EXECUTIVE ENGINEER (SDW) IV STP Kondli Delhi
EXECUTIVE ENGINEER (SDW) IV STP Kondli Delhi
Repairing Servicing Overhauling of MORRIS make CRANE installed at various blocks of 45 MGD KONDLI STP Ph IV
2021_DJB_212893_2
Press NIT-13 (2021-22)EE(SDW)-IV
Open Tender
Electrical Works
Works
45 days
EXECUTIVE ENGINEER (SDW) IV STP Kondli Delhi
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c No. 50448339804
Exempted
18 Jan 2022
16 Dec 2021
30 Dec 2021
16 Dec 2021
30 Dec 2021
16 Dec 2021
MORRIS Make 1T x 6M Lift EOT Mono rail (Curved) Crane. Installed at DIGESTER CONTROL BLOCK(UPER)Repairing of DSL with its GI Wire with Trolley wheels along with related accessories & motor heath checkup.
Repairing of panel box & replacement of contactor, relay & transformer with cabling & testing of all electrical equipment’s.
Supply of pendent 4+1 Ways, for UP-Down, left-right & emergency stop button with supporting wire & along with cable.
Repairing of integral pinion, Gear, shaft with proper cleaning & wash with oiling/Greasing of complete hoist.
Repairing of reel of the drum with proper wash & cleaning along with bracket, GM bush & keys. & Replacement of WireRope (24Mtrs).
Painting Charge on complete crane & Girder after rubbing of rustproof.
Complete welding turning alignment of main drum shaft with its bush & threaded with balancing the drum with counter gears.
Dismantling old items & Assembling new items of Existing EOT Crane with help of heavy labor with other require.
MORRIS Make 1T x 6M Lift EOT Mono rail Crane. Installed at BIOGAS ENGINE UTILITY ROOMRepairing of DSL with its GI Wire with Trolley wheels along with related accessories & motor heath checkup.
Repairing of panel box & replacement of contactor, relay & transformer with cabling & testing of all electrical equipment’s.
Supply of pendent 4+1 Ways, for UP-Down, left-right & Eemergency stop button with supporting wire & along with cable.
Repairing of integral pinion, Gear, shaft with proper cleaning & wash with oiling/Greasing of complete hoist.
Repairing of reel of the drum with proper wash & cleaning along with bracket, GM bush & keys and replacement of wire rope 24mtr
Painting Charge on complete crane & Girder after rubbing of rustproof.
Complete welding turning alignment of main drum shaft with its bush & threaded with balancing the drum with counter gears.
Dismantling old items & Assembling new items of Existing EOT Crane with help of heavy labor with other require.
MORRIS Make 2T x 6M Lift EOT Crane. Installed at SLUDGE BLANCING TANK & PUMP HOUSERepairing of DSL for CT & LT with its GI Wire with Trolley wheels along with related accessories & motor heath checkup.
Repairing of panel box & replacement of contactor, relay & transformer with cabling & testing of all electrical equipment’s.
Pendant with 7 Bottoms (6+1) UP Down Cross Travel & Long Travel, Emergency stop with required cable & its related accessories.
Repairing of integral pinion, Gear, shaft with proper cleaning & wash with oiling/Greasing of complete hoist.
Repairing of reel of the drum with proper wash & cleaning along with bracket, GM bush & keys. and replacement of wire rope 24mtr
Painting Charge on complete crane & Girder after rubbing of rustproof.
Complete welding turning alignment of main drum shaft with its bush & threaded with balancing the drum with counter gears.
Dismantling old items & Assembling new items of Existing EOT Crane with help of heavy labor with other require.
MORRIS Make 2T x 6M Lift EOT Crane. Installed at DIGESTER FEED & SUMP PUMP HOUSE Repairing of DSL for CT with its GI Wire with Trolley wheels along with related accessories & motor heath checkup.
Repairing of panel box & replacement of contactor, relay & transformer with cabling & testing of all electrical equipment’s.
Supply of Wire rope 4 falls & Dia 10mm construction 6x36.
Repairing of integral pinion, Gear, shaft with proper cleaning & wash with oiling/Greasing of complete hoist.
Repairing of reel of the drum with proper wash & cleaning along with bracket, GM bush & keys.
Pendant with 7 b080m0ms (6+I )UP Down Cross Travel & Long Travel, emergency stop with required cable & its related accessories
Painting Charge on complete crane & Girder after rubbing of rustproof.
Complete welding turning alignment of main drum shaft with its bush & threaded with balancing the drum with counter gears.
Dismantling old items & Assembling new items of Existing EOT Crane with help of heavy labor with other require.
MORRIS Make 2T x 6M Lift EOT Mono Rail (Curved).Installed at PRIMERY SLUDGE SUMP & PUMP HOUSERepairing of DSL for CT with itsGI Wire with Trolley wheels along with related accessories & motor heath checkup.
Repairing of panel box & replacement of contactor, relay & transformer with cabling & testing of all electrical equipment’s. Along with pendant wire rope.
Supply of Wire rope Guide for 4 falls (RH/LH) along with compound for wire rope.
Repairing of integral pinion, Gear, shaft with proper cleaning & wash with oiling/Greasing of complete hoist.
Supply of pendent 4+1 Ways, for UP-Down, left-right & Emergency stop button with supporting wire & along with cable.
Painting Charge on complete crane & Girder after rubbing of rustproof.
Complete welding turning alignment of main drum shaft with its bush & threaded with balancing the drum with counter gears.
Dismantling old items & Assembling new items of Existing EOT Crane with help of heavy labor with other require.
MORRIS Make 3T x 6M Lift EOT Mono rail Crane. Installed at BACK WASH SUMP & PUMP HOUSE.Repairing of DSL with its GI Wire with Trolley wheels along with related accessories along with CT wheel, Gear & motor heath checkup.
Repairing of panel box & replacement of contactor, relay & transformerwith cabling & testing of all electrical equipments.
Supply of Wire rope 4 falls & Dia 10mm construction 6x36.
Repairing of integral pinion, Gear, shaft with proper cleaning & wash with oiling/Greasing of complete hoist. Along with Gear & motor heath checkup of Hoist With the help of heavy labor support.
Supply of pendent 4+1 Ways, for UP-Down, left-right & emergency stop button with supporting wire & along withcable.
Painting Charge on complete crane & Girder after rubbing of rustproof.
Complete welding turning alignment of main drum shaft with its bush & threaded with balancing the drum with counter gears.
Dismantling old items & Assembling new items of Existing EOT Crane with help of heavy labor with other require.
MORRIS Make 3T x 6M Lift EOT Mono rail Crane. Installed at DILUTION WATER PUMP HOUSERepairing of DSL with itsGI Wire with Trolley wheels along with related accessories along with CT wheel, Gear & motor heath checkup.
Repairing of panel box & replacement of contactor, relay & transformer with cabling & testing of all electrical equipments.
Supply of Wire rope Guide for 4 falls (RH/LH) along with compound for wire rope.
Repairing of integral pinion, Gear, shaft with proper cleaning & wash with oiling/Greasing of complete hoist. Along with Gear & motor heath checkup of Hoist With the help of heavy labor support.
Supply of pendent 4+1 Ways, for UP-Down, left-right &emergency stop button with supporting wire & along with cable.
Painting Charge on complete crane & Girder after rubbing of rustproof.
Complete welding turning alignment of main drum shaft with its bush & threaded with balancing the drum with counter gears.
Dismantling old items & Assembling new items of Existing EOT Crane with help of heavy labor with other require.
MORRIS Make 3T x 6M Lift EOT.Installed at DIGESTER CONTROL BLOCK LOWER.Repairing& Replacement of DSL with its GI Wire with Trolley wheels along with related accessories along with CT wheel, Gear & motor heath checkup.
Repairing of panel box & replacement of contactor, relay & transformerwith cabling & testing of all electrical equipments.
Pendant with 7 Bottoms (6+1)UP Down Cross Travel & Long Travel, Emergency stop with required cable & its related accessories.
Repairing of integral pinion, Gear, shaft with proper cleaning & wash with oiling/Greasing of complete hoist. Along with Gear & motor heath checkup of Hoist With the help of heavy labor support.
Repairing of reel of the drum with proper wash & cleaning along with bracket, GM bush & keys.
Painting Charge on complete crane & Girder after rubbing of rustproof.
Complete welding turning alignment of main drum shaft with its bush & threaded with balancing the drum with counter gears.
Dismantling old items & Assembling new items of Existing EOT Crane with help of heavy labor with other require.
MORRIS Make 3T x 6M Lift EOT Installed at CENTRIFUGE PUMP Repairing of DSL with itsGI Wire with Trolley wheels along with related accessories along with CT wheel, Gear & motor heath checkup.
Repairing of panel box & replacement of contactor, relay & transformer with cabling & testing of all electrical equipments.
Supply of 1stage Gear & 2nd stage pinion of hoist.
Repairing of integral pinion, Gear, shaft with proper cleaning & wash with oiling/Greasing of complete hoist. Along with Gear & motor heath checkup of Hoist With the help of heavy labor support.
Pendant with 7 Bottoms (6+I)UP Down Cross Travel & Long Travel, Emergency stop with required cable & its related Accessories
Painting Charge on complete crane & Girder after rubbing of rustproof.
Complete welding turning alignment of main drum shaft with its bush & threaded with balancing the drum with counter gears.
Dismantling old items & Assembling new items of Existing EOT Crane with help of heavy labor with other require.
MORRIS Make 5T x 8M Lift EOT Crane. Installed at AREATION BLOWER HOUSRRepairing of DSL with its GI Wire with Trolley wheels along with related accessories along with CT wheel, Gear & motor heath checkup.
Repairing of panel box & replacement of contactor, relay & transformer with cabling & testing of all electrical equipment’s.
Supply of Limit switch, CT brake & (6+1) Ways of pendant with supporting wire.
Repairing of integral pinion, Gear, shaft with proper cleaning & wash with oiling/Greasing of complete hoist. Along with Gear & motor heath checkup of Hoist With the help of heavy labor support.
Replacement of Wire Rope
Painting Charge on complete crane & Girder after rubbing of rustproof.
Complete welding turning alignment of main drum shaft with its bush & threaded with balancing the drum with counter gears.
Dismantling old items & Assembling new items of Existing EOT Crane with help of heavy labor with other require.
H K Solutions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .