL PKG-1 GAD.pdf
PDF • 82.54 MB
Hydrology Report_Final HYD report at Ch. 13+000..pdf
PDF • 0.90 MB
Hydrology Report_Final HYD report at Ch. 13+380..pdf
PDF • 0.91 MB
Hydrology Report_Final HYD report at Ch. 15+039.pdf
PDF • 0.90 MB
Hydrology Report_Final HYD. at Ch. 21+885.pdf
PDF • 0.33 MB
Hydrology Report_Final Hydrology_Report at Ch. 30+722, 45+515 & 57+910.pdf
PDF • 0.99 MB
Hydrology Report_Final HYD_39+857_MNB.pdf
PDF • 0.39 MB
Hydrology Report_Final report 32+432 & 32+632 minor bridge ref..pdf
PDF • 0.28 MB
Hydrology Report_Final Updated 31+808 & 31+972 minor bridge ref..pdf
PDF • 0.27 MB
Hydrology Report_HYD. REPORT AT Ch. 7+307, 6+841, 8+630, 9+642.pdf
PDF • 0.33 MB
Hydrology Report_Hydrology Cal of minor bridge at chainage 1+058.pdf
PDF • 0.17 MB
Hydrology Report_Hydrology Cal of minor bridge at chainage 10+452.pdf
PDF • 0.25 MB
Hydrology Report_Hydrology Cal of minor bridge at chainage 3+545.pdf
PDF • 0.17 MB
Hydrology Report_Hydrology Cal of minor bridge at chainage 5+533.pdf
PDF • 0.18 MB
Hydrology Report_Hydrology Cal of MJBCh. 20+195.pdf
PDF • 0.22 MB
Hydrology Report_Hydrology Cal ofMJB 22+800.pdf
PDF • 0.20 MB
Hydrology Report_Hydrology Report of minor bridge at chainage 32+970 ,33+985.pdf
PDF • 0.20 MB
Technical Schedule_Technical Schedule.pdf
PDF • 9.62 MB
Volume IV EIA-SIA Report_Volume IVA EIA Report.pdf
PDF • 3.68 MB
Volume IV EIA-SIA Report_Volume IVB Resettlement Action Plan.pdf
PDF • 1.94 MB
Volume-I Main Report_Volume-I Main Report.pdf
PDF • 22.61 MB
Volume-II Design Report_Volume-II Design Report (Highways).pdf
PDF • 7.27 MB
Volume-III Material Report_Volume III Material Report.pdf
PDF • 2.39 MB
Volume-IX Drawing Volume_1. Highway Drawing Volume.pdf
PDF • 102.98 MB
Volume-IX Drawing Volume_2. Traffic Signage Plan.pdf
PDF • 17.69 MB
Volume-IX Drawing Volume_3. Utility Relcoation Plan Electrical Service.pdf
PDF • 16.72 MB
Volume-IX Drawing Volume_4. Draiange Plan Package 1.pdf
PDF • 45.60 MB
Volume-V Technical Specification_Volume V Technical Specifications.pdf
PDF • 2.01 MB
Coastal PKG 1.kmz
PDF • 0.05 MB
Corrigendum IX.pdf
PDF • 0.15 MB
EC MoM Coastal HWY.pdf
PDF • 0.27 MB
Geotechnical Report Pkg-I.pdf
PDF • 28.03 MB
Replies to Pre-bid queries.pdf
PDF • 4.21 MB
IX.pdf
PDF • 0.15 MB
App-I.pdf
PDF • 0.32 MB
57.pdf
PDF • 0.04 MB
60.pdf
PDF • 0.92 MB
VI.pdf
PDF • 0.13 MB
V.pdf
PDF • 0.13 MB
IV.pdf
PDF • 0.18 MB
Corri30001.pdf
PDF • 0.12 MB
pkg1.pdf
PDF • 0.12 MB
I.pdf
PDF • 0.18 MB
P&P Costal Package-01.pdf
PDF • 76.69 MB
Technical Schedule Costal (Package-01).pdf
PDF • 1.66 MB
GAD Costal Package-01.pdf
PDF • 95.27 MB
TECHDOCSpart2.rar
PDF • 38.00 MB
TECHDOCSpart1.rar
PDF • 38.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].