| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.4 CrAccepted-AOC GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | ₹2.4 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹2.5 Cr+₹16.6 L (7.00%)Rejected-AOC | ₹2.5 Cr+₹16.6 L (7.00%) | L-2 | Rejected-AOC L-2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-NIVIDA SHARAT NO. 10 AND CHCEK LIST NO. 06 |
Tender Value
₹2.6 Cr
EMD Value
₹5.3 L
Closing Date
18 Nov 2023, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE VTH CIRCLE IW BAREILLY
Nai Sharda devha poshak nahar ki shamta bridhi hetu atirikit head regulator ka nirman ka karye.
2023_UPIDC_858104_1
03/SE/2023-24
Open Tender
Civil Works
Item Rate
120 days
UDHAM SINGH NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Yes
₹5.3 L
Yes
1 Dec 2023
1 Nov 2023
18 Nov 2023
1 Nov 2023
18 Nov 2023
1 Nov 2023
Amount
Cleaning thick bushes and thorny jungle without uprooting. labour,material and T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Earth work in foundation in all type of soil including all lifts and leads , back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth to required distance from the foundation trenches As Per directed by Engineer- in-Charge for proper completion of work.
Providing & Laying Coarse sand including all cost of material, labour, T & P etc. below C.C. Block As Per directed by Engineer- in-Charge for proper completion of work.
Providing & Laying 150 mm Thick sand with stone ballast 45 to 90 mm including all cost of material , labour , T&P etc. in raft foundation and Floor As Per directed by Engineer- in-Charge for proper completion of work.
Laying Cement Concrete M10 (1:3:6) cement, course sand, shingle/grit 12-20 mm. size Including cost of all materials, labour, T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Laying Cement Concrete M20 (1:1.5:3) cement, course sand, shingle/grit 12-20 mm. size Including cost of all materials, labour, T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Cement concrete with course sand, shingle/grit 12-20 mm. size in R.C.C. (M-25) work including all cost of material, labour and T&P etc. but excluding centering, shuttering and reinforcement As Per directed by Engineer- in-Charge for proper completion of work.
Laying Cement Concrete M25 (1:1:2) cement, course sand, shingle/grit 12-20 mm. size Including cost of all materials, labour, T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Centering and Shuttering for C.C. Blocks and all concrete including cost of shuttering ,materials, labour, T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Laying Shingle as filter 4 to 20 mm including all cost of material , labour , T & P etc. in floor and pitching of slope As Per directed by Engineer- in-Charge for proper completion of work.
Laying Boulder pitching 20 to 40 kg. weight including all cost of material , labour , T & P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Providing & Laying 10 mm stone grit including all cost of material , labour , T & P etc. Below CC Block As Per directed by Engineer- in-Charge for proper completion of work.
Providing & Laying 20 mm stone grit including all cost of material , labour , T & P etc. Below CC Block As Per directed by Engineer- in-Charge for proper completion of work.
Centering & Shuttering for R.C.C work with cost of centering & Shuttering all height including all cost ,materials, labour, T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Centering & Shuttering for R.C.C work with cost of centering & Shuttering for R.C.C. work - For bridge slab including all cost of material, labour, T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Centering and shuttering of C.C. work including shuttering material, labour and T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Bending, binding, cutting and placing of reinforcement including cost of binding wire and cost of steel, labour,T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Fixing P.V.C seal in position as per direction of engineer in charge including all cost of material , labour , T&P etc. all lead, lift vulcanizing etc. for proper completion of work.
Supplying & Fixing Joint Filler Board in expansion joint including cost of material, labour & T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Supply and Providing weepholes in reinforced cement concrete and cement concrete structures with 100mm dia A.C. pipe extending through full width of structure with one face covered with 200GSM geotextile sheet and placed with slope of 1V:20H facing towards drainage side including all labour cost of material, labour & T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
S/F of 100 mm dia (Length = 0.60 m) drainage spout pipe including cost of material, labour & T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Earth work for new channel in cutting or in embankment in all Type of soil, excavation to be in the form of regular pits and earth work in embankment including ramming and dressing the surface to the required levels and slopes and also including all lifts and leads . The earth from cutting to be used in making embankment or to be deposited as spoil bank As Per directed by Engineer- in-Charge for proper completion of work.
Hiring of diesel pumps 5HP for dewatering regarding coffer dam and also all foundations including operator and POL. As Per directed by Engineer- in-Charge for proper completion of work.
Boring 15 M depth in all type of strata and all soils regarding coffer dam and all foundations As Per directed by Engineer- in-Charge for proper completion of work.
Filling empty cement bags with local earth, hand sewing with suja & sutli and placing in position for coffer dam Including cost of all materials, labour, T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Providing and laying for coffer dam 150 L.D.P.E. film for protection water seepage including all cost of material,labour and T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Filling Geo Bags with local earth and placing in position for coffer dam Including cost of all materials, labour, T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
Earth work in embankment by power tranported earth with all lead and lift for coffer dam including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders As Per directed by Engineer- in-Charge for proper completion of work.
Dismentaling coffer dam and safety bund after work completion and its disposal including cost of all materials, labour, T&P etc. As Per directed by Engineer- in-Charge for proper completion of work.
M/S J.V. CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .