| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 LAccepted-Finance | ₹37.7 L | L1 | Accepted-Finance as per financial evaluation |
| 2 | L2₹38.0 LRejected-Finance | ₹38.0 L | L2 | Rejected-Finance as per financial evaluation |
| Sl No | Description | Qty | Unit | M.Arumugam L2 | SKP AND CO L1 |
|---|---|---|---|---|---|
| 1.00Providing CC Pavement (159m) from Vellakkalpatti main road to Malliga house H/O Chettichavadi | |||||
| 2.00 | Earth work Excavation in all soils & Sub Soil to full
depth as may be directed except in hard rock
requiring blasting but inclusive of shoring strutting,
Sectioning the street to lay concrete pavement per
SS 20 B. | 19.08 | cum | 132 ₹2,518.56 | 131.85 ₹2,515.70 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG
metal for foundation including watering wherever
necessary and laid in layers of not more than 15cm
thick., compacting etc., complete | 73.78 | cum | 5,485 ₹4.0 L | 5,479.26 ₹4.0 L |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc,.
complete | 190.8 | sqm | 550 ₹1.0 L | 547.34 ₹1.0 L |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two
M.Sand and four hard broken stone jelly) using
20mm jelly for wearing coat including laying,
compacting, finishing and curing, etc., complete as
per standard specificatins and as directed by the
departmental officers. | 75.6 | cum | 6,775 ₹5.1 L | 6,769.92 ₹5.1 L |
| 6.00 | Provision for Bitumen pad | 24 | sqm | 240 ₹5,760 | 234.3 ₹5,623.20 |
| 7.002.Construction of CC drainage (154m) with Horizontal filter from Prakash kadu to OHT at Nelliyakaradu H/o Chettichavadi | |||||
| 8.00 | Earth work excavation for foundation in all soils and
sub soils to full depth etc., ordinary soil complete | 110.88 | cum | 200 ₹22,176 | 197.78 ₹21,929.85 |
| 9.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand
and eight hard broken stone jelly) using 40 mm
gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid inlayers of not more than 15 cm thick, well rammed,consolidated and curing etc. complete complying with standard specification | 18.48 | cum | 5,485 ₹1.0 L | 5,479.26 ₹1.0 L |
| 10.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc,.
complete | 376.1 | sqm | 550 ₹2.1 L | 547.34 ₹2.1 L |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
27 Feb 2026, 3:00 pmClosed
S.Karthikeyan
BDO VP Salem
Package Tender no.2 Salem Block - Peri Urban (Panchayat Fund) 2025-26 - Providing CC Pavement, CC Drainage,Stregnthing road at chettichavadi
2026_RDTN_663755_1
533-2026-T3
Open Tender
Civil Works
BDO Office
as per document
3 documents required · 3 mandatory
₹0
₹80,000
Yes
7 Mar 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
Providing CC Pavement (159m) from Vellakkalpatti main road to Malliga house H/O Chettichavadi
Earth work Excavation in all soils & Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc,. complete
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Provision for Bitumen pad
2.Construction of CC drainage (154m) with Horizontal filter from Prakash kadu to OHT at Nelliyakaradu H/o Chettichavadi
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid inlayers of not more than 15 cm thick, well rammed,consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc,. complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators,finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
3. Strengthening the road from Nelliyakaradu main road to Jaganathan house Km 0/0-0/515
Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite, spreading the mix to uniform thickness of 40mmwith mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 tCMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and laying of hot Road Making with Hot Applied Thermoplastic compound with eflectorising glass beads @ 250GMs per Sqm area, thickness of 2.50mm is exclusive of surface applied glass beads as per IRC:35, The Finished surface to be level uniform and free from Streaks and holes etc., Complete as per MORTH&H Specification No.803
Provision for Hecta Metre Stone - Nos
Provision for Sign board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
Techdoc.pdf
Tender Documents • 0.79 MB
BOQ_797004.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid