| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance | ₹1.0 Cr | L1 | Accepted-Finance Lowest Rate |
| 2 | L2₹1.1 Cr+₹1.5 L (1.41%)Rejected-Finance | ₹1.1 Cr+₹1.5 L (1.41%) | L2 | Rejected-Finance Higer Rate |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
20 Jan 2021, 11:00 amClosed
Superintending Engineer
Superintending Engineer, U.P.State construction and Infrastructure Development Corporation Ltd., Lekhraj Market-1st, IIIrd floor Indira Nagar Lucknow.
Construction of Auditorium Building of U.P. Sanskrit Sansthan New Hydrabad,Lucknow.(Balance work)
2021_SCIDC_544526_1
1001/S.E/LKO-Regi/ E-PROC/20-21
Open Tender
Civil Works
Item Rate
90 days
New Hadrabad
Construction of Auditorium Building of U.P. Sanskrit Sansthan New Hydrabad,Lucknow.(Balance work)
2 documents required · 2 mandatory
₹2,600
UPSCIDCo.ltd.
₹2.1 L
13.01.2021
22 Jan 2021
8 Jan 2021
20 Jan 2021
8 Jan 2021
20 Jan 2021
8 Jan 2021
13 Jan 2021
Amount
Labour Work
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using fly ash and cement content as per approved design mix, and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate / retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge.All works up to Plinth level.-'In Column S.F.
in Lintel S.F.
Beam S.F.
in Slab S.F.
Suspended floors, roofs, landings, balconies and access platform
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Edges of slabs and breaks in floors and walls Under 20 cm wide
Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc., including cost of de-shuttering and decentering at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured). Suspended floors, roofs, landing, beams and balconies (Plan area to be measured)
Providing and laying water proofing treatment to vertical and horizontal surfaces of depressed portions of W.C., kitchen and the like consisting of:Ist course of applying cement slurry @ 4.4 kg/sqm mixed with water proofing compound conforming to IS 2645 in recommended proportions including rounding off junction of vertical and horizontal surface.IInd course of 20 mm cement plaster 1:3 (1 cement : 3 coarse sand) mixed with water proofing compound in recommended proportion including rounding off junction of vertical and horizontal surface IIIrd course of applying blown or residual bitumen applied hot at 1.7 kg. per sqm of area.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. (labour only)
Materials
Course sand (Hameerpur)
Cement PPC (packed in 50 kg bag) make- Birla,Prism, ACC, Mycem,J.P.
TMT steel MS round bar confirming FE-500 I.S.I.
M/S U K Engineers
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .