Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC SHANTINAGAR SHIVNANDANPUR BISHRAMPUR BISHRAMPUR SURGUJA CHHATTISGARH 497226 | SURAJPUR | CHHATTISGARH | 497226 | ₹16.9 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹17.2 L+₹32,126.92 (1.90%)Rejected-Finance SHANTINAGAR BISHRAMPUR DISTT SURAJPUR C G | BISHRAMPUR | SURAJPUR | CHHATTISGARH | ₹17.2 L+₹32,126.92 (1.90%) | L2 | Rejected-Finance Not Being L1 |
| 3 | L3₹19.5 L+₹2.6 L (15.3%)Rejected-Finance | ₹19.5 L+₹2.6 L (15.3%) | L3 | Rejected-Finance Not Being L1 |
| 4 | L4₹24.1 L+₹7.2 L (42.7%)Rejected-Finance KUMDA COLONY KUMDA DISTT SURAJPUR C G DIST SURAJPUR C G 497226 | KUMDA | SURAJPUR | CHHATTISGARH | 497226 | ₹24.1 L+₹7.2 L (42.7%) | L4 | Rejected-Finance Not Being L1 |
Tender Value
₹25.4 L
EMD Value
₹31,750
Closing Date
4 Jan 2023, 5:00 pmClosed
Chief Manager (C)/OSD
Chief Manager (C)/OSD G.M. Office SECL Bishrampur Area
RCC Box Culvert in place of damaged steel puliya over passing nallah to approach raw water sump kumda township of Bishrampur Area.
2022_SECL_265250_1
GM/BSPR/Civil/e-tender/ 2022-23/50 Dt.17.12.2022
Open Tender
Civil Works - Others
Item Rate
120 days
Kumda Sub Area
As Per NIT
3 documents required · 3 mandatory
₹31,750
2 Feb 2023
19 Dec 2022
6 Jan 2023
19 Dec 2022
4 Jan 2023
20 Dec 2022
19 Dec 2022 - 26 Dec 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works above plinth level upto floor V level
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and walls Above 20 cm wide
Total impact of GST for the purpose of CTC
M/S UDAY KUMAR SINGH
RAKESH ASSOCIATES
ASHOK KUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_274358.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .