Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.4 LAccepted-Finance NO 16 11 ANBAZHAGAN NAGAR MAIN ROAD MINJUR 601203 | THIRUVALLUR | TAMIL NADU | 601203 | 1 | Accepted-Finance l1 | |
| 2 | 2₹12.9 L+₹2.5 L (23.9%)Accepted-Finance | 2 | Accepted-Finance l2 |
Tender Value
Refer Docs
EMD Value
₹18,700
Closing Date
22 Jul 2024, 2:00 pmClosed
SE MI NCTPS II
O o Superintending Engineer M I NCTPS II CHENNAI 120
NCTPS II 2 X 600 MW BM Unit I Annual overhauling of Boiler Drum
2024_EB_460861_1
SE MI NCTPS II O M 78 24 25
Open Tender
Miscellaneous Works
Works
40 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,700
Yes
16 Nov 2024
6 Jul 2024
23 Jul 2024
6 Jul 2024
22 Jul 2024
6 Jul 2024
Amount
Overhauling of PRDS & Soot blower safety valves (6 Nos) : This work consists of dismantling, cleaning, inspection, rectification of any defects, lapping the seat and disc, assembling without disturbing its internal settings and assisting during the floating.
Overhauling of DRUM & SH,RH safety valves (19 Nos ): This work involves dismantling, inspection, rectification of any defects, cleaning lapping the seat and disc, providing hydro test plug and assembling without disturbing its initial settings of safety valves and assisting during pressure setting safety valves & reconditioning of adjusting ring pin. Charges inclusive of labours, T&P’s and consumables, such as lapping past, emery sheet, gada cloth etc
Overhauling of Electromatic relief valves (ERV) : A) Main valve : This work involves dismantling, inspection, rectification of any defects, cleaning lapping the seat and disc, providing hydro test plug and assembling without disturbing its initial settings of safety valves and assisting during pressure setting safety valves & reconditioning of adjusting ring pin. Charges inclusive of labours, T&P’s and consumables, such as lapping past, emery sheet, gada cloth etc
B) Pilot valve : This work involves dismantling, inspection, rectification of any defects, cleaning lapping the seat and disc, providing hydro test plug and assembling without disturbing its initial settings of safety valves and assisting during pressure setting safety valves & reconditioning of adjusting ring pin. Charges inclusive of labours, T&P’s and consumables, such as lapping past, emery sheet, gada cloth etc
Removal of Jammed safety valve seating disc with stem from disc holder: This works involves removal of jammed seating disc from stem by gas cutting, re threading of stem and fixing new seating disc, blue matching of inner cavity with shaft, nose tips, blue matching of new disc with valve lapping disc, etc.,
Overhauling of drum and Lower drum: This work involves Opening of boiler drum and lower drum manhole door and its internals inspection, welding of the cracks in the separator chamber with IBR welder. Flushing of phosphate dosing and blow down and flushing the drum internals with service air and closing of man hole doors with new gaskets etc. charges inclusive of labours, T&P’s and consumables.
Inspection of Lower drum orifice: This work involves charges for tightness checking and fixing of orifice in the water wall bottom entry by entering into the Ring header. charges inclusive of labours, T&P’s and consumables.
Online Pressure setting of safety valve involves providing working platform and fixing of special fixture kit on the safety valve stem and applying extra pressure more and above the steam pressure available on the boiler with the help of calibrated controlled mechanical tools.:
Checking of weld cracks in separation chamber and welding the cracks with IBR welder.
Dismantling the turbo separator assembly by releasing the eye bolts, hexagonal screw of size M12 x 35 fixed in claw and nuts for removing the turbo separator completely outside the drum for cleaning and refixing in its position.
Removal of fallen/dislocated orifice plate and Re-erection of new/fallen orifice plate inside the Boiler water wall Ring Headers. Removal of fallen/dislocated orifice plate and Re-erection of new/fallen orifice plate of individual water wall tubes in place of missed/ fallen / dislocated, defective and damaged orifice plates by proper orientation and position by coupling with new/old marman type coupling and fasteners to arrest the orifice plate intact in the position by aligning with orifice fixture holes in the front, rear, left and right side water wall bottom ring header inclusive of labours, T&P’s and consumables.
ferrofabs (BID ID -1088605)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .