Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 LAccepted-Finance | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹2.4 L+₹6,444 (2.71%)Accepted-Finance | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹2.5 L+₹8,000 (3.36%)Accepted-Finance | 3 | Accepted-Finance Found Eligible |
| Sl No | Description | Qty | Unit | Vishwakarma Enterprises L1 | Chargotra Trading Co. L2 | R K Electrical and Engineering Works L3 |
|---|---|---|---|---|---|---|
| 1.00 | 1. Dismounting of 485 kW, 650 HP BHEL Make HT motor from its place of installation by way of disengaging all its three phase cable connections of rotor, stator, commutator assembly, trifurcated sealing box, etc. Opening & disengaging coupling set (Motor half coupling & Pump-half coupling) of Unit, separating motor from motor skirt by opening all its nuts & bolts and placing motor on steel fabricated stool properly. Complete job. 01Job
2. Extraction of whole pumping unit from its respective pit by way of dismantling, opening all internal and external 500 mm dia. x 200 mm dia. x 70 mm dia. lengths of column assembly components in sequence along with connected fittings such as muff coupling, C.I. Guide spiders, top shaft, stuffing box, C.I. Bell mouth, enlarger, strainer and bowl assembly lubrication system of column assembly one by one and stacking of each at pump house after checking and segregating of damaged defective parts of each. Complete job. 01Job
3. Transportation of the damaged Bowl assembly of the pumping unit from the site to workshop for repairs using manual labour, mechanical transport, mobile crane etc. Back shifting to site LIS Ranjan after repairs, unloading. Complete job. 01Job
4. Dismantling of bowl assembly by way of opening and extraction of 3no. Bowl cases, 3 No. stainless steel impellers from SS impeller (pump) shaft in sequence by removing / disengaging all nuts and bolts, lock rings, back plate of each bowl case with fabricated pullers, heavy duty tools and tackles without damaging of cast iron bowl and SS impeller. Proper stacking of each dismantled parts / components. Complete Job. 01Job
5. Fabrication/Providing/Fitting and Replacement of old broken SS-410 Impeller shaft by the new SS-410 Impeller shaft with the same requisite specifications. 01 complete job
6. Providing of new cast / fabricated and machined leaded bronze impeller wearing ring in reconditioned seat having proper clearances with the impeller (as per size and specification) 03 complete Jobs
7. Complete assembling of the bowl assembly by way of mounting of three no’s AISI-410-SS impellers on 85 mm dia., 2850 mm long pump shaft with three no. bowl cases, one no. enlarger, one no. bell mouth, one no. stiffener in sequences at their respective places with key holding rings, back washers suitable with required allowances. Re-connecting of M.S. strainer to bowl assembly. Complete job in all respects. 01Job
8. Fitting of AISI-410-SS muff coupling along with 01 No. shaft enclosing tube (the material used for the muff coupling and shaft enclosing tube will be provided by the department presently lying at the sub-divisional store). Complete job. 01 Job | 1 | Job | 4,760 ₹2,33,240 Lowest | 4,668.88 ₹2,39,775.12 | 4,624.8 ₹2,41,375.2 |
Tender Value
₹2.5 L
EMD Value
₹4,978
Closing Date
23 Jan 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of Executive Engineer MID Akhnoor/Nowshera
Repair/Reconditioning of worn-out parts of Bowl assembly components of 20 cusecs discharge VT Pumping unit no. 04 and allied works installed at L.I.S. Ranjan
2026_IFC_300693_1
MID/AN/93
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
10 days
Ranjan
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
₹4,978
Yes
Office of Executive Engineer MID Akhnoor/Nowshera
27 Jan 2026
15 Jan 2026
24 Jan 2026
15 Jan 2026
23 Jan 2026
17 Jan 2026
16 Jan 2026
1. Dismounting of 485 kW, 650 HP BHEL Make HT motor from its place of installation by way of disengaging all its three phase cable connections of rotor, stator, commutator assembly, trifurcated sealing box, etc. Opening & disengaging coupling set (Motor half coupling & Pump-half coupling) of Unit, separating motor from motor skirt by opening all its nuts & bolts and placing motor on steel fabricated stool properly. Complete job. 01Job 2. Extraction of whole pumping unit from its respective pit by way of dismantling, opening all internal and external 500 mm dia. x 200 mm dia. x 70 mm dia. lengths of column assembly components in sequence along with connected fittings such as muff coupling, C.I. Guide spiders, top shaft, stuffing box, C.I. Bell mouth, enlarger, strainer and bowl assembly lubrication system of column assembly one by one and stacking of each at pump house after checking and segregating of damaged defective parts of each. Complete job. 01Job 3. Transportation of the damaged Bowl assembly of the pumping unit from the site to workshop for repairs using manual labour, mechanical transport, mobile crane etc. Back shifting to site LIS Ranjan after repairs, unloading. Complete job. 01Job 4. Dismantling of bowl assembly by way of opening and extraction of 3no. Bowl cases, 3 No. stainless steel impellers from SS impeller (pump) shaft in sequence by removing / disengaging all nuts and bolts, lock rings, back plate of each bowl case with fabricated pullers, heavy duty tools and tackles without damaging of cast iron bowl and SS impeller. Proper stacking of each dismantled parts / components. Complete Job. 01Job 5. Fabrication/Providing/Fitting and Replacement of old broken SS-410 Impeller shaft by the new SS-410 Impeller shaft with the same requisite specifications. 01 complete job 6. Providing of new cast / fabricated and machined leaded bronze impeller wearing ring in reconditioned seat having proper clearances with the impeller (as per size and specification) 03 complete Jobs 7. Complete assembling of the bowl assembly by way of mounting of three no’s AISI-410-SS impellers on 85 mm dia., 2850 mm long pump shaft with three no. bowl cases, one no. enlarger, one no. bell mouth, one no. stiffener in sequences at their respective places with key holding rings, back washers suitable with required allowances. Re-connecting of M.S. strainer to bowl assembly. Complete job in all respects. 01Job 8. Fitting of AISI-410-SS muff coupling along with 01 No. shaft enclosing tube (the material used for the muff coupling and shaft enclosing tube will be provided by the department presently lying at the sub-divisional store). Complete job. 01 Job
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_975393.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .