Loading…
Loading…
Tender Value
₹7.4 L
EMD Value
₹74,017
Closing Date
28 Aug 2026, 5:00 pmDue today
Executive Officer
NP BISANDA
SUBMILATION / CONSTRUCTION OF CC ROAD/DRAIN And PULIYA FROM PRIMARY SCHOOL TO H/O ANIL SINGH W.NO.15 GAHBAR THOK BISANDA
2026_DOLBU_1177987_1
609/Nirman/NPBisanda/2026-27 Date 18-08-2026
Open Tender
Civil Works
Percentage
NP BISANDA
Please Refer Tender Dacument
2 documents required · 2 mandatory
₹873
Executive Officer
₹74,017
19 Aug 2026
19 Aug 2026
29 Aug 2026
19 Aug 2026
28 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of site | 1 | Job | 2,000 | ₹2,000 |
| 2 | Dismentaling of old rcc work | 4.5 | CUM | 800 | ₹3,600 |
| 3 | Earthwork excavation in B/C Soil including lift up to 1.5 m and lead upto 30m t&p etc all complete (si. No. 251 chapt. No. 4 page no. 23) | 11.9 | CUM | 120 | ₹1,428 |
| 4 | DEWATRING BY 5 H.P PUMP SET | 5 | Day | 1,360 | ₹6,800 |
| 5 | 50% Disposal of malwa upto 5km. From site | 5.91 | CUM | 183 | ₹1,081.53 |
| 6 | S/L of laying of first class 0 bedding on well compacted sand ,morram or approved granilar materials as per class 1105 b( chapt no. 9 page no. 88) | 42.89 | CUM | 1,500 | ₹64,335 |
| 7 | cement concrete with 4cm (1/2") gauge approved stone ballest , approved course sand cement in the proportion 1:4:8 including supply of all materials , labours and tools and plants etc.required for proper complition of the work | 34.81 | CUM | 4,300 | ₹1,49,683 |
| 8 | R.C.C Work cement approved cource sand and 2cm (3/4) gauge approved stone ballast in the proporation 1:1.5:3 excluding supply of rainforcement and its binding but including its fixing and binding the same with 24B.W.G.I. bindingwire on including | 6.48 | CUM | 7,100 | ₹46,008 |
| 9 | mild steel of iron work such as rainforcement concrete work (which not including all over rates) wrought to required shape as cnecessary including bending supply of steel its wastage and hooks and outhorized overlapping shall be | 5.09 | QTL | 5,600 | ₹28,504 |
| 10 | C.C Work cement approved cource sand and 2cm (3/4)
gauge approved stone ballast in the proporation 1:1.5:3 excluding supply of rainforcement and its binding but including its fixing and binding the same with |24B.W.G.I. bindingwire on including | 66.42 | CUM | 6,100 | ₹4,05,162 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_2213482.xls
BOQ • 0.29 MB
NIT9.pdf
Tender Documents • 1.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].