| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.7 LAdmitted-Finance | -49.99% | ₹14.7 L | L1 | Admitted-Finance |
| 2 | L2₹15.9 LAdmitted-Finance | -45.98% | ₹15.9 L | L2 | Admitted-Finance |
| 3 | L3₹16.1 LAdmitted-Finance | -45.45% | ₹16.1 L | L3 | Admitted-Finance |
| 4 | L4₹23.0 LAdmitted-Finance | -21.99% | ₹23.0 L | L4 | Admitted-Finance |
Tender Value
₹29.5 L
EMD Value
₹58,920
Closing Date
9 Mar 2026, 6:55 pmClosed
Commissioner, Municipal Corporation Udaipur
Municipal Corporation Udaipur, Town Hall Link Road
Construction of remaining Nala work in Shikarwadi Road (e_38 / Nirman_03)
2026_DLB_542669_1
E_38_2025-26_Nirman_03
Open Tender
Civil Works
124 days
Udaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Commissioner, Municipal Corporation Udaipur
₹58,920
Yes
16 Mar 2026
26 Feb 2026
10 Mar 2026
26 Feb 2026
9 Mar 2026
26 Feb 2026
Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Cement Concrete Grade M-15 and above and PCC blocks
Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. In all type of soil
Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size).
Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).
Providing and fixing stone slab covering of required size over drains including filling of joints with cement sand mortar 1:3 complete as per direction of Engineer-in-charge. Average thickness 60 to 75 mm
Providing, hoisting and fixing upto two stories precast reinforced cement concrete in small lintels not exceeding 1.5m clear span upto two stories including the cost of required centring, shuttering and finishing smooth with 6 mm thick cement plaster 1:3 (1 cement : 3 fine sand) on exposed surfaces but excluding the cost of reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar
Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Hot rolled deformed bars
Neat cement punning
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_967320.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid