Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC GRAM JABBUPUR POST KAIMGANJ ZILA FARRUKHABAD UTTAR PRADESH | KAIMGANJ | FARRUKHABAD | UTTAR PRADESH | L1 | Accepted-AOC Bidder is L1 | |
| 2 | L2₹1.1 Cr+₹67,764.53 (0.64%)Rejected-Finance 1 37 SANGAT FATEHGARH JANPAD FARRUKHABAD | FARRUKHABAD | FARRUKHABAD | UTTAR PRADESH | L2 | Rejected-Finance Quoted Amount is not Lowest. Bidder is L2 | |
| 3 | L3₹1.1 Cr+₹4.9 L (4.59%)Rejected-Finance MUGALGARHI MAJRA FULRAI TEHSEEL SIKANDRARAO HATHRAS | L3 | Rejected-Finance Quoted Amount is not Lowest. Bidder is L3 | |
| 4 | L4₹1.2 Cr+₹14.3 L (13.4%)Rejected-Finance OPPOSITE PAC GATE NO 0 1 KUNERA ETAWAH | ETAWAH | ETAWAH | UTTAR PRADESH | L4 | Rejected-Finance Quoted Amount is not Lowest. Bidder is L4 |
| Sl No | Description | Qty | Unit | SHRI MAHRAJ JI CONSTRUCTION L2 | M/S Vinay Construction L4 | AKHILESH KUMAR GANGWAR L1 | Anil Kumar L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | (A) Construction of Box Culvert at Km. 71.075
Earthwork excavation in foundtion in dry ordinary soil (Loam,clay or sand) including lift upto 1.50 m. and lead upto 30m and including filling,watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removed and disposal of surplus earth as per directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches. | 313.62 | Cum | 40.8 ₹12,795.7 | 90 ₹28,225.8 | 2 ₹627.24 Lowest | 71.24 ₹22,342.29 |
| 2.00 | Plain Cement Concrete with 40mm gauge stone ballast down graded, coarse sand of 2.5 fineness modulus and cement in proportion of 1:3:6 in base, foundation including supply of all material, Labour, tools and plants etc. Required for proper completion of the work as per directed by the Engineer-in-charge. | 50.65 | Cum | 3,500 ₹1,77,282 Lowest | 6,000 ₹3,03,912 | 6,200 ₹3,14,042.4 | 5,637.95 ₹2,85,573.44 |
| 3.00 | Shuttering & Centering work in box and wingwalls with MS Plates/ plywood panels of required shapes & sizes including all cost of material, Labour, tools and plants etc. required for proper completion of the work as per directed by the Engineer-in-charge. | 437.39 | Sq m | 700 ₹3,06,171.6 | 500 ₹2,18,694 | 400 ₹1,74,955.2 Lowest | 608.97 ₹2,66,356.17 |
| 4.00 | Provining Reinforced Cement Concrete with 10mm to 20mm gauge stone grit down graded, coarse sand of 2.5 fineness modulus and cement in proportion of 1:1:2 (M-25) in slab and parapet including supply of all material, Labour, tools and plants etc. Required for proper completion of the work as per directed by the Engineer-in-charge | 393.78 | Cum | 7,500 ₹29,53,357.5 | 8,000 ₹31,50,248 | 9,000 ₹35,44,029 | 7,345.63 ₹28,92,569.53 Lowest |
| 5.00 | Reinforcement steel - TMT (SAIL/Tiscon) Grade above Fe500 in reinforced cement concrete work brought to required shape as necessary including bending as per requirement and direction of Engineer-in-charge for proper completion of the work and including supply of steel its wastage, labour and T&P etc. complete (bend,hooks and authorised overlapping in reinforcement shall be measured. | 44.95 | MT | 70,000 ₹31,46,150 | 80,000 ₹35,95,600 | 56,500 ₹25,39,392.5 Lowest | 72,737.83 ₹32,69,201.77 |
| 6.00 | Earth work in-filling for making ramps in all type soil with all lead & lift including all cost of material, Labour, tools and plants etc. required for proper completion of the work as per directed by the Engineer-in-charge. | 19.25 | Cum | 45 ₹866.25 | 70 ₹1,347.5 | 20 ₹385 Lowest | 56.68 ₹1,091.09 |
| 7.00 | Providing and Laying 1st class Brick ballast (40 mm nominal size) of thickness 150mm thick on Ramps including all cost of material, Labour, tools and plants etc. required for proper completion of the work as per directed by the Engineer-in-charge. | 5.78 | Cum | 500 ₹2,887.5 | 900 ₹5,197.5 | 200 ₹1,155 Lowest | 788.21 ₹4,551.91 |
| 8.00 | Finishing walls with exterior emulsion paint of best quality including supply of all material, labour and T&P etc. required for proper completion of work as per directed by the Engineer-in-charge. | 34.03 | Sq m | 50 ₹1,701.5 | 100 ₹3,403 | 20 ₹680.6 Lowest | 108.77 ₹3,701.44 |
| 9.00 | Providing and fixing wheel guard of size 750x200x200 mm including all cost of material, labour etc.and T&P etc. required for proper completion of work as per directed by the Engineer-in-charge. | 4 | Nos. | 750 ₹3,000 | 1,000 ₹4,000 | 100 ₹400 Lowest | 786.8 ₹3,147.2 |
| 10.00 | Preparation of subgrade excluding cost of earth work but including cutting and dressing of earth surface to required shape and size including all cost of material, Labour, tools and plants etc. required for proper completion of the work as per directed by the Engineer-in-charge. | 287.76 | Sq m | 10 ₹2,877.6 | 10 ₹2,877.6 | 5 ₹1,438.8 Lowest | 10.72 ₹3,084.79 |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
13 Aug 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office of The Superintending Engineer 2nd Circle Irrigation works Kanpur
Janpad Farrukhabad me Farrukhabad Sakha ke Km. 71.075 Ewam Km. 93.000 par Box Culvert ka Nirman Karya.
2026_UPIDC_1168139_2
13/S.E.-II/2026-27
Open Tender
Civil Works - Canal
Item Wise
365 days
District Farrukhabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,800
₹2.9 L
21 Sept 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (A) Construction of Box Culvert at Km. 71.075
Earthwork excavation in foundtion in dry ordinary soil (Loam,clay or sand) including lift upto 1.50 m. and lead upto 30m and including filling,watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removed and disposal of surplus earth as per directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches. | - | Cum | - | - |
| 2 | Plain Cement Concrete with 40mm gauge stone ballast down graded, coarse sand of 2.5 fineness modulus and cement in proportion of 1:3:6 in base, foundation including supply of all material, Labour, tools and plants etc. Required for proper completion of the work as per directed by the Engineer-in-charge. | 50.65 | Cum | - | - |
| 3 | Shuttering & Centering work in box and wingwalls with MS Plates/ plywood panels of required shapes & sizes including all cost of material, Labour, tools and plants etc. required for proper completion of the work as per directed by the Engineer-in-charge. | 437.39 | Sq m | - | - |
| 4 | Provining Reinforced Cement Concrete with 10mm to 20mm gauge stone grit down graded, coarse sand of 2.5 fineness modulus and cement in proportion of 1:1:2 (M-25) in slab and parapet including supply of all material, Labour, tools and plants etc. Required for proper completion of the work as per directed by the Engineer-in-charge | 0.4 | Cum | - | - |
| 5 | Reinforcement steel - TMT (SAIL/Tiscon) Grade above Fe500 in reinforced cement concrete work brought to required shape as necessary including bending as per requirement and direction of Engineer-in-charge for proper completion of the work and including supply of steel its wastage, labour and T&P etc. complete (bend,hooks and authorised overlapping in reinforcement shall be measured. | 44.95 | MT | - | - |
| 6 | Earth work in-filling for making ramps in all type soil with all lead & lift including all cost of material, Labour, tools and plants etc. required for proper completion of the work as per directed by the Engineer-in-charge. | - | Cum | - | - |
| 7 | Providing and Laying 1st class Brick ballast (40 mm nominal size) of thickness 150mm thick on Ramps including all cost of material, Labour, tools and plants etc. required for proper completion of the work as per directed by the Engineer-in-charge. | - | Cum | - | - |
| 8 | Finishing walls with exterior emulsion paint of best quality including supply of all material, labour and T&P etc. required for proper completion of work as per directed by the Engineer-in-charge. | - | Sq m | - | - |
| 9 | Providing and fixing wheel guard of size 750x200x200 mm including all cost of material, labour etc.and T&P etc. required for proper completion of work as per directed by the Engineer-in-charge. | - | Nos. | - | - |
| 10 | Preparation of subgrade excluding cost of earth work but including cutting and dressing of earth surface to required shape and size including all cost of material, Labour, tools and plants etc. required for proper completion of the work as per directed by the Engineer-in-charge. | 1 | Sq m | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.72 MB
BOQ_2207237.xls
BOQ • 0.27 MB
CorrigendumforTermsofConditionboxculvert.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .