Loading…
Loading…
Tender Value
₹20.6 L
EMD Value
₹2.1 L
Closing Date
26 Sept 2026, 1:00 pmDue tomorrow
EO
NPP Etawah
10. Beautification work of Tikonia near Manohar Colony in Mohalla Civil Line.
2026_DOLBU_1182777_10
2568/J.N.V./E-Ni.su./2026-27 date 02.09.2026
Open Tender
Construction Works
Percentage
90 days
Etawah
Please refer Tender documents
2 documents required · 2 mandatory
₹2,832
EO
₹2.1 L
7 Sept 2026
7 Sept 2026
26 Sept 2026
7 Sept 2026
26 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation in ordinary soil (loam, clay or sand) including lift up to 1.50m and leadup to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed bytheEngineerinchargeuptoadistanceof30m from the foundation trenches.(S.I No. 251), FoundationWall(1ststep), (2ndstep), (3rdstep), Column, Less. | 28.19 | m3 | 145 | ₹4,087.55 |
| 1.02 | Earth work in embankment mechanically compacted to 95% proctor density in ordinary soil excavation to be done in form of regular pits not exceeding ½ M in depth and earth work to bedone in 20 cm. layers including ramming and dressing pulvarization the surface to requiredleves and slopes and also including 1.5M lift and 30 M lead. The earth from cutting to be used in making embankemnt or to be deposited as spoil banks within 30 M distance as directed by the Engineer incharge including supply of roller and water required for proper completion of work as per MOST specification No.301.2.1 Including. | 75.2 | m3 | 319 | ₹23,988.8 |
| 1.03 | Providing and laying cement concrete in 1:4:8 (1 cement: 4 coarse sand: 8 Stone Ballast 40 mm gauge) and curing complete including cost of form work in foundation and floors.(S.I.No..281), Foundation Wall (1ststep), 2ndstep), 3rdstep), Column, Less. | 20.05 | m3 | 6,000 | ₹1,20,300 |
| 1.04 | Class-150 brick in1:3 Cement and coarses and of 1.25FM mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (S.I. No. 307), Foundation Wall (1ststep), 2ndstep), 3rdstep), Less Column. | 12.11 | m3 | 6,600 | ₹79,926 |
| 1.05 | Class-150 brick in 1:3 Cement and coarses and in Super structure all materials, labour and tools and plants, etc. required for proper completion of thework.(S.I.No.307+309), (1ststep), 2ndstep), 3rdstep), Stairs, Surface. Less Column. | 52.63 | m3 | 6,970 | ₹3,66,831.1 |
| 1.06 | 12mm thick cement plaster with cement mortorin proportion of 1:3 Cement & coarse sand of single coat on fair side of single or hair brick well for interior plastering upto floor two level including brick wall for plastering upto floor two level including internal rounded angles not exceeding 80 mm in girth, chemfers and finished even and Stooth. No. extra for mixing any 1 cement : 3coarsesand(S.I.No.13.9), (1ststep), 2ndstep), 3rdstep), | 76.92 | m2 | 210 | ₹16,153.2 |
| 1.07 | R.C.C work with cement approved course sand and 2 cm gauge approved grite in the proportion of 1: 1.5: 3 in Column excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 BWGGI bindingwireandincludingthecostofbindingwire moulds all other material labour & T&P etc. required for preparation of the work binding wire, costbeing includingintheitem.(S.I.No-289), Raft, Column. | 3.69 | m3 | 8,800 | ₹32,472 |
| 1.08 | R.C.C work with cement approved course sand and 2 cm gauge approved grite in the proportion of 1: 2: 4 in beam excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 BWGGI binding wire and including the cost of binding wire moulds all other material labour & T&P etc. required for preparation of the work binding wire, costbeing including in the item. (S.I.No-285), Plinth Beam | 0.99 | m3 | 8,400 | ₹8,316 |
| 1.09 | R;C;C work with cement approved coarse Sand and 2 cm gauge approved Stone ballast in the proportionof1:1.5:3inSlabexcludingsupplyof reinfocement and its binding but including its fixing and binding the same with 24 B,W,G ,G ,i vinding wire and including necessary crent ering shuttering etc .and also incluing supply of all materiallavourandt&petc butforSlab(S.I.No. 283), For Stairs Less Column. | 5.08 | m3 | 8,300 | ₹42,164 |
| 1.1 | Mild Steel of Iron in plain work such as reinforced concert of reinforcement wrought to required shape as necessary including benefited for proper completion for the work and including supply of all steel and wastage and over lapping and hooks.(S.I.No.504), Column, Beam, Slab. | 9.31 | Qtl | 7,050 | ₹65,635.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2224493.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .