Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹42.1 LAccepted-Finance | 1 | Accepted-Finance LOWEST | |
| 2 | 2₹44.8 L+₹2.7 L (6.41%)Accepted-Finance | 2 | Accepted-Finance 2ND | |
| 3 | 3₹45.4 L+₹3.3 L (7.77%)Accepted-Finance | 3 | Accepted-Finance 3RD | |
| 4 | 4₹47.1 L+₹5 L (11.9%)Accepted-Finance | 4 | Accepted-Finance 4TH | |
| 5 | Rejected-Technical | - | Rejected-Technical The bidder has not confirmed the eligibility criteria, hence rejected |
Tender Value
₹56.1 L
EMD Value
₹1.1 L
Closing Date
8 Jun 2020, 3:30 pmClosed
SE, IWD, IIT KANPUR
IWD IIT KANPUR
Drilling of two new deep tube wells at IIT Kanpur
2020_IITK_553283_1
29/C/D3/2019-20/01
Open Tender
Civil Works
Item Rate
150 days
IIT KANPUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.1 L
19 Jun 2020
19 Mar 2020
12 Jun 2020
19 Mar 2020
8 Jun 2020
19 Mar 2020
Amount
RAIN WATER HARVESTING & TUBEWELLS
"Carrying out electrical resistivity survey for locating the potable water bearing strata For drilling tube well up to maximum of three points the survey shall be carried out byThe agency approved by government
Transportation of rig Machine, compressure, O.P. Unit and T& P Etc.
Pilot bore 200 mm Dia by direct rotator rig machine.
Reaming of bore hole, 675 mm dia from ground level to 60 meters.
Reaming of bore hole, 450 mm dia reaming of bore hole from 60 mtrs. And below.
Lowering of tube well assembly, 200 mm dia 10 mm thick M.S bail plug.
Lowering of tube well assembly. 200 mm dia nominal bore M.S.E.R.W blind pipe 7 mm thick plain end as per IS4270-1992.
Lowering of tube well assembly, 200 mm dia nominal bore M.S.E.R.W blind pipe 7 mm thick slotted pipe plain end .
Lowering of tube well assembly, 350 X 200 mm dia M.S reducer 10 mm thick.
Lowering of tube well assembly, 355 mm dia ( O.D) M.S housing Pipe 8 mm thick plain end as per IS 4270-1992.
Lowering of tube well assembly, 350 mm dia tube well cap 6 mm thick.
Lowering of tube well assembly, Centering guide.
Supplying and laying of Pea gravel around the bore hole.
P/F M.S Clamp.
Development of tube well by heigh velocity jetting with air Compressure.
"Development of tube well by Over Pumping Unit "
Electric logging by approved Govt. agency. I
Getting the Tube well water chemical report from CGWS or any other Govt department
M/S KUMAR TUBEWELL WORKS
Drillexperts P LTD
CENTRAL INDIA TUBEWELL CORPORATION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .