| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-AOC 5037 5038 URBAN ESTATE PH 1 PATIALA 147002 PUNJAB | PATIALA | PATIALA | PUNJAB | 147002 | L1 | Accepted-AOC L1 | |
| 2 | L2₹34.2 L+₹3.4 L (11.2%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹34.9 L+₹4.1 L (13.4%)Rejected-Finance 195 MAHESH NAGAR AMBALA CANTT 133001 | AMBALA | HARYANA | 133001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹35.1 L+₹4.3 L (13.8%)Rejected-Finance 303 GHS 888 SECTOR 20 PANCHKULA 134116 HARYANA | PANCHKULA | PANCHKULA | HARYANA | 134116 | L4 | Rejected-Finance L4 | |
| 5 | L5₹40.9 L+₹10.1 L (32.7%)Rejected-Finance H NO 597 SEONA ROAD RANJIT NAGAR PATIALA PB 147001 | PATIALA | PATIALA | PUNJAB | 147001 | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Sant Construction Co. L1 | Raman Electric Trading Co L3 | SWAMI ENGINEERS L7 | R D Bansal L4 | Jawandha Enterprises L5 | Gurcharan Singh Enterprises L2 | bharat contrectors L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5m in depth for laying of pipe, cable, foundation of electric pole etc and getting out in soft/loose soil complete all as specified and as directed. | 122 | Cum | 80 ₹9,760 | 90 ₹10,980 | 1,000 ₹1,22,000 | 70 ₹8,540 Lowest | 100 ₹12,200 | 110 ₹13,420 | 100 ₹12,200 |
| 2.00 | Returning, filling in including spreading leveling watering and well ramming in layers not exc. 25 cm thick complete all as specified and as directed. | 87 | Cum | 30 ₹2,610 | 20 ₹1,740 | 1,000 ₹87,000 | 10 ₹870 Lowest | 50 ₹4,350 | 35 ₹3,045 | 30 ₹2,610 |
| 3.00 | Removing surplus soil to a distance not exc. 50 M and depositing where directed at a level not exceeding 1.5 Mtr above the starting point complete all as specified and directed. | 35 | Cum | 30 ₹1,050 | 20 ₹700 Lowest | 1,000 ₹35,000 | 20 ₹700 Lowest | 50 ₹1,750 | 40 ₹1,400 | 30 ₹1,050 |
| 4.00 | Material and labour for sand cushioning (dry sand) to underground cable for cable protection 23 cm thick in two layers,8 cm thick before laying of cables and 15 cm thick after laying the cable complete all as specified and as directed. Note:- Punned thickness of sand shall be measured for payment purposes | 31 | Cum | 150 ₹4,650 Lowest | 350 ₹10,850 | 1,000 ₹31,000 | 250 ₹7,750 | 250 ₹7,750 | 313 ₹9,703 | 400 ₹12,400 |
| 5.00 | Supply and laying in repair Un-reinforced precast concrete cable cover class HV, type 1, flat, size 300 mm X 180mm x 40mm complete all as specified and as directed. | 777 | Each | 12 ₹9,324 Lowest | 18 ₹13,986 | 1,000 ₹7,77,000 | 12 ₹9,324 Lowest | 20 ₹15,540 | 19 ₹14,763 | 18 ₹13,986 |
| 6.00 | Supplying and laying in repair un-reinforced precast concrete cable cover , class LV, Type 1, flat of size 250 mm x 150 mm x 40 mm for cable protection, confirming to IS : 5820-1970 and having minimum average load breaking strength 200 Kg/Sqcm complete all as specified.and as directed.
Note : For serial item no 5&6. :-The sample of precast concrete cable cover will be got tested from govt. approved lab as decided by GE and cost of testing is deemed to be included in unit rate of this item | 1,633 | Each | 12 ₹19,596 | 15 ₹24,495 | 1,000 ₹16,33,000 | 10 ₹16,330 Lowest | 15 ₹24,495 | 13 ₹21,229 | 18 ₹29,394 |
| 7.00 | M aterial and labour for MS tube light grade galvanised of size 80mm bore with all fittings and laid in trenches / under roads/ under floors/ fixing on/along poles and walls with clamps complete all as specified and as directed. | 15 | RM | 350 ₹5,250 | 460 ₹6,900 | 1,000 ₹15,000 | 300 ₹4,500 | 500 ₹7,500 | 513 ₹7,695 | 190 ₹2,850 Lowest |
| 8.00 | All as per item No 7 here-in-before but pipe of size 100 mm bore. | 15 | RM | 450 ₹6,750 | 500 ₹7,500 | 1,000 ₹15,000 | 300 ₹4,500 | 700 ₹10,500 | 613 ₹9,195 | 240 ₹3,600 Lowest |
| 9.00 | Supply, laying, fixing, jointing and testing XLPE Insulated screnned, PVC bedded, galvanised steel strip or wire armoured, electric power cable (heavy duty) with aluminium conductor,11000 volts Earthed,grade cross section area 120 Sqmm x 3 core, laid in trenches, under floor/roads passing through pipes / ducts / or fixed to walls etc including taking out old unserviceable cable of any size and make complete all as specified and directed. Note:- Excavation and earth work, sand cushnioning, PCC cover shall be measured and paid separetaly under respective items of this schedule. | 150 | RM | 1,100 ₹1,65,000 | 1,240 ₹1,86,000 | 1,000 ₹1,50,000 | 990 ₹1,48,500 Lowest | 1,050 ₹1,57,500 | 1,113 ₹1,66,950 | 1,100 ₹1,65,000 |
| 10.00 | All as per item No. 9 above but of size 95 sqmm X 3 core | 50 | RM | 850 ₹42,500 Lowest | 1,000 ₹50,000 | 1,000 ₹50,000 | 890 ₹44,500 | 900 ₹45,000 | 913 ₹45,650 | 900 ₹45,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
1 Sept 2025, 6:00 pmClosed
CWE PATIALA
HQ COMMANDER WORKS ENGINEER BLDG No 26 NEW LALBAGH PATIALA 147001 Contact 01712200082
REPAIR/MAINTENANCE OF TRANSFORMER AND CONNECTED ACCESSORIES FOR HT/LT NETWORK IN NEW AND OLD CANTT UNDER GE(N) PATIALA
2025_MES_724435_1
CWE/PAT/T-22/2025-26
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE NORTH PATIALA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE NORTH PATIALA
₹90,000
21 Oct 2025
4 Aug 2025
3 Sept 2025
4 Aug 2025
1 Sept 2025
25 Aug 2025
4 Aug 2025 - 20 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .