Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.1 LAccepted-AOC | ₹40.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹40.2 L+₹4,466 (0.11%)Rejected-Finance | ₹40.2 L+₹4,466 (0.11%) | L2 | Rejected-Finance L2 |
| 3 | L2₹40.2 L+₹4,466 (0.11%)Rejected-Finance | ₹40.2 L+₹4,466 (0.11%) | L2 | Rejected-Finance L2 |
| 4 | L2₹40.2 L+₹4,466 (0.11%)Rejected-Finance | ₹40.2 L+₹4,466 (0.11%) | L2 | Rejected-Finance L2 |
| 5 | L2₹40.2 L+₹4,466 (0.11%)Rejected-Finance | ₹40.2 L+₹4,466 (0.11%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Babar Ali Khan L1 | M/S BORGOHAIN ENTERPRISE L2 | Uttam Bhowmick L2 | Santosh Gupta L2 | UMESH RAY L2 | Usha Construction L2 | JOY GURU AGENCY L2 | TABLU DEY L2 | PRADYUT JYOTI BORAH L2 | CHIRANJEEV DAS L2 | H. D. ENTERPRISE L2 | HRIDHAAN ENTERPRISE L2 | M/S MATA VAISHNO DEVI CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 204.75 | cum | 200 ₹40,950 | 100 ₹20,475 Lowest | 278.82 ₹57,088.4 | 302 ₹61,834.5 | 300 ₹61,425 | 300 ₹61,425 | 257 ₹52,620.75 | 257 ₹52,620.75 | 300 ₹61,425 | 285 ₹58,353.75 | 285 ₹58,353.75 | 257 ₹52,620.75 | 257 ₹52,620.75 |
| 2.00 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 292.5 | sqm | 920 ₹2,69,100 | 1,045.47 ₹3,05,799.98 | 590.2 ₹1,72,633.5 | 600 ₹1,75,500 | 600 ₹1,75,500 | 600 ₹1,75,500 | 546 ₹1,59,705 Lowest | 546 ₹1,59,705 Lowest | 600 ₹1,75,500 | 605 ₹1,76,962.5 | 605 ₹1,76,962.5 | 546 ₹1,59,705 Lowest | 546 ₹1,59,705 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 21.94 | cum | 6,600 ₹1,44,804 | 6,000 ₹1,31,640 Lowest | 6,642.06 ₹1,45,726.8 | 7,300 ₹1,60,162 | 7,300 ₹1,60,162 | 7,300 ₹1,60,162 | 6,003 ₹1,31,705.82 | 6,003 ₹1,31,705.82 | 7,300 ₹1,60,162 | 6,818 ₹1,49,586.92 | 6,818 ₹1,49,586.92 | 6,003 ₹1,31,705.82 | 6,003 ₹1,31,705.82 |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 141.64 | cum | 9,000 ₹12,74,760 | 6,500 ₹9,20,660 Lowest | 8,130.01 ₹11,51,534.62 | 7,800 ₹11,04,792 | 7,800 ₹11,04,792 | 7,800 ₹11,04,792 | 7,528 ₹10,66,265.92 | 7,528 ₹10,66,265.92 | 7,800 ₹11,04,792 | 8,250 ₹11,68,530 | 8,250 ₹11,68,530 | 7,528 ₹10,66,265.92 | 7,528 ₹10,66,265.92 |
| 7.00Centering and shuttering including strutting, propping etc. and removal of form for | ||||||||||||||||
| 7.10 | Foundations, footings, bases of columns, etc. for mass concrete | 67.86 | sqm | 400 ₹27,144 | 300 ₹20,358 | 299.33 ₹20,312.53 | 300 ₹20,358 | 300 ₹20,358 | 300 ₹20,358 | 276 ₹18,729.36 Lowest | 276 ₹18,729.36 Lowest | 300 ₹20,358 | 298 ₹20,222.28 | 298 ₹20,222.28 | 276 ₹18,729.36 Lowest | 276 ₹18,729.36 Lowest |
| 7.20 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 810.54 | sqm | 400 ₹3,24,216 | 350 ₹2,83,689 Lowest | 650.8 ₹5,27,499.43 | 675 ₹5,47,114.5 | 675 ₹5,47,114.5 | 675 ₹5,47,114.5 | 602 ₹4,87,945.08 | 602 ₹4,87,945.08 | 675 ₹5,47,114.5 | 668 ₹5,41,440.72 | 668 ₹5,41,440.72 | 602 ₹4,87,945.08 | 602 ₹4,87,945.08 |
| 7.30 | Suspended floors, roofs, landings, balconies and access platform | 226.44 | sqm | 400 ₹90,576 Lowest | 400 ₹90,576 Lowest | 745.08 ₹1,68,715.92 | 700 ₹1,58,508 | 700 ₹1,58,508 | 700 ₹1,58,508 | 699 ₹1,58,281.56 | 699 ₹1,58,281.56 | 700 ₹1,58,508 | 764 ₹1,73,000.16 | 764 ₹1,73,000.16 | 699 ₹1,58,281.56 | 699 ₹1,58,281.56 |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. :Thermo-Mechanically Treated bars of grade Fe-500D or more. | 20,328.39 | kg | 90 ₹18,29,555.1 | 110 ₹22,36,122.9 | 87.14 ₹17,71,415.9 | 88 ₹17,88,898.32 | 88 ₹17,88,898.32 | 88 ₹17,88,898.32 | 80 ₹16,26,271.2 Lowest | 80 ₹16,26,271.2 Lowest | 88 ₹17,88,898.32 | 85 ₹17,27,913.15 | 85 ₹17,27,913.15 | 80 ₹16,26,271.2 Lowest | 80 ₹16,26,271.2 Lowest |
| 9.00 | Providing and erecting informatory sign board…as directed | 1 | Nos | 13,828.9 ₹13,828.9 | 10,079.12 ₹10,079.12 | 4,472.9 ₹4,472.9 | 2,232.68 ₹2,232.68 Lowest | 2,642.18 ₹2,642.18 | 2,642.18 ₹2,642.18 | 3,17,875.31 ₹3,17,875.31 | 3,17,875.31 ₹3,17,875.31 | 2,642.18 ₹2,642.18 | 3,390.52 ₹3,390.52 | 3,390.52 ₹3,390.52 | 3,17,875.31 ₹3,17,875.31 | 3,17,875.31 ₹3,17,875.31 |
Tender Value
₹44.7 L
EMD Value
₹89,320
Closing Date
6 Sept 2025, 4:00 pmClosed
Executive Officer, Tinsukia Municipal Board
TINSUKIA MB
Construction of RCC Drain at Matri Nagar Main Road (Left)
2025_UDD_46493_1
TMB(Tech)15th FC/(Untied Grant)/1177(68A)
Open Tender
Civil Works
Works
Tinsukia
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
₹89,320
Yes
6 Nov 2025
14 Aug 2025
8 Sept 2025
16 Aug 2025
6 Sept 2025
16 Aug 2025
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .