Loading…
Loading…
Tender Value
₹23.6 L
EMD Value
₹47,500
Closing Date
17 Oct 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
RURAL DEVELOPMENT SPECIAL DIVISION DUMKA
Construction of PCC road From House of Rajendra Sha to Puliya in Village Gandark Panchayat Thadihat Block Ramgarh Distt Dumka.
2026_RDSPL_119749_1
RDSD/DMK/UNTIED/34/26-27_Gr08
Open Tender
Civil Works
Percentage
60 days
Dumka
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹47,500
10 Oct 2026
10 Oct 2026
22 Oct 2026
10 Oct 2026
17 Oct 2026
10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 326.29 | M3 | 151.82 | ₹49,537.35 |
| 2 | Construction of Granular Sub Base using crusher run, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at OMC, and coompacting with vibratory roller to achieve the desired density , complete as per clause 401 Rate per cum for grading 1-Material | 222.8 | M3 | 1,437.6 | ₹3,20,300.87 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 222.8 | M3 | 4,961.73 | ₹11,05,485.85 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 146.1 | M2 | 194.5 | ₹28,416.45 |
| 5 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. | 87.66 | M3 | 131.3 | ₹11,509.76 |
| 6 | CARRIAGE OF MATERIAL
Cement = 10km | 91.82 | MT | 502.6 | ₹46,147.14 |
| 7 | Sand = 15km | 95.81 | M3 | 338.2 | ₹32,401.28 |
| 8 | Stone Chips = 50 km | 264.02 | M3 | 859 | ₹2,26,794.01 |
| 9 | Stone Dust = 60 km | 89.12 | M3 | 1,007.8 | ₹89,816.14 |
| 10 | Stone Metal = 60 km | 61.27 | M3 | 1,085.92 | ₹66,535.06 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Eight_s.pdf
Tender Documents • 0.68 MB
BOQ_162029.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .