| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹23.9 L+₹1.2 L (5.26%)Accepted-Finance | ₹23.9 L+₹1.2 L (5.26%) | L2 | Accepted-Finance Successful and work has been awarded |
| 2 | L1₹22.7 LRejected-Finance PHULBANI ODISHA | KANDHAMAL | ODISHA | 762001 | ₹22.7 L | L1 | Rejected-Finance Unsuccessful |
| 3 | L2₹23.9 L+₹1.2 L (5.26%)Rejected-Finance AT SATANALA P O BERUANBADI PS KODALA DIST GANJAM ODISHA PIN 761032 | GANJAM | ODISHA | 761032 | ₹23.9 L+₹1.2 L (5.26%) | L2 | Rejected-Finance Unsuccessful |
| 4 | L2₹23.9 L+₹1.2 L (5.26%)Rejected-Finance AT INFRONT OF BUS STAND WARD NO 7 DIST MALKANGIRI | MALKANGIRI | MALKANGIRI | ODISHA | ₹23.9 L+₹1.2 L (5.26%) | L2 | Rejected-Finance Unsuccessful |
| 5 | L2₹23.9 L+₹1.2 L (5.26%)Rejected-Finance | ₹23.9 L+₹1.2 L (5.26%) | L2 | Rejected-Finance Unsuccessful |
Tender Value
₹23.9 L
EMD Value
₹23,800
Closing Date
1 Jun 2026, 5:00 pmClosed
S.E.M.I.D, Dhenkanal
S.E.M.I.D, Dhenkanal
Improvement to Dhaneibandha MIP(D/w) in Gondia Block of Dhenkanal District under Improvement to Diversion Weir scheme for the year 2026-27
2026_CEMIB_129585_3
DMID/01/2026-27
Open Tender
Civil Works - Canal
Percentage
S.E.M.I.D
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹23,800
Yes
11 Sept 2026
22 May 2026
2 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing shrub jungles uprooting stumps and small bushes and trees 1 M girth on premeasurement …etc Complete as per the direction of the Engineer- in -Charge | - | One Sqm | 0.27 | - |
| 2 | Excavation of earth work in base stripping, outfall drain benching with all lead and lifts including rough dressing and levelling the bed to proper level etc complete in all respects as directed by the Engineer-in-charge of the work. | - | One Cum | 259.1 | - |
| 3 | Excavation ,loading,unloading and carriage by mechanical means of all kinds of soil including stoney earth , gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from site as per the specification and as directed by the E.I.C within an initial lead of1km from the place of excavation complete as per the direction of the Engineer- in -Charge | 1 | One Cum | 82 | ₹81.92 |
| 4 | Filling in foundaiton and plinth with sand including watering and ramming etc.complete including cost, conveyance ,royalty and all other taxes of all materials with supply of all labour and T & P required for the work etc.complete in all respect as directed by the Engineer in Charge. | - | One Cum | 908.9 | - |
| 5 | Filling in foundaiton and plinth with excavated material including watering and ramming etc.complete including cost, conveyance ,royalty and all other taxes of all materials with supply of all labour and T & P required for the work etc.complete in all respect as directed by the Engineer in Charge | - | One Cum | 54.67 | - |
| 6 | Cement Concrete work with cement concrete M-15 grade with crushed granite 20mm down graded course aggregate of approved quality mixing by concrete mixer including hoisting, lowering and laying the concrete in position to proper slope and level and compacting by Vibrators in layers .not exceeding 0.15m depth and finishing exposed surface smooth including watering, curing for required period with cost, conveyance, royalty and other taxes of all materials including all labour and T&P materials required for the item including hire and running charges of the machineries complete in all respect as directed by the Engineer-in-charge. | 1 | One Cum | 5,528.6 | ₹5,523.07 |
| 7 | Cement Concrete work with cement concrete M-20 using 20 mm down graded hard granite chips of approved quality mixing by concrete mixer including hoisting, lowering and laying the concrete in position to proper slope and level and compacting by Vibrators in layers .not exceeding 0.15m depth and finishing exposed surface smooth including watering, curing for required period with cost, conveyance, royalty and other taxes of all materials including all labour and T&P materials required for the item including hire and running charges of the machineries complete in all respect as directed by the Engineer-in-charge. | - | One Cum | 5,921.1 | - |
| 8 | Straightening, cutting, bending, binding, fitting and placing uncoated HYSD bar reinforcement and laying in position including cost of binding wire 18 to 20 gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost ,conveyance & all taxes of reinforcement as directed by the Engineer-in-charge. | - | One Qntl | 9,099.2 | - |
| 9 | Providing rigid shuttering with the box type steel shuttering plates with keys for intermediate construction joints in rafts of weir, barrage and dam blocks including cost of materials, labour, T & P etc. complete as directed by the Engineer in charge including removal of forms. | - | One Sqm | 322.2 | - |
| 10 | Rough stone dry packing in approns and revetments to all heights and thickness using hard granite stone of 30 Cm and above laterite of 1cutf and above size weighing 160 Lbs/Cft and above of approved quality free from weathered skin including filling the interstices with small stones by edging and hammering to proper slope and level with cost, conveyance, royalty and other taxes of all materials including all labour and T&P materials required for the item complete in all respect as directed by the Engineer-in-charge. (1/6th volume is to be deducted towards voids.) | - | One Cum | 2,462 | - |
stage.html
html • 0.16 MB
tech_eval.pdf
fin_eval.pdf
finance_592107.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.46 MB
BOQ_592107.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .