| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC 1759 58 30 KRISHNAPURI MATHURA | MATHURA | MATHURA | UTTAR PRADESH | 1 | Accepted-AOC Lowest | |
| 2 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC | |
| 3 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC | |
| 4 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC | |
| 5 | Not Admitted-Finance 6 214 BHERON PARK BELANGANJ AGRA | AGRA | AGRA | UTTAR PRADESH | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
3 Oct 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SM HQ
A-1/4 Upsida Complex Lakhanpur Kanpur
Upgradation and maintenance of road No.2, 5, 8 and 9 at IA Firozabad in Distt. Firozabad
2020_SIDC_512693_1
cd_5_4_dt_280720
Open Tender
Civil Works
Item Rate
180 days
Firozabad
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,716
UPSIDC
₹3.0 L
24 Feb 2021
18 Sept 2020
5 Oct 2020
18 Sept 2020
3 Oct 2020
18 Sept 2020
90 days
Amount
Supply and Stacking of 22.40-53 mm guage hard stone ballast from approved quarry for top coat including royalty, cartage octroi, sales tax whatsoever applicable under rules and also including stacking to the required template after screening at road side, including dressing of side berms as required where metal is to be stacked as per direction of Engineer-in-charge.
Collection Stone Dust for consolidation & blanket coat for consolidation.
Consolidation of 22.40-53 mm guage stone ballast for 10 cm thick (loose) coat by road roller including opening out stacks shorting ballast into different size and spraeding them including making medhi to retain water and also including screening material using for blinding purpose and also including carriage of water and T & P etc.required for proper completion of the work.
Water allowance for consolidation of Stone ballast to be allowed between 15th November & 31st May.
Bitumen painting over W.B.M. surface (Ist coat Painting) including supply of 13.2 mm guage stone grit and bitumen including maintenance of road side patries and watering them duri operation for proper completion of work as directed by the Engineer-in-charge and also including road roller charges and its fuel, the wages of fireman and Tar boiler and also supply of matwerial, labour and including priming coat T&P etc. required for proper completion of the work as per direction of Engineer-in-charge. Bitumen use VG-10.
Providing and laying 50mm Bituminous macadam with 100 to 120 batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 3.3% by weighty of total mix and fitter, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade level and alignment, rolling with smooth wheeled vibrator and tandem roller achieve desired compaction as per MORTH Specification clause - 507 complete in all respect. Bitumen use VG-30 grade @ 3.3% (Including tack coat bitumen will be used VG-10 @ 0.600 kg / sqm.
Providing and applying tack coat with Bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous / granular surface, cleaned with mechanical brooms as per direction of Engineer-In-Charge.
Providing and laying 25mm thick semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder to 5 percent of mix and filler transporting the hot mix to work site, laying with hydrostatic power finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and random rollers to achieve the desired compaction as per MORTH specifications clause 50B complete in all respects. Bitumen used grade VG-30 grade @ 5%.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .