Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹9.8 L+₹1.1 L (12.0%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s SAJAD AHMED SHEIKH L2 | RAYEES AHMED WANI L1 |
|---|---|---|---|---|---|
| 1.00 | Site Preparation
Earthwork in excavation by manual means over area for leveling purpose including disposal of excavated earth up to 50m from cutting edge and should be disposed in near-by all kind of soil
Foundation for plinth work = 64’-0”-0” x 1’-6” x 1’-6’ ’= 146.25ft3
Foundation for columns = 6 x (2’ x 2’ x 3’-0”) = 72ft3
Foundation for plinth protection = 72’-0” x 1’-6” x 0’-6” = 54 ft3
Total = 272.25ft3 = 7.70 m3
Area to be excavated keeping in view the earth quake resistance for which a ms mesh (10 mm) is to be provided in the base foundation of the plinth
(SCH – 2.8.1) | 7.7 | m3 | 250 ₹1,925 Lowest | 630 ₹4,851 |
| 2.00 | Providing and laying of cement concrete (1:5:10) using 40mm nominal size nallah stone.
Plinth work = 64’-0” x 1’-6” x 0’-6’’= 48 ft3
Flooring= 18’-0” x 14’-0” x 0’-3’’= 75.6 ft3
Foundation for columns = 6 x (2’ x 2’ x 6”) = 12 ft3
Plinth Protection= 72’-0” x 1’-6” x 0’-6” = 54 ft3
Total = 189.6 ft3 = 5.36m3
(SCH – 4.4.8) | 5.36 | m3 | 2,500 ₹13,400 Lowest | 4,200 ₹22,512 |
| 3.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (one cement: Two coarse sand: Four Graded stone aggregate 20 mm nominal in size)
Plinth work = (64’-0” x 1’-6” x 1’-0’’) + (64’-0” x 1’-0” x 2’-0’’) = 224 ft3
Flooring = (18’-0” x 14’-0” x 0’-6’’) = 126 ft3
Foundation for Columns = 6 x (1’-6” x 1’-6” x 1’-6”)+ 2 x (1’-6” x 1’-0” x 2’-0”) = 26.25ft3
Plinth Protection = 72’-0” x 1’-6” x 0’-6”= 54 ft3
KITCHEN Slab = (11’-6” x 2’-6” x 0’-6”) + 4 x (3’-0” x 2’-6” x 0’-6”) = 29.37 ft3
Total = 459.62ft3 = 13.01m3
(SCH – 4.4.3) | 13.01 | m3 | 8,400 ₹1,09,284 | 5,800 ₹75,458 Lowest |
| 4.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Mild steel and medium tensile steel bars for Plinth beam
10 mm bar of length 500’ = 152.5 mtr = @ 0.617 kg per metre = 94.03 kg
8mm bar of length Tie beam 1437’ = 437.99mtr = @ 0.395 kg per metre = 173.00 kg
Total =267.03 kg
(SCH-5.22.1) | 267.03 | kg | 100 ₹26,703 | 65 ₹17,356.95 Lowest |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.1 Foundations, footings, bases for columns
Area = 2 x (64’-0” x 2’-0”) = 256 ft2 = 23.78m2
(SCH-4.6.1) | 23.78 | m2 | 250 ₹5,945 Lowest | 250 ₹5,945 Lowest |
| 6.00 | 12 mm cement plaster to plinth wall of mix 1 : 3 (1 cement : 3 fine sand)
Area = (64’-0” x 2’-0”) = 128 ft2 = 11.89m2
Total = 13.38 m2
(SCH - 13.1.2) | 11.89 | m2 | 250 ₹2,972.5 Lowest | 250 ₹2,972.5 Lowest |
| 7.00 | Supplying and filling in plinth with fine sand under floors including, watering, ramming, consolidating and dressing complete. SCH-2.23
Area = (18’-0” x 14’-0” x 1’-6”) = 378ft3 = 110.69m3 | 10.69 | m3 | 350 ₹3,741.5 Lowest | 500 ₹5,345 |
| 8.00 | Steel work welded in built up section/ framed work including cutting, hosting, applying a priming coat using structural steel. In gratings, frames, guard bard, ladders, railings etc. trusses including primer and enamel paint including nut bolts, kingpost, struts etc.
Column Square Hollow Pipe Section (100 x 100 x 5 mm) = 8 x (10’-0”) = 24.38m @ 14.58 kg/m = 355.51 kg
MS Sq. Plate of size (200 x 200 x 10 mm): = 35 kg
Rectangular Sections Truss (100 x 50 x 04mm) = 29 rm @ 08.7kg/m = 252.3 kg
Rectangular Sections Truss Bracing (50 x 50 x 03.6mm) = 60 rm @ 05.07kg/m = 304.2 kg
Rectangular Sections Parlins of size (50 x 50 x 3.6mm) = 43.9 rm @ 5.07 kg/m = 222.57 kg
Side rails (50 x 25 x 2.60 mm)= 29.26 m @ 2.71 kg/m = 79.29 kg
24 MS Anchor Bolts of size 20 mm x 750 mm
24x2’-6”=60’[email protected] per metre=75.75 kg
Rectangular C-Channel ISMC 75 23.81 rm @ 6.8 kg/m = 161.90 kg
Total Weight = 1486.52 Kg
(Sch-10.2.2) | 1,486.52 | kg | 150 ₹2,22,978 | 65 ₹96,623.8 Lowest |
| 9.00 | Supply and installation at site of Prefabricated PUF (Poly-Urethane Foam) Panels of size 60 mm thick Fire proof Panels for walls (PPGI finish on both sides) to make a closed structure on the outer frame including doors and windows.
Prefabricated Sandwich PUF panels with Cam toggle type fasteners fitted and self-locking PVC gaskets fitted on all sides of wall and ceiling including rivets, Silicones, Anchor fastener, self drilling screw and all other allied accessories required for the installation/erection of PUF panels.
a. Wall to wall cam locking system. Internal/External flashing to be provided.
Job includes Cladding on all walls including sunshade on all windows and outer doors. | 1 | job | 3,50,000 ₹3,50,000 | 3,00,019.25 ₹3,00,019.25 Lowest |
| 10.00 | Fabrication, Providing and Fitting of Aluminum doors, windows and ventilators with frame made out of Powdered coated aluminum of gauge not more than 12 mm including glass, rubber beading, aluminum Fly mesh, aluminum sheet panels for doors and other allied accessories. The total no. quantity of doors and windows are enclosed as per Annexure “A”. The color and final design is approved by Engineer in charge | 1 | job | 1,40,000 ₹1,40,000 | 84,000 ₹84,000 Lowest |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
21 Nov 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVEV ENGINEER M AND H DIVISION DODA
KHELLANI DODA
Construction of Pre-Fabricated Hut with Toilet at Marwah Kishtwar
2025_PWDJK_294903_1
MHDD/TS/2025-26/91
Open Tender
Civil Works - Others
Turn-key
60 days
MARWAH KISHTWAR
AS PER SBD
2 documents required · 2 mandatory
₹1,000
EXECUTIVEV ENGINEER M AND H DIVISION DODA
₹20,000
EXECUTIVE ENGINEER M AND H DIV DODA
22 Nov 2025
12 Nov 2025
21 Nov 2025
12 Nov 2025
21 Nov 2025
12 Nov 2025
17 Nov 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
BOQ_954253.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .