Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹12.8 L
EMD Value
₹12,800
Closing Date
10 Feb 2023, 3:00 pmClosed
BDO(BP)
BDO office, Salem
Salem District - Salem Block- Construction of 60000 Litre OHT Near Muniyappan Kovil at Panangadu H/O Andipatty at SFC District Panchayat
2023_RDTN_285134_1
293/2023/A2
Open Tender
Civil Works
Item Wise
90 days
BDO Office
As per tender document
2 documents required · 2 mandatory
₹0
₹12,800
20 Feb 2023
1 Feb 2023
10 Feb 2023
1 Feb 2023
10 Feb 2023
1 Feb 2023
Amount
1) Construction of 60000 Litre OHT near Muniyappan kovil @ Panangadu H/o Andipatty
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement etc.,
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and filling foundation and basement with filling sand in layers not more than 15cm. Thick well ramed, watered and compacted complete complying with standard specification.
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reingorcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing. etc
items 0 m to 1.50m below GL
items 0.0 to 4.50m below GL
items above 4.51m to 6.42m
items above GL 7.32m to 10.98m
Supplying, fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, complete complying with standard specification.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded mild steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 25mm x 25mm x 3mm
From G.L.0.00 to 3.30m
From 3.31 m to 4.30 m for brace sides
For Square coloumn (4.30-5.30)
Floor beam bottom (5.30-6.30) roof beam bottom (6.30 to 6.42m)
Plan Surface Upto 6.30m to 7.30m height
Curved Surface Upto 7.31m to 8.30m height
Curved Surface Upto 8.31m to 9.30m height
Curved Surface Upto 9.31 to 10.30m height
Upto 10.31m to 11.30m height Plane Surface
Cuved Surface 10.31m - 11.30m Roof Slab side
Painting two coats over newplastered using approved cement paint including cost and conveyance of all materials to site etc complete
Supplying , fabricating, Delivery and placing in position MS steel Ladder wide 0.45m made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c/c welded and Jointed etc., Complete complying with Standard specification
Suppllying and Fixing of RCC inner access Ladder in RCC 1:11/2:3 mix etc., complete complying with standard specification.
Providing PVC ventilating arrangements mosquito proof nylon net with 110mm PVC cowl and as directed by Departmental Officers
Providing Manhole cover of size 0.60x0.60m in RCC 1:11/2:3 mix with suitable reinforcement and 50x50x6mm Ms angle fixed along edges and as directed by Departmental Officers
Refilling in basement with excavated earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete
Cost and supply of 50mm GI pipe
cost and supply of 50mm GI coupling
cost and supply of 50mm GM Gate valve
Earth work excavation and depositing on bank with an initial
Supply and delivery of PVC / GI pipes as per BIS Standards 63 MM OD6
Labour Charges for laying and jointing of PVC pipes and specials
Refilling the excaveted earth as per the standard specification 63 MM
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
sithan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .