Development of Deck salb and installation of Covering slabs in AK Colony Antrasanahalli in ward no 2 under tumkur city corporation limits
DMA/2026-27/OW/WORK_INDENT57141
DMA/2026-27/OW/WORK_INDENT57141
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Tumakuru
3 documents required · 3 mandatory
₹500
₹5,245
5 May 2026
18 Apr 2026
23 Apr 2026
Development of Deck salb and installation of Covering slabs in AK Colony Antrasanahalli in ward no 2 under tumkur city corporation limits
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating Each depos...
Providing and laying 100mm thick pre-cast cover slabs over drains & Rain pit of width not exceeding 800 mm using M20 concrete reinforced with Micro Alloyed High carbon steel with 3mm - 3ply ...
Addendum I-Percentage Additionalities for Formwork,Centering & Scaffolding Consider 35% of item concrete rate for Drain walls(rate=6221*35%)
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate.
Consider 5% of item concrete rate for drain bed...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW1 57141.doc
Tender Document • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .