| 1 | L1₹8.8 LAccepted-AOC KAMBAINALLUR | KAMBAINALLUR | DHARMAPURI | TAMIL NADU | ₹8.8 L | L1 | Accepted-AOC QUOTED LESS THEN ESTIMATE AMOUNT |
| 2 | L2₹9.0 L+₹19,948.76 (2.26%)Rejected-AOC | ₹9.0 L+₹19,948.76 (2.26%) | L2 | Rejected-AOC QUOTED GREATER THEN L1 |
| 3 | L3₹9.2 L+₹36,776.90 (4.17%)Rejected-AOC | ₹9.2 L+₹36,776.90 (4.17%) | L3 | Rejected-AOC QUOTED GREATER THEN L1 |
| 4 | L4₹9.5 L+₹70,531.73 (8.00%)Rejected-AOC | ₹9.5 L+₹70,531.73 (8.00%) | L4 | Rejected-AOC QUOTED GREATER THEN L1 |
| Sl No | Description | Qty | Unit | R PANNEERSELVAM L1 | S.Meena Contractor L2 | P N Bharathi L4 | S DHANANJEYAN CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|
| 1.00Improvement to Burial Ground at Erukkompatti ( Cremination shed, Compound wall 40m, CC Pavement 40.00m ) H/O Kolagampattii | |||||||
| 2.00I. Waiting Shed | |||||||
| 3.00 | 1. Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth | 10.8 | M | 200 ₹2,160 Lowest | 205.48 ₹2,219.18 | 247.95 ₹2,677.86 | 250 ₹2,700 |
| 4.00 | 2. Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 4.22 | M | 5,000 ₹21,100 | 4,475.72 ₹18,887.54 Lowest | 5,107.63 ₹21,554.2 | 4,500 ₹18,990 |
| 5.00 | 3. Cement mortar 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 1.1 | M | 6,000 ₹6,600 | 5,578.15 ₹6,135.97 | 6,419.69 ₹7,061.66 | 5,000 ₹5,500 Lowest |
| 6.00 | 4. Brick work in CM 1:5 mix using New Country Bricks including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 9.16 | M | 6,500 ₹59,540 | 4,810.75 ₹44,066.47 Lowest | 5,776 ₹52,908.16 | 5,000 ₹45,800 |
| 7.00 | 5. CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 5 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete | 12.17 | M | 300 ₹3,651 Lowest | 426.5 ₹5,190.51 | 514.65 ₹6,263.29 | 400 ₹4,868 |
| 8.00 | 6. CENTERING ABOVE GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 6 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 57.28 | M | 800 ₹45,824 | 853 ₹48,859.84 | 1,029.3 ₹58,958.3 | 550 ₹31,504 Lowest |
| 9.00 | 7. Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works | 0.51 | Mt | 75,000 ₹38,250 | 71,685.29 ₹36,559.5 | 86,388.5 ₹44,058.14 | 70,000 ₹35,700 Lowest |
| 10.00 | 8. Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance 8 of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 8.75 | M | 7,000 ₹61,250 Lowest | 7,535.37 ₹65,934.49 | 8,769.42 ₹76,732.43 | 7,000 ₹61,250 Lowest |
Tender Value
₹10.3 L
EMD Value
₹11,000
Closing Date
24 Oct 2025, 3:00 pmClosed
BDO VP Harur
BDO VP Harur
Improvement to Burial Ground at Erukkompatti ( Cremination shed, Compound wall 40m, CC Pavement 40.00m ) H/O Kolagampatti
2025_RDTN_616318_1
TN04-04-36 / AGAMT - II 2025-26 - Kolagampatti - Harur Block P36
Open Tender
Civil Works
Works
Kolagampatti
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,000
Yes
7 Nov 2025
23 Oct 2025
24 Oct 2025
23 Oct 2025
24 Oct 2025
23 Oct 2025
Amount
Improvement to Burial Ground at Erukkompatti ( Cremination shed, Compound wall 40m, CC Pavement 40.00m ) H/O Kolagampattii
I. Waiting Shed
1. Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth
2. Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
3. Cement mortar 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
4. Brick work in CM 1:5 mix using New Country Bricks including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
5. CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 5 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete
6. CENTERING ABOVE GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 6 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
7. Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
8. Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance 8 of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
9. Plastering in CM 1:3 mix using 10mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
10. Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
11. Painting Two Coat of New Plastered wall surface with ready mixed plastic emulsion including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
II. Construction of Compound wall
1. Earthwork Excavation in Hard Soil-Earthwork excavating and depositing with in initial lead of 10m and lift of 2m
2. Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
3. Brick work in CM 1:5 mix using New Country Bricks including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
4. CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 4 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
5. CENTERING ABOVE GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
6. Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
7. Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
8. Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
9. Painting Two Coat of New Plastered wall surface with ready mixed plastic emulsion including 9 cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
III. Providing CC Pavement
1. Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m
2. Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
3. CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel 3 angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
4. Cement concrete 1:3:6 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
5. Cement concrete 1:2:4 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
6. Provision For Bitumen Pad
IV) Providing New borewell With Hand Pumpset
1. Geophysical survey charges
2. Drilling of 150 mm dia Borewell in the hard rock area to the required depth. A)Over Burden Soil
b) Hard Rock Area Upto 150m
3. Supply and erection of 165mm dia OD PVC 6KSC Casing Pipe in the Borewell
4. India Mark-ll Hand pumpset as per UNICEF Specification supply and delivery of 32mm dia GI pippes 3.00 metrewith coupling
5. Supply, delivery & fixing of GI Pipes and Specials i) Hand pumpset Erection charges
ii) Construction of Handpump Platform as per type design including soakpit
iii) Transport charges of Hand pumpset and GI pipes to site.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.Meena Contractor (BID ID -1494807)
S DHANANJEYAN CONTRACTOR (BID ID -1495364)
P N Bharathi (BID ID -1495420)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
Techbid36.pdf
Tender Documents • 0.57 MB
Pricebid36.pdf
Tender Documents • 0.47 MB
BOQ_736463.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .