| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-Finance 46C 1P PONGHAT PUL DEFENCE INCLAVE COLONY BAMRAULI PRAYAGRAJ UTTAR PRADESH 211012 | PRAYAGRAJ | UTTAR PRADESH | 211012 | L1 | Accepted-Finance ok | |
| 2 | L2₹7.0 L+₹9,522.60 (1.37%)Accepted-Finance 01 AGNI AUTOMATION AND SECURITY 01 KUNDAN BHAWAN SHIVAM VIHAR COLONY OPP KIET ENGG COLLEGE MURADNAGAR GHAZIABAD 201206 U P INDIA MURADNAGAR | GHAZIABAD | UTTAR PRADESH | 201206 | L2 | Accepted-Finance ok | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected due to non submission of FDR EMD | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected due to non submission of FDR EMD |
Tender Value
Refer Docs
EMD Value
₹14,200
Closing Date
21 Feb 2024, 2:30 pmClosed
EEEnMHPI
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Renovation of different Electrical installations at Filter House HP1
2024_DJB_253912_3
NIT18
Open Tender
Miscellaneous Works
Works
30 days
Haiderpur WTP
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹14,200
27 Feb 2024
14 Feb 2024
21 Feb 2024
14 Feb 2024
21 Feb 2024
14 Feb 2024
Improvement of 75 HP motor by rewinding of stator with following works:-Cutting the old rotor burnt winding strips .P/Fixing of new “F” class insulation, rewinding of rotor winding with new electrolyte copper strips with fibre glass tape and fixing the same, making the connection. P/Fixing new copper sockets both sides, brazing the sockets with silver rod, Pocketing the sockets with F class insulation, Replacement of 3 Nos. Fibre glass Teflon copper flexible leads. Binding the rotor winding both sides with HT steel wire & F class insulation. Varnishing the stator winding with Dr. Beck varnish and baking the same.
Improvement of 75 HP motor by rewinding of rotor with following works:-Cutting the old burnt winding. P/Fixing of new “F” class insulation. Rewinding of stator winding with new electrolyte super enameled copper wire. Making the connection, P/Fixing new copper sockets both sides, brazing the same with silver rod. Pocketing the connection with F class insulation. Replacement of stator winding fibre glass Teflon copper flexible leads. Varnishing the rotor winding with Dr. Beck varnish and baking the same.
Dynamic balancing of Rotor of above motor.
Repairing of rotor shaft DE and NDE side , remettaling the shaft turning and polishing the same as per bearing inner dia.
Replacement of both sides bearing, make- SKF/FAG 6313.C3, 6314.C3
Assembling the complete motor with both side cartage
Improvement of 30 HP motor by rewinding of stator with following works:- Repairing/ rewinding of 30 HP motor of various make at Filter House, HP-I. with following works:- Dismantling of motor after removing of all connection, cutting of burnt coil wire without damaging the core, cleaning of slots with CRC and putting of insulation material, No men sheet, Fiber glass sleeve, tapes etc, rewinding of stator with F class insulation, replacement of winding leads, varnishing and baking the same with Dr. Beck Varnish as per requirement.
Repairing of bearing sheet, turning and polishing the same as per bearing outer dia.(both sides)
Repairing of rotor shaft , remettaling the turning and polishing the same with bearing inner dia. (both sides)
Replacement of bearings on DE and NDE side. 6310-ZZ, 6210-ZZ
Assembling of complete motor. (3 Nos.)
Renovation of 3HP motor by rewinding of motor with following works:- Dismantling the motor with the help of tools and tackles carefully.
Cutting of burnt coil wire without damaging the core, cleaning of slots with CRC and putting of insulation material, No men sheet, Fiber glass sleeve, tapes etc, rewinding of stator with F class insulation, replacement of winding leads, varnishing and baking the same with Dr. Beck Varnish as per requirement.
Replacement of bearings on DE and NDE side. 6208ZZ, 6308ZZ
Repairing of bearing sheet, turning and polishing the same as per bearing outer dia.(both sides)
Assembling of complete motor. (5 Nos.)
Renovation of existing submersible pump installed at Varun Niketan Staff Qtrs with following works, Dismantling and taken out the burnt submersible pump with the help of chain pulley block by manual labour etc at site.
Rewinding of 5 HP submersible pump set.
Replacement of coupler between pump and motor.
Replacement of steel wire rope for safety purpose
Replacement of rusted nut bolts and packing as per requirement.
Testing and commissioning the submersible pumpset including lower fixing and making connections as per site requirement.
Dismantling of existing starter control panels of 30 HP motors including cable connection etc at site.
Fabrication of new starter panel frame and grouting the same as per requirement of site.
Fixing the new starters in the starter panel frame with the help of nut bolts etc. at site
Making the cable connection in the starter panel to motor with the help of thimbling cabling as per requirement of site.
Testing the same on load as per satisfaction of Engineer-In - Charge.
AGNI AUTOMATION AND SECURITY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .