Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹120.9 CrAdmitted-Finance GROUND FLOOR PLOT NO 41 GREEN WOODS SOCIETY PHASE II OMEHA NEAR P3 PARICHAWK NAGAR U P 201308 | ₹120.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹122.9 CrAdmitted-Finance | ₹122.9 Cr | L2 | Admitted-Finance |
| 3 | L3₹124.5 CrAdmitted-Finance A 760 SUSHANT LOK PHASE 1 GURGAON 122002 HARYANA INDIA | ₹124.5 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical 223 U S COMPLEX SECOND FLOOR JASOLA MATHURA ROAD NEW DELHI 110076 | SOUTH | DELHI | 110076 | - | - | Rejected-Technical Technically Non-Qualified |
| Sl No | Description | Qty | Unit | SIVANSSH INFRASTRUCTURE DEVELOPMENT PRIVATE LIMITED L2 | comt constructions pvt ltd L3 | Mahalasa Constructions Private Limited L1 |
|---|---|---|---|---|---|---|
| 1.00PART A: MAIN WORK: | ||||||
| 1.01Planning, Designing, and Construction on EPC Basis with required all services and utilities including handing over complete as per scope of Work and directions of Engineer In charge: | ||||||
| 1.02 | Hospital Building as per scope of Work and directions of Engineer In charge | 15,889 | Sqm | 61,900 ₹98.4 Cr | 62,350 ₹99.1 Cr | 62,000 ₹98.5 Cr |
| 1.03 | Sewage Line as per scope of Work and directions of Engineer In charge | 200 | m | 500 ₹1 L | 5,200 ₹10.4 L | 5,000 ₹10 L |
| 1.04 | Green Boundary Wall as per scope of Work and directions of Engineer In charge | 43 | m | 9,300 ₹4.0 L | 48,000 ₹20.6 L | 40,000 ₹17.2 L |
| 1.05 | Providing Trench for laying of Oxygen Pipeline Connection with existing LMO including providing and laying of Copper pipeline as per scope of Work and directions of Engineer In charge | 300 | m | 4,000 ₹12 L | 7,600 ₹22.8 L | 7,500 ₹22.5 L |
| 1.06 | Open Parking Area Development as per scope of Work and directions of Engineer In charge | 1,000 | Sqm | 1,800 ₹18 L | 18,200 ₹1.8 Cr | 18,000 ₹1.8 Cr |
| 1.07 | MGPS System as per scope of Work and directions of Engineer In charge | 1 | LS | 5,00,000 ₹5 L | 3,10,00,000 ₹3.1 Cr | 3,00,00,000 ₹3 Cr |
| 1.08 | Augmentation of existing 10KL LMO tank to 20KL as per scope of Work and directions of Engineer In charge | 1 | Job | 10,00,000 ₹10 L | 80,00,000 ₹80 L | 60,00,000 ₹60 L |
| 1.09 | Connecting bridge from NCA Building to Super Specialty block at 2nd floor level as per scope of Work and directions of Engineer In charge | 1 | Job | 10,00,000 ₹10 L | 85,00,000 ₹85 L | 75,00,000 ₹75 L |
Tender Value
₹125.6 Cr
EMD Value
₹1.1 Cr
Closing Date
1 Jan 2024, 3:00 pmClosed
VP(ID)
HITES, B-14, Sec 62, Noida-201307
Construction of National Centre of Ageing at IMS, BHU, Varanasi On Design, Engineering, Procurement and Construction on EPC Basis
2023_HITE_177289_1
HITES/IDN/NCA-BHU/EPC/2023
Open Tender
Civil Works - Buildings
540 days
Varanasi
as per NIT
17 documents required · 17 mandatory
₹53,600
HITES
₹1.1 Cr
HITES, NOIDA
17 Jan 2024
9 Dec 2023
2 Jan 2024
9 Dec 2023
1 Jan 2024
16 Dec 2023
15 Dec 2023
Amount
PART A: MAIN WORK:
Planning, Designing, and Construction on EPC Basis with required all services and utilities including handing over complete as per scope of Work and directions of Engineer In charge:
Hospital Building as per scope of Work and directions of Engineer In charge
Sewage Line as per scope of Work and directions of Engineer In charge
Green Boundary Wall as per scope of Work and directions of Engineer In charge
Providing Trench for laying of Oxygen Pipeline Connection with existing LMO including providing and laying of Copper pipeline as per scope of Work and directions of Engineer In charge
Open Parking Area Development as per scope of Work and directions of Engineer In charge
MGPS System as per scope of Work and directions of Engineer In charge
Augmentation of existing 10KL LMO tank to 20KL as per scope of Work and directions of Engineer In charge
Connecting bridge from NCA Building to Super Specialty block at 2nd floor level as per scope of Work and directions of Engineer In charge
PART B: O&M and CMC
Providing operation and comprehensive maintenance (CMC) and Annual Maintenance of Part A Above as per scope of Work and directions of Engineer In charge:
Operation, CMC & AMC for 1st year
Operation, CMC & AMC for 2nd year
Operation, CMC & AMC for 3rd year
Operation, CMC & AMC for 4th year
Operation, CMC & AMC for 5th year
SIVANSSH INFRASTRUCTURE DEVELOPMENT PRIVATE LIMITED
comt constructions pvt ltd
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid