Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | L1 | Accepted-AOC Lowest Tenderer L1 | |
| 2 | L2₹8.3 L+₹16,042.48 (1.96%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SIVASUBRAMANIAN RAMASAMY L1 | B SARAVANAKUMAR L2 |
|---|---|---|---|---|---|
| 1.00 | Labour and hire charges for providing wooden gallery in 2 levels at a height of 0.60m and 0.75m from the ground level using MS frames supporting the stage and the floor base of gallery covered with 19mm thick water proof plywood supported by necessary cross bracings using c.w reepers of required size with necessary required screws and nails including finishing neatly etc., complete and as directed by the departmental officers. The rate includes cost of hire charges for materials, loading, unloading, conveyance charges, labour charges and fixing charges etc., The same has to be removed after the function is over. | 419 | M² | 864 ₹3,62,016 Lowest | 880.88 ₹3,69,088.72 |
| 2.00 | Labour and hire charges for Zinc sheeted roofing by using M.S.pipe steel trusses and MS Angle, purlins of prefabricated members which are ready to use to be joined with necessary bolts and nuts and roof with rain proof and fire proof zinc sheet pandal at a height of 24 feet from the existing ground level and stability of the structure is ensured by thoroughly checking the members against any possibility of sliding, collapsing under normal climatic condition and should be water proof etc., complete and as directed by the departmental officers. The rate includes hire charges of materials, loading, unloading, conveyance charges, labour charges and fixing etc., The same has to be removed after the function is over. | 419 | M² | 769 ₹3,22,211 Lowest | 784.16 ₹3,28,563.04 |
| 3.00 | Labour and hire charges for decorating the elevation of the gallery using colour frills and colour clothes as border etc, complete and as directed by the deptl. officers. The rate includes loading, unloading, conveyance, labour charges for fixing, scaffolding charges etc., The same has to be removed after the function is over. | 28 | M² | 167 ₹4,676 Lowest | 169.52 ₹4,746.56 |
| 4.00 | Labour and hire charges for providing steps using MS frames having tread of 0.30m and rise of 0.15 m to a height of 0.90m from ground level provided with necessary cross bracings etc., complete and as directed by the departmental officers. The rate includes cost of materials, loading, unloading, conveyance charges, labour charges for fixing and all other incidential charges etc., The same has to be removed after the function is over. | 2 | Nos | 2,524 ₹5,048 Lowest | 2,574 ₹5,148 |
| 290.00 | GST at 18% | 1 | Nos | 1,24,911.18 ₹1,24,911.18 Lowest | 1,27,358.34 ₹1,27,358.34 |
Tender Value
Refer Docs
EMD Value
₹8,110
Closing Date
15 Jul 2025, 3:00 pmClosed
Executive Engineer,PWD.,
Office of the Executive Engineer,PWD., Buildings Construction and Maintenance North Presidency Division, Chepauk, Chennai - 5
Providing wooden gallery (CD) with Pandal arrangements in front of the Rampart and wooden steps etc., in connection with the Independence Day Celebration to be held on 15.08.2025 at Secretariat, F.S.G., Chennai-09
2025_PWD_574935_1
TNPWD/01-03/DB/2025-2026
Open Tender
Civil Works
Lump-sum
15 days
Secretariat
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,110
29 Aug 2025
27 Jun 2025
15 Jul 2025
27 Jun 2025
15 Jul 2025
27 Jun 2025
Amount
Labour and hire charges for providing wooden gallery in 2 levels at a height of 0.60m and 0.75m from the ground level using MS frames supporting the stage and the floor base of gallery covered with 19mm thick water proof plywood supported by necessary cross bracings using c.w reepers of required size with necessary required screws and nails including finishing neatly etc., complete and as directed by the departmental officers. The rate includes cost of hire charges for materials, loading, unloading, conveyance charges, labour charges and fixing charges etc., The same has to be removed after the function is over.
Labour and hire charges for Zinc sheeted roofing by using M.S.pipe steel trusses and MS Angle, purlins of prefabricated members which are ready to use to be joined with necessary bolts and nuts and roof with rain proof and fire proof zinc sheet pandal at a height of 24 feet from the existing ground level and stability of the structure is ensured by thoroughly checking the members against any possibility of sliding, collapsing under normal climatic condition and should be water proof etc., complete and as directed by the departmental officers. The rate includes hire charges of materials, loading, unloading, conveyance charges, labour charges and fixing etc., The same has to be removed after the function is over.
Labour and hire charges for decorating the elevation of the gallery using colour frills and colour clothes as border etc, complete and as directed by the deptl. officers. The rate includes loading, unloading, conveyance, labour charges for fixing, scaffolding charges etc., The same has to be removed after the function is over.
Labour and hire charges for providing steps using MS frames having tread of 0.30m and rise of 0.15 m to a height of 0.90m from ground level provided with necessary cross bracings etc., complete and as directed by the departmental officers. The rate includes cost of materials, loading, unloading, conveyance charges, labour charges for fixing and all other incidential charges etc., The same has to be removed after the function is over.
GST at 18%
B SARAVANAKUMAR (BID ID -1401904)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_686955.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .