Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 78 GREATER KAILASH KUNJWANI DISTRICT JAMMU | Admitted-Finance |
Tender Value
₹12.5 L
Closing Date
9 Sept 2021, 4:00 pmClosed
ER. AGINDER BAKSHI
O/o EXECUTIVE ENGINEER, CIVIL DIVISION, BARI BARAHMANA
Construction of 8 No. RCC Culverts for CROSS Drainage Road No. F18, F19, R1, R2, L3, L4 AND Main spine road (phase - II) on backside of Dabur India Ltd. at Industrial Complex Bari Brahmana. (2nd Call)
2021_SIDCO_137127_1
E- NIT No 11 of 2021-22 Dt 25.08.2021
Open Tender
Civil Works
Item Rate
40 days
BARI BARHMNA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
EXECUTIVE ENGINEER, CONSTRUCTION DIVISION
Yes
15 Sept 2021
31 Aug 2021
11 Sept 2021
2 Sept 2021
9 Sept 2021
2 Sept 2021
Amount
Earthwork in bulk excavation by mechanical means (by hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 mtr and lift upto 1.5 mtr, as directed by Engineer-in-charge: all kinds of soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering (all works up to plinth level) in 1:4:8(1 cement:4 coarse sand 8 graded stone aggregate 40mm nominal size) (Including all carriages)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering (all works up to plinth level) in 1:3:6(1 cement: 3 coarse sand 6 graded stone aggregate 20 mm nominal size) (Including all carriages)
Providing and laying in position specified grade of reinforced cement cocreate1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size)including curing but excluding the cost of centering and shuttering, finishing and reinforcement. All works upto plinth level. (Including all carriages)
Reinforced cement concrete work in walls (any thickness) including attached pilaster, buttresses, plinth & string courses, fillets, columns, pillars, piers, abutments, posts andstuts, etc. upto floor five level excluding cost of centering shuttering, finishing & reinforcement 1:2:4 ( 1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) in place of advertised item viz: Cement concrete 1:2:4. (Including all carriages)
Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-mechanically treated bars of grade Fe-500D or more. (Including all carriages)
12mm thick cement plaster of mix 1:4 (1 cement: 4 coarse sand) (Including all carriages)
Centering and shuttering including strutting, propping etc and removal of form for foundations, footings, bases of columns etc.
a) Suspended floor, roof landings etc
b) Edges of slab, breaks in floor etc
c) Walls (any thickness)
Removal of Mulba building rubbish from designated sites and its disposal as per directions of Engineer Incharge all inclusive. (Including all carriages)
Cement concrete flooring 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete: 40 mm thick with 20 mm nominal size stone aggregate. (Including all carriages)
M/s Shashi Sharma
Mohd Zulfkar Ali
Rattan Chand
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .