Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | -1.00% | ₹1.4 L | L1 | Admitted-Finance |
| 2 | L2₹1.4 LAdmitted-Finance 62 PINK ROSE COLONY KAIMARI ROAD 125001 | HISAR | HARYANA | 125001 | +1.00% | ₹1.4 L | L2 | Admitted-Finance |
Tender Value
₹1.4 L
EMD Value
₹2,800
Closing Date
18 Jun 2026, 11:00 amClosed
Executive Engineer, HSVP, Elect, Division, Hisar
Executive Engineer, HSVP, Elect, Division, Hisar
Providing Copper Pipe and Core Cutting in RCC Beam and Brick Wall for installation of 1.5TR Split Air Conditioner in Gymkhana Building, Sector 14 at Bhiwani.
2026_HBC_526515_2
Job No. 34/26
Open Tender
Electrical Works
Hisar
Providing Copper Pipe and Core Cutting in RCC Beam and Brick Wall for installation of 1.5TR Split Air Conditioner in Gymkhana Building, Sector 14 at Bhiwani.
2 documents required · 2 mandatory
₹250
₹2,800
Yes
18 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 22.86.3
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge.25 mm nominal outer dia Pipes | 120 | Meter | 333 | ₹39,960 |
Job Work
Supply and erection of copper pipe 1/2” (in pair) for 1.5 TR Split A.C. complete in all respect upto the entire satisfaction of Engineer-in-Charge. (Excluding GST) | 9 | Feet | 205 | ₹1,845 | |
Job Work
Supply and erection of copper pipe 1/4” (in pair) for 1.5 TR Split A.C. complete in all respect upto the entire satisfaction of Engineer-in-Charge. (Excluding GST) | 9 | Feet | 120 | ₹1,080 | |
Job Work
Supply and erection of thermal Insulation for copper pipe of 1.5 TR Split A.C. complete in all respect upto the entire satisfaction of Engineer-in-Charge. (Excluding GST) | 9 | Feet | 10 | ₹90 | |
Job Work
Core cutting of 100 mm dia and 300mm long in Brick Wall. (Excluding GST) | 10 | Each | 1,980 | ₹19,800 | |
Job Work
Core cutting of 100 mm dia and 450mm long in RCC Beam. (Excluding GST) | 10 | Each | 7,700 | ₹77,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.62 MB
BOQ_607347.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid