Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹1,061.05Accepted-AOC | ₹1,061.05 Quoted ₹10.6 Cr | H1 | Accepted-AOC H1,Awarded |
| 2 | Rejected-Technical | - | - | Rejected-Technical Not-Prequalified |
| Sl No | Description | Qty | Unit | P H Construction H1 |
|---|---|---|---|---|
| 1.00Clearing and Grubbing Road Land | ||||
| 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150mm as per Technical Specification Clause 201. | 0.07 | Hec | 90,910.4 ₹6,363.73 |
| 2.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 1,624.9 | Cum | 123.2 ₹2.0 L |
| 3.00 | Construction of Embankment with Material Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 974.94 | Cum | 310.8 ₹3.0 L |
| 4.00 | Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 5,022.68 | Cum | 922.6 ₹46.3 L |
| 5.00 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 608.4 | Cum | 728 ₹4.4 L |
| 6.00 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 60 | Cum | 728 ₹43,680 |
| 7.00(I) SUB BASE AND BASE COURSE | ||||
| 7.01 | Construction of granular sub-base with locally available graded material, spreading in uniform layers with motor grader on prepared surface, watering to OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification/ direction of EE. | 484.3 | Cum | 5,987.74 ₹29.0 L |
| 7.02 | WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. | 140.9 | Cum | 8,270.64 ₹11.7 L |
Tender Value
₹7.6 Cr
EMD Value
₹15.2 L
Closing Date
27 Jun 2025, 6:00 pmClosed
Empowered Officer, SRRDA,PMGSY
Office of the Empowered Officer, SRRDA, PMGSY Cell Lower lachumiere, Meghalaya, Shillong - 7930001 0364-2506228/ [email protected]
Construction i/c MBT
2025_CEMEG_141780_1
MG03III0305B
Open Tender
Civil Works - Roads
730 days
River Myntang
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,000
₹15.2 L
Yes
Shillong
16 Dec 2025
6 Jun 2025
30 Jun 2025
6 Jun 2025
27 Jun 2025
6 Jun 2025
6 Jun 2025 - 27 Jun 2025
20 Jun 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 1.59 MB
BOQ.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid