Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹25.6 L+₹38,788.92 (1.54%)Admitted-Fee/PreQual/Technical/Finance ASTAJOARA KATHIKUND DUMKA | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹27.7 L+₹2.5 L (9.73%)Admitted-Fee/PreQual/Technical/Finance GRAM BAKSURA BLOCK KANAHACHATTI DISTRICT CHATRA | CHATRA | JHARKHAND | 825103 | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹39.2 L
EMD Value
₹79,000
Closing Date
10 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
NREP DUMKA
Construction of PCC Road from Alubera PWD Road to Astajora in GP Astajora, Block Kathikund, Dumka.
2026_NREDU_120568_1
NREP/DMK/DMFT/19/26-27 gr 02
Open Tender
Civil Works
Works
90 days
Dumka
Construction of PCC Road from Alubera PWD Road to Astajora in GP Astajora, Block Kathikund, Dumka.
2 documents required · 2 mandatory
₹5,000
₹79,000
NREP DUMKA
18 Nov 2026
2 Nov 2026
12 Nov 2026
2 Nov 2026
10 Nov 2026
2 Nov 2026
2 Nov 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres.
Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m | 566.41 | M3 | 62.4 | ₹35,343.98 |
| 2 | Compacting Original ground supporting sub-grade
Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction. | 283.21 | M3 | 52.6 | ₹14,896.85 |
| 3 | By Mix in Place Method
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. | 283.21 | M3 | 1,437.6 | ₹4,07,142.7 |
| 4 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 377.8 | M3 | 5,316.1 | ₹20,08,422.58 |
| 5 | Construction of Subgrade and Earthen
Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 113.28 | M3 | 131.3 | ₹14,873.66 |
| 6 | Carriage of Materials
a) Cement -Lead 10S KM | 158.9 | MT | 502.6 | ₹79,863.14 |
| 7 | b) Sand -Lead(1 k+24S) KM | 445.66 | M3 | 506.2 | ₹2,25,593.09 |
| 8 | c) Stone Dust -Lead (1US+39S)KM | 190.31 | M3 | 729.4 | ₹1,38,812.11 |
| 9 | s) Stone Chips (1k+39S)KM | 497.09 | M3 | 729.4 | ₹3,62,577.45 |
| 10 | Add 18% for G.S.T. | 1 | Nos | 5,91,754.6 | ₹5,91,754.6 |
stage.html
html • 0.02 MB
finance_163177.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
Tendernotice_2.pdf
PDF • 6.11 MB
BOQ_163177.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .