Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 CrAccepted-AOC | ₹9.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹9.9 Cr+₹17.8 L (1.83%)Rejected-Finance | ₹9.9 Cr+₹17.8 L (1.83%) | L2 | Rejected-Finance Rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical Due to return EMD fee |
Tender Value
₹15.0 Cr
EMD Value
₹30.0 L
Closing Date
30 Dec 2024, 12:00 pmClosed
SE BSR Circle PWD Bulandshahr
SE BSR Circle PWD Bulandshahr
Widening and Strengthening of Syana Unchagaon Bhadkau Narsena Nahar Patri to Heerapur Kalan Nahar Patri road (ODR) from Km 44 to 54(700) in District Bulandshahr
2024_CEMRT_986055_1
8753/96M/E-Tender/BSR Circle/2024-25 dt. 06.12.2024
Open Tender
Civil Works - Roads
Item Wise
365 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹30.0 L
Yes
SE BSR Circle PWD Bulandshahr
14 Feb 2025
23 Dec 2024
30 Dec 2024
23 Dec 2024
30 Dec 2024
23 Dec 2024
23 Dec 2024 - 24 Dec 2024
24 Dec 2024
Amount
Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and samplings of grith upto 30 cms.measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50M. out side the periphery of area cleared as per item no. 259(i) Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (3.17) Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Construction of embankment with approved material obtained from Right of way pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (3.16) Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.(For Embankment)
Construction of sub-grade and earthen shoulders with approved material obtained from Right of way pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. MORT&H Specification 305 Sr No 3.18 Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST. (For Patri)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. MORT&H Specification 406 Sr No 4.14..Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing, laying, spreading and compacting graded stone aggregate to ETA/wet mix macadam conforming to table 400-13 of MORTH specification including premixing the Material with water at OMC in mechanical mix plant with 1% Ordinary Portland Cement and 3.5% Emulsion SS-2 Stab,carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Including cost of, all material, labour, T&P, Royalty, labour cess etc. complete but excluding GST.
Providing and applying tack coat with vg-10 bitumen using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. MORT&H Specification 503 .Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Construction of sub-grade and earthen shoulders with approved material obtained from Right of way with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. MORT&H Specification 305 Sr No 3.18 Including cost of all material, labour, T&P, and all taxes complete Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST. (Carted Earth)
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. Including cost of all material, labour, T&P, and all taxes complete Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Construction of un-reinforced dowel jointed at expansion and construction joint only,plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including cost of all material, labour, T&P, and all taxes complete Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Supply and fixing of 350 mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Plain/Reinforced Cement Concrete(RCC Grade M-30) for wall and slab etc. compelete as per drawing and Technical Specifications. Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing weep holes in Brick masonry /Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Providing and fixing in position 20 mm thick pre moulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant completeas per drawing and technical specifications. Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification MORTH . Including cost of all material, labour, T&P, and all taxes complete but excluding cost of GST.
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of First Year @0.00% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Second Year @0.25% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Third Year @0.50% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fourth Year @0.75% of Total Work Amount)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fifth Year @1% of Total Work Amount)
SHREE GANESH ASSOCIATES (BID ID -4822784)
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1738274.xls
BOQ • 0.30 MB
159318322.pdf
Tender Documents • 0.88 MB
159318323.pdf
Tender Documents • 1.33 MB
159318325.html
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .