| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹97.2 LAccepted-AOC FLAT NO 401 C ASTRO GREEN APARTMENT CHANDNI CHOWK KANKE ROAD MORABADI RANCHI 834008 | RANCHI | RANCHI | JHARKHAND | 834008 | ₹97.2 L Quoted ₹97.7 L | l1 | Accepted-AOC DECISION |
| 2 | l2₹98.2 LRejected-Finance W O SUBODH KUMAR KEDAL FURHARA TOLI KEDAL RANCHI 835217 | RANCHI | RANCHI | JHARKHAND | 835217 | ₹98.2 L | l2 | Rejected-Finance Decision |
| Sl No | Description | Qty | Unit | M/S ALLIANCE ENTERPRISES L2 | ROYAL INSTRUMENT INDIA PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | E/W in excavation in foundation trenches in ordinary soil (vide classification of soil item - A) and disposal of excavated earth as obtain to a distance upto 50 M. including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete job as per specification and direction of E/I. (5.1.1) BCD PART B | 1,655.54 | M3 | 159.41 ₹2,63,911.29 | 158.65 ₹2,62,654.57 |
| 2.00 | Providing coarse clean sand filling in foundation trenches and plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all material, labour, royalty and taxes all complete job as per specification and direction of E/I. (Mode of measurement compacted volume) (7.1.37) WRD PART B | 19.73 | M3 | 613.64 ₹12,107.14 | 610.72 ₹12,049.48 |
| 3.00 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete job as per specification and direction of E/I. (7.7.14) WRD PART B | 73.4 | M2 | 370.97 ₹27,228.83 | 369.2 ₹27,099.17 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (5.3.1.2) BCD PART B | 25.97 | M3 | 4,828.14 ₹1,25,386.83 | 4,805.15 ₹1,24,789.75 |
| 5.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (5.3.9.2) BCD PART B | 2.97 | M3 | 5,097.23 ₹15,138.76 | 5,072.95 ₹15,066.67 |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) (5.3.9.1) BCD PART B
Tie Beam | 44.57 | M3 | 5,478.9 ₹2,44,194.57 | 5,452.81 ₹2,43,031.74 |
| 7.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) (5.3.10) BCD PART B
In Column | 18.07 | M3 | 6,386.57 ₹1,15,405.37 | 6,356.16 ₹1,14,855.82 |
| 8.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). (5.3.11) BCD PART B
In Lintal | 10.54 | M3 | 6,624.31 ₹69,820.26 | 6,592.77 ₹69,487.79 |
| 9.00 | Providing designation 75A brick work in C.M. (1:6) in Foundation and Plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm thick mortar joints, cost of screening materials, raking out joints to 15 mm depth, curng, taxes and royalty all complete job as per specification and direction of E/I. (5.2.3) BCD PART B | 17.49 | M3 | 5,711.84 ₹99,900.13 | 5,684.64 ₹99,424.41 |
| 10.00 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). (5.3.5) BCD PART B | 8.62 | M2 | 292.27 ₹2,519.35 | 290.88 ₹2,507.35 |
Tender Value
₹93.5 L
EMD Value
₹94,000
Closing Date
10 Jul 2025, 5:00 pmClosed
E.E. M.I.DIV. KHUNTI
E.E. M.I.DIV. KHUNTI
Construction of Bandh Toli Solar Lift Irrigation Scheme in Block-Khunti, Dist.-Khunti.
2025_WRD_102815_1
WRD/MID/KHUNTI/BD/SLI-02/25-26
Open Tender
Civil Works
335 days
KHUNTI
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹94,000
30 Jun 2026
3 Jul 2025
12 Jul 2025
3 Jul 2025
10 Jul 2025
3 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid